May 17, 2004SSWG - PFIS Shared Risk1 PFIS Commissioning, Shared Risk, and Transition to Operations.

Slides:



Advertisements
Similar presentations
1 AAO AusGO : 29 June 2009 Demystifying the Queue at Gemini Observatory AAO Epping - 29 June 2009 Henry Lee Gemini South, Chile.
Advertisements

1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
User Support Coordination Objectives for Plan Years 4 and 5 (8/1/2008 to 3/1/2010) Sergiu Sanielevici, GIG Area Director for User Support Coordination.
DECam Community Pipeline Review Closeout Presentation DES Council of Directors’ Review August 30-31, 2010 NCSA, Urbana IL.
CSIRO ASKAP Science Data Archive (CASDA) Project Kick-Off IM&T AND CASS Dan Miller| Project Manager 17 July 2014.
PCOS Program Office Mission Studies and Technology Development Jackie Townsend Advanced Concepts and Technology Office PCOS and COR Program Offices
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
SOFIA DCS History and Overview Ian Gatley. SOFIA March DCS Preliminary Design Review2 The South Pole CARA Project: A DCS demonstration A data.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
Telescopes in the world Lison Malo Student CRAQ workshop.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
LBTI HOSTS Science Operations Plan Draft 0 – Feb
SSWG Meeting #15: May 2006, Cape Town SSWG #15: 7 & 8 May SSWG Agenda: Sunday 7 th May 1.Welcome. Minutes of Previous meeting. Matter arising (David)09:00.
Ocean Observatories Initiative OOI CI Release 3 (Scope To Complete) Kick-Off Tim Ampe: System Development Manager Release 3 Kick-off La Jolla, CA October.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Cycle 1 Planning Process B-G Andersson (SOFIA Science Operations Manager) & Ravi Sankrit (User Support Scientist) SSSC, May 11, 2011 Mountain View.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
Short introduction to IDEAS Programme Maria Koutrokoi Hellenic NCP of ICT, IDEAS and Research Infrastructures Programmes Department for Strategy, Planning.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Managing Under a Six-Nation Partnership Gemini Observatory soon to be Five.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
MNRF Management and milestone achievements Chris Evans AAO.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
OWL Concept Design Review Report to ESO Council 8 th Dec 2005.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
GLAST Science Support Center November 17, 2006 GUC Face-to-Face Meeting GLAST GI Program (with revised schedule) David Band, GSSC.
Failure Mode & Effect Analysis FMEA Lecture 11. What is FMEA? Failure mode and effect analysis is an Advanced Quality Planning tool that: examines potential.
The SALT Development Committee Recommendations Regarding New Instruments (Matt Bershady) Rob Fesen Janusz Kaluzny Wolfram Kollatschney Darragh O’Donoghue.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
SALT Board Meeting #19: May 2006 Board Meeting #19: 8-9 May Astronomy Operations Now 3 SOs: Fred, Sandisa, Lucian (Francois resigned), with Charl.
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
Research — The Big Issues Rosamund Sutherland Graduate School of Education University of Bristol
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
Virtual Lab Overview 5/21/2015 xxxxxxxxxx NWS/MDL/CIRA.
LSST CORPORATION Patricia Eliason LSSTC Executive Officer Belgrade, Serbia 2016.
Heliophysics MO&DA Program - November 13, Page 1 Notes from the Heliophysics MO&DA Program STEREO SWG Meeting Chuck Holmes “Director, Heliophysics.
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
Science Operation of Subaru Telescope Tae-Soo Pyo 2014.Feb.25 2/25/ Subaru Winter KASI.
Digital Asset Management & Storage Program Program Summary
Power Delivery Solutions
Project Execution Methodology
CEOS Response to GEOSS Water Strategy
Astronomy 920 Commissioning of the Prime Focus Imaging Spectrograph
JCMT Observation Management Project
ESO Phase 1 & 2 Procedures Gaitee Hussain
IDN Variant TLDs Program Update
School of EE and Computer Science
By Jeff Burklo, Director
Software Requirements
User instrument policy
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
Software Requirements
Microsoft Project Past, Present and Future
Science Operation Report FY2017
Extragalactic Discussion – early science
Observing with Modern Observatories (the data flow)
Observatory Science Operations
After this meeting… Voting period begins
Presentation transcript:

May 17, 2004SSWG - PFIS Shared Risk1 PFIS Commissioning, Shared Risk, and Transition to Operations

May 17, 2004SSWG - PFIS Shared Risk2 Main PFIS Commissioning Steps Setup/ Test on delivery to SAAO Setup/ Test in spectrograph room on delivery to Sutherland Mount on tracker and integrate with telescope Day tests on tracker Night time commissioning Shared risk science as modes commissioned Handover to SALT

May 17, 2004SSWG - PFIS Shared Risk3 Strawman Schedule Assumes: 50% efficiency on 50% of nights

May 17, 2004SSWG - PFIS Shared Risk4 Strawman Time Allocation

May 17, 2004SSWG - PFIS Shared Risk5 How much Time? Assume: –75% usable nights –efficiency 50% Jan – Jun, 75% Jul – Dec '05 Want ~10 shared risk programs, ~ 20 tracks each Programs will need backup targets in case of slips Nights Telescope42 SALTICAM14 PFIS Comm17 PFIS shared risk19 PFIS Observatory 78

May 17, 2004SSWG - PFIS Shared Risk6 Shared Risk Science Priorities Shared risk science tied to specific PFIS modes and is proposed to SALT in advance of commissioning Priorities User commissioned modes Demonstrate Observatory strengths, eg TOO, synoptic Immediately publishable; visible Programs to be executed prioritized by Director in consultation with PFIS PI to meet goals of verifying PFIS capabilities and demonstrating early science from SALT

May 17, 2004SSWG - PFIS Shared Risk7 Shared Risk Science Shared risk science carries responsibility to promptly reduce data and when possible to contribute to development of data reduction and analysis tools for SALT Shared risk users are expected to write up short reports on their experience for posting on the web as background for SALT consortium members Published shared risk data will include commissioning and instrument team members deemed appropriate by the Project Director and PFIS PIs.

May 17, 2004SSWG - PFIS Shared Risk8 Schedule/ Process Pre-Proposal submitted to Telescope Scientist: this Summer? Usable Telescope/ PFIS tools by end of summer? Phase I proposals to be discussed at one-day meeting after next SSWG Phase II proposals due end of year Proposals test for the first time the observatory proposal process -> queue Role of TAC's?