May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.

Slides:



Advertisements
Similar presentations
Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
EQUIPMENT VALIDATION.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 BROOKHAVEN SCIENCE ASSOCIATES The Path to Accelerator Commissioning F. Willeke Accelerator Systems Director NSLS-II PAC Meeting December 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department.
Safety Review for Modifications Calling For Help Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Take 5 for Safety E. Lessard June 2, Conduct of Operations Agreement 2  An updated set of practices for mission success and safe operation of large.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Anders Sunesson RF Group ESS Accelerator Division
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
1 1. Some recent views ( ) 2 Linac tunnel
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
September 19-20, 2007 L. Snydstrup Structural Components WBS 1.1 Structural Components Status DOE Annual Review Lou Snydstrup September 19-20, 2007.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
PIP Status Report Linac Startup plans 12/05/2012.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
September 19-20, 2007 E. Beebe EBIS & LEBT Tests Edward Beebe September 19-20, 2007 DOE Annual Review.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
D. Raparia2005/01/27-28 MAC Review EBIS Injector Linac Optics I I D.Raparia EBIS Review 2005/01/27-28 HEBT Booster Injection.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Maintenance and Efficiency
Shielding Design for LCLS Injector Operation – Phase one
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
Adriana Rossi, Sergey Sadovich
How to run ions in the future?
Extraction Michael Bevins May 17, 2007
(Beam) Commissioning Plan
ThomX – Commissioning Meeting – 25/01/2018
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning

May 4, Outline Pre-commissioning activities Basis of designs Interface with MCR/Operations Training and qualifications for specialists Operating mode for commissioning

May 4, 2010 Pre-commissioning When practical, components were tested before installation –RFQ first operated with helium beam in Test-EBIS –Superconducting Solenoid tested when received –Major components validated in Test-EBIS Large supplies tested after installation,e.g., collector supply Beam tuning and characterization (prior to injection into Booster) is following plan developed by D. Raparia and J. Alessi (Start-up Plan, January 2009)

May 4, 2010 Design of components Test EBIS – operated for ~10 years at BNL; most features and designs were copied from this prototype RFQ, Linac and bunchers – many similar devices operating throughout the world; C-AD has previous experience operating all these type devices Many commercial components (most power supplies). DOE CD-1, CD-2, CD-3 technical review process; EIR, etc.

May 4, 2010 Test EBIS on 100 kV platform

May 4, 2010 Component testing on Test EBIS Electron Collector 100 kV insulator 16-plate deflector The electron gun was operated at its design current of 10A.

May 4, 2010 Overall Schedule Prior to commissioning, sequential beam measurements are being made after each major element is installed: EBIS source, injection line, LEBT,RFQ,MEBT, and LINAC –Measured parameters are compared with calculations After ARR approval, begin commissioning with helium ions, then use gold and iron (commissioning = capture and acceleration of EBIS beam in Booster) If possible, try delivering helium to NSRL in June CD-4 - by end of September (doesn’t require beam injection into Booster) Fall NSRL run - will use EBIS for some ions 2011 RHIC run – EBIS phased in as injector for heavy ions; some time with U beam might be scheduled

May 4, 2010 Prior to commissioning All ARR prestart items complete Critical devices, beam-current monitors and reach-backs for radiation protection are established Emergency procedures are complete (done) Commissioning procedures are complete Fault Study Plan (done) Safety Check-Off List(s) prepared (RSC – D. Beavis; ASSRC – J. Glenn) Safety Review Committee issues closed out Accelerator Safety Envelope is approved (done) Training of commissioning staff is complete

May 4, 2010 Coordination With Operations Commissioning steps for beam in Booster planned with Booster Liaison Physicist (C. Gardner) and MCR Head (P. Ingrassia) Unattended operation of components, such as EBIS superconducting solenoid, monitored by Accelerator Support Group (CAS) which is staffed 24/7 Training on required procedures done by EBIS staff Conduct of Operations Procedures are followed Project Head participates in weekly Accelerator Division meetings

May 4, 2010 Injection into Booster Establish oscilliscope traces of ETB beam pulse, Booster main magnet current, and injection dipole currents. Adjust timing of beam pulse so that it occurs on the injection porch. Adjust Booster magnetic cycle to obtain desired measured field on injection porch. Adjust timing of injection dipoles so that dipole current falls rapidly to zero at end of beam pulse. Establish beam on ETB xfmrs and mws. Adjust ETB dipoles and quads to obtain desired beam positions and widths on the mws. Adjust ETB dipoles and quads, inflector voltage, and Booster injection field to obtain circulating beam in Booster. Setup adiabatic capture and acceleration. See K.L. Zeno’s procedure and notes for details.

May 4, 2010 Training and Qualifications EBIS is operated and commissioned by system specialists Experience required for commissioning was gained from construction and operation of Test EBIS, operation of the H- RFQ and linac, and operation of the Tandems. Radiation safety experience from similar ions and intensities at the Tandem Major Systems (RF, power supplies, vacuum, etc) done by experienced C-AD staff who are responsible for similar systems throughout C-AD Large power supplies and RF systems initially tested at vendor facilities with participation of EBIS system expert

May 4, 2010 Procedures have been developed to protect workers from hazards during an emergency or routine operations. –Some (emergency, Booster injection) are maintained in the C-AD OPM, chapters 3 and 15. –Other procedures have been developed for the system specialists to aid in the operation of equipment and are not in the OPM. These will be put into the OPM as appropriate prior to the transition from commissioning to operations. (Covered in D. Passarello talk)

May 4, 2010 Commissioners Planning and Coordination: J. Alessi Beam Measurements, Parameter Verification: D. Raparia, J. Alessi, E. Beebe, M. Okamura, A. Pikin Booster Injection : C. Gardner Magnets and Structural Components: L. Snydstrup, J. Ritter Power supplies: R. Lambiase, I. Marneris, E. Bajon, R. Lockey Vacuum Systems: L. Smart, M. Mapes Instrumentation: M. Wilinski RF Systems: V. Lo Destro. A. Zaltsman Controls: L. Hoff Support: D. McCafferty, R. Schoepfer. L Vogt

May 4, 2010 Operating mode during commissioning Starting in June, will begin to operate continuously for significant periods of time with coverage by EBIS experts in cooperation with MCR For the NSRL fall run - will use EBIS for some beams, while still in the commissioning mode. Will be able to switch between Tandem and EBIS injection to insure continuity of Operations During FY11, EBIS will be phased in to become the injector of choice for heavy ions – this may include some U beam for RHIC During 2011 will gradually eliminate 24/7 expert shift coverage