NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team) 256-544-2419.

Slides:



Advertisements
Similar presentations
Effective Contract Management Planning
Advertisements

USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
1 NDIA Earned Value Management Application Guide Status Report May 3, 2005.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
U.S. Department of Agriculture eGovernment Program February 2004 eAuthentication Integration Status eGovernment Program.
James Webb Space Telescope Update Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Federal Transit Administration Office of Safety and Security FTA BUS SAFETY & SECURITY PROGRAM 18 th NATIONAL CONFERENCE ON RURAL PUBLIC AND INTERCITY.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
IS&T Project Management: Project Management 101 June, 2006.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
The Technical Community Understanding the Procurement Cycle LaShawn Davis Professional Intern Program Level II Presentation.
Release & Deployment ITIL Version 3
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Integrated Capability Maturity Model (CMMI)
Copyright Course Technology 1999
Chapter 4 Interpreting the CMM. Group (3) Fahmi Alkhalifi Pam Page Pardha Mugunda.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Office of Management and Budget Program Management Systems Committee February 8, 2005 EVMS Actions in Process David Muzio.
1 NASA Earned Value Management Update August 2006.
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
1 Cost Benefit EVM at DOT Presented to: Joint Industry – Government NDIA PMSC session Presented by: H. Giovanni Carnaroli Associate CIO, IT Policy Oversight.
Presented to: NDIA PMSC By: Keith A. Kratzert Date: August 17, 2005 Federal Aviation Administration EVM at the FAA.
Mandatory Technical Standards Engineering Management Board Goddard Space Flight Center July 10, 2003 Updated October 7, 2003 HQ/Code AE R. Weinstein.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
Presidential Memorandum on Managing Government Records Paul Wester Chief Records Officer for the U.S. Government National Archives and Records Administration.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
Building Capability.  In order to successfully operate an architecture function within an enterprise, it is necessary to put in place appropriate organization.
1 JSC Welcome to Systems Engineer Workshop To the optimist, the glass is half full. To the pessimist, the glass is half empty. To the engineer, the glass.
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Planning, Budgeting and Accounting (PBAT) Team (Agency Team) Simplifying the Planning & Executing of Resources (SimPlER) Team (LaRC Team) Kathy Ferrare.
Georgia Institute of Technology CS 4320 Fall 2003.
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
ENGINEERING LESSONS LEARNED AND SYSTEMS ENGINEERING APPLICATIONS Paul S. Gill and Danny Garcia, NASA Technical Standards Program Office William W. Vaughan,
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
Office of Management and Budget NDIA Program Management Systems Committee May 3, 2005 EVMS Compliance Requirements David Muzio.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
Constellation Space Transportation Planning Office July 30, 2009.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
HHS CEA Executive Briefing HHS Enterprise Performance Life Cycle (EPLC) and Program/Project Manager (PM) Certification NIH PM Forum September 12, 2007.
EVM UPDATE JANUARY 31/FEBRUARY 2, EVM REQUIREMENTS NASA PROCEDURAL REQUIREMENTS (NPR) D - NASA SPACE FLIGHT PROGRAM AND PROJECT MANAGEMENT.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
July 2003 At A Glance The GMSEC provides efficient and enabling GSFC mission services and products for the next decade. Benefits Establishes a Single Strategic.
Office of Major Project Development (OMPD) Overview November 2015.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 6 : Towards the Implementation of Quality.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
NDIA PMSC Baseline Stability Working Group February 2010 Neil Albert Pete Wynne.
6/7/05 Partner Scientist PI privileges within the GSFC Sciences and Exploration Directorate (SED) Scientists working with SED under cooperative agreements.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
The Systems Engineering Context
Earned Value Management
NASA Independent Reviews -Lessons Learned-
Digital Government Initiative Initiation Department of Information Technology Estevan Lujan, Acting Cabinet Secretary Susan Pentecost, Managing Director,
Enterprise Cybersecurity Initiative Department of Information Technology Vince Martinez, State CIO, Executive Sponsor Lorenzo Ornelas, Managing Director.
Presentation transcript:

NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)

1 Topics 1. Policy and Requirements Update 3. EVM Guideline Gap Status 4. Review Status 2. NASA EVM Capability Development Status

2 Currently updating NASA’s Program/Project Management Requirements for Flight Projects, NPR version E - (3 rd Qtr CY2010)   Incorporates probabilistic confidence assessment requirements for both cost and schedule (likely requirement for resource loaded schedules)   Updates and clarifies “baseline” definition and associated requirements o o Commitment Baseline (external customers) o o Management Baseline (internal project management )   Provide additional guidance and clarity to EVM requirements o o EVM principles vs. guideline applicability for NASA in-house effort o o IBR requirement for NASA in-house project implementations o o Ensure consistency between new “Management Baseline” definition and PMB   Potential tailoring of technical and programmatic requirements for lower category projects Policy and Requirements Update

3 NASA EVM Capability Development Status Background:   July 2009, NASA’s Office of Chief Engineer authorized the start of development activities for an in-house EVM capability for the Agency that satisfies ANSI/EIA-748 Guidelines   Responsibility for EVM Capability Development assigned to Marshall Space Flight Center (Huntsville, AL)   Initial development funding authorized for Formulation Phase only

4 NASA EVM Capability Development Status Current Status:   Established a strong implementation team made up of both contractors and civil servants and with substantial EVM experience   Secured Agency executive leadership support   Communicated with Agency Directorate Leadership the requirements, purpose, issues, and benefits of EVM   Received authorization and funding from HQ’s to proceed into Implementation phase of EVM Capability Development (1/26/2010)

5 NASA EVM Capability Development Status Current Status (cont’d):   Completed a draft Memorandum of Agreement (MOU) to be signed by key stakeholders (OCFO, OCE, CIO, SMD, ESMD, Centers) to ensure that all parties understand and will proactively support EVM Capability implementation   Carried out a thorough requirements analysis to ensure that the correct requirements are identified and understood   Assessed existing NASA systems, processes, and procedures to identify gaps where ANSI-748 EVM guidelines are not being adequately met. Currently working with the Agency’s business systems community & associated working group partners to identify temporary and permanent solutions for gaps

6 Current Status (cont’d):   Completed a NASA EVM Capability Storyboard that depicts the nine EVM process areas with associated narrative descriptions and artifacts for Organization, Work/Budget Authorization, Scheduling, Accounting, Indirect Cost Mgmt, Managerial Analysis, Subcontract Mgmt, Material Mgmt, and Change Mgmt   Currently utilizing the Storyboard process information to develop one EVM System Description for the Agency (each NASA Center will develop and put in place the necessary procedures and tools that will ensure adherence to the Agency’s system description) NASA EVM Capability Development Status

7 Current Status (cont’d):   Completed Agency-level Handbooks for PP&C functional areas   Schedule Management Handbook (At HQ for sign-off & issuance)   WBS Handbook (At HQ for sign-off & issuance)   IBR Handbook (At HQ for sign-off & issuance)   Control Account Manager (CAM) Handbook (Draft complete)   Initiated the development of a comprehensive set of NASA training materials that are consistent with the processes being prescribed in the Agency EVM System Description   Selected two pilot projects for test and validation of the NASA EVM Capability (processes, procedures, and tools)   Extra Vehicular Activity (EVA) Project at JSC – Exploration Sys Missions Directorate (ESMD)   Ice, Cloud, and land Elevation Satellite II (ICE SatII) Project at GSFC – Science Missions Directorate (SMD)

8 NASA EVM Capability Implementation Schedule

9 ANSI-748 EVM Guideline Gap Status   ANSI-748 Guideline gap analysis completed   Identified gaps were prioritized and presented to HQ management   Temporary and permanent solutions are being worked by appropriate Business, IT, and Programmatic organizations   Gaps identified were typically due to practices and/or procedures that have evolved over years within NASA’s management culture and not system problems

10 IBR’s Completed: Ares Flight & Integrated Test Office (FITO) Element In House IBR – 9/1/09 Ares Upper Stage Prime (Boeing) Pre-Negotiated IBR – 9/24/09 Ares Vehicle Integration (VI) Element In House IBR – 11/6/09 Ares Upper Stage In House IBR – 1/28/10 Orion Prime (LMC) IBR – 1/29/10 Upcoming IBR’s: Orion In-House IBR – 2/11/10 Constellation Program Integration In-House IBR – 2/17/10 Orion Complete Project IBR – 2/26/10 EVA Prime IBR – 2/22/10 EVA Complete Project IBR – 4/26/10 Ground Ops Complete Project IBR – 5/11/10 Ares Upper Stage Engine Prime (PWR) IBR – 6/30/10 Review Status