1 PROJECT CONTROL & RISK n Purpose of Control n Control Process n Cost/Schedule/Technical Control n Introduction to Earned Value n Project Changes and.

Slides:



Advertisements
Similar presentations
© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.
Advertisements

©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 6 Cost Management Ending the reliance on the budget.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
Dr. L. K. Gaafar The American University in Cairo
Monitoring and Control Earned Value Management (EVM)
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
Chapter 10: Monitoring and Controlling Change
7-1 Risk Management. 7-2 Risk Risk (in general, in finance): deviation, variance The change can be positive or negative Project risk: any possible event.
7-1 Risk Management Chapter 7 © 2007 Pearson Education.
HIT241 - COST MANAGEMENT Introduction
Project Cost Management
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Earned Value Management
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
PRM 702 Project Risk Management Lecture #28
HIT241 - RISK MANAGEMENT Introduction
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
11-1 PROJECT CONTROL Project Control Defined Types of Control Systems Need for Balance in Control Systems Control of Creative Efforts Changes and Change.
Earned Value JOEL VIRAY TOPICS What is Earned Value Management? –Why do I need it? –How do I do it? Earned Value Reporting Earned.
Monitoring and Information Systems
Project Cost Management
7-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Management Chapter 7.
7-1 Risk Management Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
Software Project Management (SPM)
Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 7-1 Risk Management.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
Budgets. Types of budget Organisational goals informed by the strategic plan and the organisations ability to meet its historic targets – Strategic Turnover.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Budgeting the Project 4-1 Budget. 4-2 Homework #17  Overview  Approaches for gather data  Budgeting & Estimating costs  Budget uncertainty and risk.
Project Cost Management
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Introducing Project Management Update December 2011.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Week 2 – Risk Planning & Identification. Risk & Risk Management.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
PROJECT CONTROL Project Control Defined Types of Control Systems
CHAPTER:7 Project Cost Management
Project Communication, Tracking, and Reporting
Project Cost Management
Work Packages / Deliverables Completed
Earned Value - What is it
Recognization and management of RISK in educational projects
Earned Value Analysis It is a continuous comparison between the plan of the project data and the actual data. Budgeted and Committed Cost: Variance = Budgeted.
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
Risk Management Chapter 7
Earned Value Management
ELC 347 project management
Sales forecasting and budgeting
Chapter#8:Project Risk Management Planning
Chapter#8:Project Risk Management Planning
Presentation transcript:

1 PROJECT CONTROL & RISK n Purpose of Control n Control Process n Cost/Schedule/Technical Control n Introduction to Earned Value n Project Changes and Change Control n Importance of Managing Risk

2 Purpose of Control n To make the actual meet the plan n The Process n 1. Key performance areas n 2. Set standards n 3. Measure performance n 4. Compare n 5. Fix

3 A Question of Balance n Too little control? n Too much control? $ Amount of Control C Control C Mistakes

4 What Forms do these “Standards” Take? n Cost n Schedule n Performance

5 A Control Example n You’re two months into a three month project. You’ve spent 90% of your budget. Defend yourself.

6 Three Important Terms n BCWS: The plan, integrating schedule and budget n BCWP: What you planned to spend for work actually done n ACWP: Actual dollars spent at a point in time, for the work actually done

7 More Terms n BAC: Original budget at completion n TAC: Original time at completion n ECAC: Estimated cost at completion n ETAC: Estimated time at completion

8 Four Relationships n Cost Variance = BCWP - ACWP n Schedule Variance = BCWP - BCWS n ECAC = ACWP X BAC BCWP n ETAC = BCWS X TAC BCWP

9 Changes and Change Control n The last step of the control process: FIX n Two Types: Business and Technical Changes

10 Business Changes (aka CCPs) n Business related n Driven by such things as: n Spec relief n Deliverables changes n Funding shifts n Schedule changes n Acts of God n Subcontractor changes

11 Technical Changes (aka ECPs) n Technological issues, such as: n New technologies n Laws of physics n Competitor response n Threat changes n Changes in user requirements (real or political)

12 Change Control n Changes cost $, usually big $ n So they need control n PM responsibility n Signed baselines n High levels of authority n Some tools: n Zero sum/DTC/caps

13 PROJECT RISK MANAGEMENT n Risk defined n A brief history n Types of project risk n The PMBOK sequence n Tools

14 RISK DEFINED n The likelihood (probability) and the impact of an undesirable event “Fear of harm ought to be proportional not only to the gravity of the harm, but also to the probability of the event.” (Antoine Arnauld, 1665) n Both matter n Examples

15 A BRIEF HISTORY n The management of risk forms the boundary between the old world and modern times n Old world n Fates and gods n Short time horizons n Man’s role: accept, maybe react

16 SO WHAT CHANGED? n Rise of rational man n Man can plan and influence the future n Development of math, probability, forecasting n Multiply XII times VIII n Rise of zero and Arabic numerals n Rise of trade, business, shipping n Longer time horizons n Large commercial ventures mean more at stake

17 THE CRITICAL QUESTIONS n To what extent does the past foretell the future? n Can we extrapolate from the past to predict a future event? “Nature has established patterns originating in the return of events, but only for the most part.” (von Leibnitz to Bernoulli, who then developed the Law of Large Numbers, 1703)

18 TYPES OF PROJECT RISK People Time Political Financial Technical A Question: Is “Risk Reduction” really possible?

19 THE PMBOK RISK MANAGEMENT SEQUENCE n Risk identification n Risk quantification n Risk response development n Risk response control

20 TOOLS FOR RISK MANAGEMENT (more or less in order) n Expert opinion n Simulation n Historical Analysis/ “Lessons Learned” n “Risk Reduction” n Contracting/Procurement Strategy n CPFF, FFP, “Make or Buy,” Sole Source, etc. n Insurance, bonding n Multiple paths n Management attention (e.g., “Top 10” Lists) n Workarounds