Canada’s Experiences & Perspectives on Joint Implementation JI Technical Workshop, Bonn, 9-10 March 2006 Jeanne-Marie Huddleston, Canada’s CDM & JI Office.

Slides:



Advertisements
Similar presentations
PoA Challenges & Opportunities
Advertisements

Regional Distribution
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
JI Governance – review of JI Guidelines
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
Implementing Decision 10/CMP.7 CCS in the CDM Tim Dixon IEA Greenhouse Gas R & D Programme UNFCCC 1 st SDM Workshop 25 March.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
1 CF Assist Activities in Central and Eastern Europe Helmut Schreiber Annual Meeting of the Host Country Committee on Carbon Finance February 15-16, 2005.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
The New Market Mechanism Emissions Trading – Developments in China & Europe Workshop 25 th April 2012 Dr Luke Redmond
Ms. Daniela Stoycheva Chair of the JISC COP/MOP 2, Nairobi 14 November 2006 JI Track 2 procedure and its role in JI Track 2 projects UNFCCC Side Event.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
1 Georg B ø rsting Chair of the JI Supervisory Committee Joint Implementation 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means to.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
Compilation and analysis of available information on ways and means to enhance equitable regional and subregional distribution of projects under the clean.
Learning from the CDM First UNFCCC workshop on Article 6 projects under the Kyoto Protocol May 2004 Moscow, Russian Federation John Shaibu KILANI.
Canada’s CDM & JI Office First UNFCCC Workshop on the Implementation of Article 6 Projects Under the Kyoto Protocol May , 2004 Moscow, Russia Jane.
Presentation by: Judith St-George - Director General
-2- Opportunities for CDM/JI Projects Renewable energy Electricity generation and transmission Energy efficiency Fuel switching Waste management Oil and.
“Establishment of the Clean Development Mechanism (CDM) National Authority, Operational Framework and Support Systems for the Philippines”
Canada’s CDM & JI Office: Role & Activities Presentation by Jane Desbarats Winnipeg, Manitoba March 14, 2003 Program Manager Canada’s CDM & JI Office.
1 Inter-linkages: BCH, Parties, Capacity Building, Compliance and RA Concept Sustainability Biosafety Programme - Secretariat of the Convention on Biological.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
ECONOLER INTERNATIONAL CDM/JI Office Canada Development of a Portfolio of CDM Projects in Indonesia Access to CDM & JI office of Canada facility Presented.
1 Canadian Approach to Convention Commitments: Technology Transfer Presentation for Workshop on Technology Needs Assessments Seoul, Korea April 24 rd,
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Overview of Capacity Development for CDM Project (CD4CDM) Jerba CDM Investment Forum, September 2004 Sami Kamel UNEP RISOE Center, Denmark.
Canada’s CDM & JI Office Project Facilitation Support Through Canada’s CDM and JI Office.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
1 Jorund Buen Partner/Director, Point Carbon UNFCCC Technical Workshop on Joint Implementation 10 March 2006 Early mover JI projects.
Seite Hier steht ein thematisches Foto Demand side perspective on JI UNFCCC Side event on Joint Implementation Gertraud Wollansky Federal Ministry.
Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January Samir Amous, APEX, Tunisia Regional Centre for.
Canada’s CDM & JI Office First UNFCCC Workshop on the Implementation of Article 6 Projects Under the Kyoto Protocol May , 2004 Moscow, Russia Canadian.
Morten Pedersen Deputy Programme Director Danish Environmental Protection Agency Climate Change Division.
Update on the CDM May 2004 UNFCCC/Cooperative Mechanisms CDM team.
CDM: ISSUES FOR CMP 2 AND THEIR IMPLICATIONS TO LDCS Presentation made to the LDC Negotiators Workshop, Nairobi, 3 November, 2006 Richard Muyungi United.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
JI Project Cycle Status and observations Morten Prehn Sorensen FIRST SDM JOINT COORDINATION WORKSHOP Maritim Hotel Bonn, Germany March 2012.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
UNFCCC Technical Workshop on Joint Implementation Bonn, 13 February, 2007 Session 2: Parties Involved in JI Projects – Panel Experiences and Expectations.
Italian policies and programmes on JI
JISC – work accomplished and challenges ahead
Role of Parties involved in JI-projects: Sweden
Example(s) of JI Track 1 procedures
UNFCCC Technical Workshop on Joint Implementation
DNV experiences and viewpoints
Joint Implementation A Parties and Buyers Perspective
The various tracks of JI…
Theoretical differences between CDM and JI validation/determination
Small-Scale Projects Under JI
Future of JI-2 Some considerations from Russian MEDT
JISC from COP/MOP 1 to COP/MOP 2 UNFCCC Technical Workshop on JI
Carbon Finance at EBRD: IGOs’ perspectives
Development of determination and verification manual (DVM)
Presentation transcript:

Canada’s Experiences & Perspectives on Joint Implementation JI Technical Workshop, Bonn, 9-10 March 2006 Jeanne-Marie Huddleston, Canada’s CDM & JI Office

-2- Overview of Presentation The Role of Canada's CDM & JI Office Canadian experiences Perspectives on JI The Work of the JISC

-3- CDM & JI Office: What We Do Canada’s CDM & JI Office was established to serve as Canada’s DNA and Focal Point and to help Canadian companies by: –Approval of voluntary participation in CDM and project approval in JI projects –Facilitating Canadian participation in CDM and JI –Strengthening relations with host countries –Facilitating development of projects

-4- CDM & JI Office: What We Do DOMESTIC Outreach to Canadian companies to: Inform and provide training to Canadian companies about CDM and JI; Advise market/project opportunities; Provide financial and technical support for project development. INTERNATIONAL Outreach and trade missions to: Build awareness of Canadian capabilities; Provide Capacity-building support to various markets; MOUs to facilitate cooperation with host countries;

-5- Canadian Experiences With respect to JI, the Office has provided: –Financial support for Canadian company projects in Eastern Europe and Russia; –Dedicated funds to project portfolio development (PINs) in Russia –Concluded MOUs with Poland, Ukraine, Latvia; others under discussions with various E. European countries.

-6- Canadian Perspectives on JI Many opportunities available for undertaking JI projects But, some challenges also: –Need to build capacity in many host countries with respect to project assessment and approval; –Later-than-anticipated establishment of JISC, contributing to uncertainty for project developers; –Shorter crediting period available for first commitment period compliance – projects need to get up and running quickly.

-7- The Work of the JISC Challenges and Issues Need for speedy development and elaboration of guidance and documents –e.g. PDD, criteria for baseline setting and monitoring –to remove uncertainty for project developers Should build on lessons-learned from CDM but avoid pitfalls –Need to keep in mind that JI is not identical to CDM in terms of modalities and procedures Dealing with a volume of already advanced projects in the pipeline

-8- The Work of the JISC Issues Role of JISC –Higher level of oversight for JISC (vs. EB) more responsibility delegated to AIEs Parties play a greater role – approving projects –Need to find appropriate balance between oversight role and providing sufficient guidance to AIEs to enable them to carry out their prescribed functions

-9- The Work of the JISC Issues Accreditation –Expertise can be drawn from existing CDM structure where possible –However, JI procedures should include a fast-track for entities already accredited as DOEs Small-scale projects –JISC should define and elaborate categories for SSC projects –Procedures should be streamlined, simple and appropriate

-10- The Work of the JISC Issues Reviews –Need to establish clearly defined and appropriate criteria for reviews –Should be based on adherence to modalities and procedures –Depending on volume of projects, JISC may need to consider forming a sub-group to look at projects

-11- The Work of the JISC Treatment of “early movers” –Important to bear in mind late establishment of JISC and as a result the progress of early movers in somewhat of a policy void Need to provide clear and early guidance to PPs –Also bear in mind that CMP.1 decided relevant parts of CDM-PDD and EB approved methodologies can be applied under JI, as appropriate –Considerations - need to redraft PDDs? Undergo a second verification exercise? Fast-tracking?

-12- Canada’s CDM & JI Office Climate Change Division (GDCC) Department of Foreign Affairs and International Trade 125 Sussex Drive Ottawa, ON K1A 0G2 Tel: +1 (613) Fax: +1 (613) Web: For More Information