Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.

Slides:



Advertisements
Similar presentations
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Advertisements

Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The ILC Global Design Effort Barry Barish EPP2010 Cornell University 2-Aug-05.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
US ILC Review by DOE/NSF Apr. 4-6 at Fermilab Consultant reviewers: Ilan Ben-Zvi (BNL/ATF &RHIC) Dixon Bogert (FNAL/NUMI) Isidoro Campisi (ORNL/SNS) Tom.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
ILC Global Design Effort
Barry Barish GDE Caltech
Nick Walker (DESY) EU GDE Meeting Oxford
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path to the RDR The EGDE & summary

Brian Foster - Cosener's Forum May 06 2 Status of the ILC In August 2004, group of “Wise Men”, chaired by B. Barish, chose the “cold”, superconducting, RF technology over the competing “warm” X-band RF. Despite the fact that both US and Asian research had been in warm technology, both regions accepted the decision and united behind cold technology; now, transition is complete. ICFA moved ahead quickly to appoint a Global Design Effort (GDE) to transform the technology decision into a full Technical Design Report, capable of being presented to world governments for a decision to construct. B. Barish appointed as GDE director, with three regional directors: BF (Europe), F. Takasaki (Asia), G. Dugan (Americas) M. Nozaki

Brian Foster - Cosener's Forum May 06 3 Status of the ILC At end of April, EPP2010 panel produced its report. This concluded that it was very important that the US regained its leading position in particle physics, under clear threat with the closure of all US domestic pp accelerators by end of the decade. It gave a ringing endorsement for the ILC strategy, requested increased US investment in the R&D for both machine and detector and gave strong support for the US bidding to host the machine. The CERN Strategy group met last week in Zeuthen. Although its conclusions remain confidential, I believe that the current draft document to be submitted to the special CERN Council Session in July contains a strong endorsement of the ILC and a recommendation that Europe, and CERN, are strongly involved in it through the GDE.

Brian Foster - Cosener's Forum May 06 4 GDE mission Currently GDE is 64 strong : Americas - 22; Asia - 18; Europe - 24; corresponding to ~ 30 FTEs. Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.)

Brian Foster - Cosener's Forum May 06 5 ILC Parameters E cm adjustable from 200 – 500 GeV Luminosity ∫ Ldt = 500 fb -1 in 4 years Ability to scan between 200 and 500 GeV Energy stability and precision below 0.1% Electron polarization of at least 80% The machine must be upgradeable to 1 TeV

Brian Foster - Cosener's Forum May 06 6 BCD overview Baseline Design completed in December 2005 overseen by Executive: Directors + T. Raubenheimer, N. Walker, K. Yokoya.

Brian Foster - Cosener's Forum May 06 7 Energy Upgrade

Brian Foster - Cosener's Forum May 06 8 MAC report Generally they were very positive and impressed by the scale of the progress that has been made. They had concerns about the current accelerating gradient spec. and how R&D could be done to achieve it, about communications with the experimenters and also about coordination of world-wide R&D. The first meeting of the Machine Advisory Committee, which reports to ILCSC, took place last month in Fermilab & examined the BCD.

Brian Foster - Cosener's Forum May 06 9 BCD & AC cavities What knobs do we have to turn? Relative Cost Gradient MV/m C. Adolphsen (SLAC)

Brian Foster - Cosener's Forum May Cavity performance Somewhat inconsistent

Brian Foster - Cosener's Forum May ILC Cryomodule Increase diameter beyond X-FEL Increase diameter beyond X-FEL Review 2-phase pipe size and effect of slope

Brian Foster - Cosener's Forum May Klystron Fabrication Several suppliers for BCD: But none meet performance requirements - may need to go to 5 MW.

Brian Foster - Cosener's Forum May Test facilities TTF exists at DESY, SMTF (FNAL), STF (KEK): Stimulate SC industry in the regions - collaborate on SC technology

Brian Foster - Cosener's Forum May Next steps for GDE BCD is “complete”. In the next phase, RDR will take forward the BCD, refine the design and in particular gather industrialisation data in order to form the basis for reliable cost estimate with the RDR. There are 3 new boards: Change Control Board; Global R&D Board; Design & Cost Board.

Brian Foster - Cosener's Forum May Next steps ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE Change Control Board GDE Design Cost Board GDE R & D Board MAC

Brian Foster - Cosener's Forum May Change control The board has overseen the consolidation of the baseline design and the production of a Word document containing all information. Dealing with requests for changes to baseline as further work and R&D is completed. Careful methodology developed - categorise the importance of the change, assign number of board members to review it depending on importance. During process, all GDE members can comment on proposed change. Dealing with ~ 1 request/week.

Brian Foster - Cosener's Forum May Other boards Design & cost board produced a (very) detailed programme of work to lead us towards the most important RDR deliverable - a believable, robust and affordable costing; a preliminary, non-public version will be available by the summer Vancouver meeting. R&D board has to try to impose a structure and discipline on inherently chaotic system - R&D - eliminating wasteful duplication while preserving & enhancing necessary duplication.

Brian Foster - Cosener's Forum May R&D board

Brian Foster - Cosener's Forum May R&D board

Brian Foster - Cosener's Forum May R&D board

Brian Foster - Cosener's Forum May R&D issues

Brian Foster - Cosener's Forum May Next steps for GDE The RDR will be produced using a matrix structure of “area systems” and “technical systems” to account for the project structure.

Brian Foster - Cosener's Forum May Next steps for GDE The WBS

Brian Foster - Cosener's Forum May Next steps The meetings are going well and detailed progress is being made. The day-to-day work of constructing the RDR is supervised by an RDR board chaired by N. Walker (DESY) which meets every week by telephone and reports to the ILC Executive Committee.

Brian Foster - Cosener's Forum May European GDE European GDE meets about every 6 months. Discusses obviously regional issues: - how to get more resources from inside Europe, in particular the EU; - regional outreach - Europe has particular difficulties & challenges here. The European GDE does NOT discuss the technical issues of the BCD or take up European positions on them - these are matters for the full GDE.

Brian Foster - Cosener's Forum May European GDE European Outreach group re-established at Orsay meeting in January. B. Warmbein joined the team recently as PA to EGDE director, based at DESY. Meeting held in DESY just before Easter. EGDE director’s advisory group also meets regularly.

Brian Foster - Cosener's Forum May European GDE Yesterday evening we had an EGDE meeting in DESY to discuss the shape of the EU FP7 proposal. We heard about European cryogenic RF development centre to be cited at CERN, about possible continuation of some current FP6 activities, the use of HERA as a prototype damping ring, etc. ELAN/EuroTeV Meeting at Orsay next Mon-Weds will also discuss these ideas. Goal to have an action plan & outline strategy in next few weeks.

GDE Plan & Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Bids to Host; Site Selection; International Mgmt LHC Physics; CLIC

Brian Foster - Cosener's Forum May Next steps Jan JulyDec Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost RDR Document Design and CostingPreliminary RDR Released Frascati Vancouver Valencia

Brian Foster - Cosener's Forum May Summary The ILC is making excellent progress and the GDE is well established. Producing the RDR & the cost estimate by the end of the year is going to be very tough - we need all the help & expertise that we can get. This is a very exciting and challenging enterprise that is vital for the future of world particle physics.