Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
FDR 10/01 Jason Tarrant CLRC1 SCT EC Thermal Enclosure (TE) l Thermal Enclosure Function: »Make End-cap thermally neutral »Condensation free exterior »Containment.
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS SCT Barrel PARM. Tyndel 114-May-2003 ATLAS SCT Barrel PAR - Introduction uOver-view of the Barrel SCT Õ Modules Õ LM tapes & optical harnesses Õ.
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
CHE/ME 109 Heat Transfer in Electronics LECTURE 7 – EXAMPLES OF CONDUCTION MODELS.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
JLC CDC The total numbers of wire : The total wire tension : 50 t Material : outer cylinder mm thick CFRP end-plates mm thick aluminum.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Solid Mechanics Course No. ME213. Thin Cylinders (Examples) ME213 Solid Mechanics2 Example 1.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
End-cap Mechanics FDR Overview of the Project
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
ob-fpc: Flexible printed circuits for the alice tracker
DAQ for ATLAS SCT macro-assembly
Mechanics: (Tim).
Vertex Detector Mechanical R&D Design Questions and Issues
Presentation transcript:

Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT

Sils ATLAS Meeting 28-9 October 2003 Barrel SCT Mechanics - Specifications zFour stable cylindrical mechanical in carbon fibre - honeycomb sandwich (external dimensions are 568 / 710 / 854 / 996 mm diameter by 1530 mm length). zStable to <1 ppm/°C CTE in longitudinal and circumferential directions, o –20°C < T < +30°C.  0% < RH < 50% RH at constant temperature, dimensional change in all directions, < 30  m/m.  Under stable conditions (- 10±1°C and 20±1°C in dry N 2 ) changes in all directions, except through sandwich thickness, < 10  m/m/yr (2 point support in middle plane at both ends and 100 N/m 2 uniformly distributed) B3

Sils ATLAS Meeting 38-9 October 2003 Barrel SCT Mechanics - small parts Brackets and small components production. >40000 small pieces, some the same for the 4 barrels, some specific to each barrel type The bracket shells are time consuming to produce and are on the critical path. Laminate by Composite Design, Machining by UNI-GE All components by end October

Sils ATLAS Meeting 48-9 October 2003 Barrel SCT Mechanics - barrel 6 Dirty work on Barrels before shipment to RAL zBarrel 6 still in Geneva because of B3 delays at RAL zCounterdrilling of outer facing underneath pads uDone for B6, B5 and B4, two pads to be re-bonded on B4 zCheck/adjust mountability of brackets on pads, uDone for B6, B5, B4 zSurface preparation for bonding FSI system, uDone for B6, B5, B4

Sils ATLAS Meeting 58-9 October 2003 Barrel SCT Mechanics - barrel 6 Clean Work to be done for B6, B5 and B4 Cleaning cylinder Electrical continuity tests Mount brackets all screws tightened with torque controlled screwdrivers brackets have to be electrically isolated from cylinder Rough geometrical check. Visual inspection B3 -penetrations through thermal enclosure designed - support designed - tooling for support manufacture to do - interlink design to do

Sils ATLAS Meeting 68-9 October 2003 Barrel SCT Mechanics - dry assembly B3 + B6 B4 + B5 + B6

Sils ATLAS Meeting 78-9 October 2003 Barrel SCT Mechanics - assembly at RAL -delays! zOpto-harnesses are in production uBarrel LM tape production complete uBarrel-3 harnesses being evaluated uESD damage to DORIC ASIC & other production issues (cracked lines etc) B3 harness assembly at RAL

Sils ATLAS Meeting 88-9 October 2003 Barrel SCT Mechanics - assembly at RAL -delays! B3 cooling assembly at RAL Thermal enclosure a major problem

Sils ATLAS Meeting 98-9 October 2003 SCT Mechanics - integration of barrels at CERN

Sils ATLAS Meeting October 2003 Barrel SCT Mechanics - preparing SR1 reception Temporary enclosure DAQ system & readout DCS & power supplies Facility control & monitor (CIC) Cooling system Environmental Control & Interlock Detector services Environmental Gas From H. Pernegger