College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.

Slides:



Advertisements
Similar presentations
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Advertisements

Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
EVALUATION OF CONSULTANT PERFORMANCE CEM 520 Ahmed S. Agha Abdulrahman A. Al-Hussain Professor Saadi Assaf January 2007.
Continuous Value Enhancement Process
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
CHAPTER 2 THE RESEARCH PROCESS. 1. Selection of topic  2. Reviewing the literature  3. Development of theoretical and conceptual frameworks  4.
MethodAssess System Assessment. Methoda Computers Ltd 2 List of Subjects 1. Introduction 2. Actions and deliverables 3. Lessons and decisions.
A STUDY REPORT ON RANDOMIZED ASSESSMENT OF PHARMACY EDUCATION IN SOUTHERN INDIA S. Ravichandran, P.S.G. College of Pharmacy, Peelamedu, Coimbatore, Tamilnadu,
Overhead Costs in Building Construction in Saudi Arabia Mohammad Al-Shahri Ahmed Al-Ojairi.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Expert Report By Prof. Rayko Genchev Raykov, Ph.D. On the research of experts’ views on the problems considered in the project “New Approach in Technology.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.
Organizational Design, Diagnosis, and Development Session 11 Organizational Diagnosis, I.
12-ICIT: Organizational Excellence Journey: Critical Success Factors of Engineering Firms in Saudi Arabia and United Arab Emirates Dr Hesham Magd,
Team Composition and Team Role Allocation in Agile Project Teams Brian Turrel 30 March 2015.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
State Transportation Agency Design-Build Projects Pre-Construction Process Presented By Iqbal Ahmed P.E Friday May 7, 2004.
1 Lecture 6 The Systems Analyst (Role and activities) Systems Analysis & Design Academic Year 2008/9.
Abdallah M. Al-Mahasheer
The Agile vs. Waterfall Methodologies Systems Development:  the activity of creating new or modifying / enhancing existing business systems.  Objectives.
Articulating a Program of Study to the Oregon Registry Oregon Center for Career Development in Childhood Care and Education Portland State University pdx.edu/occd.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
1 CONTRACTORS QUALITY SYSTEMS ASSESSMENT TO ISO 9000 By: Tawfiq Al-Atiq December 1996 Presented to: Dr. Sadi Assaf & CEM-520 Class Presented by: Eid S.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
Factors affecting contractors’ risk attitudes in construction projects: Case study from China 박병권.
THE APPLICATION OF VALUE ENGINEERING ON PUBLIC CONSTRUCTION PROJECTS IN SAUDI ARABIA BY: Mohammad Ali Husain Al-Sughaiyer Supervised By: Dr. Saadi Assaf.
CEM 520: Construction Contracting and Administration 03 June 2007
Systems Analysis and Design: The Big Picture
LOGO Internal Quality Assurance Model: Evidence from Vietnamese Higher Education Tang Thi Thuy, Department of International and Comparative Education,
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Lecture 8A Designing and Conducting Formative Evaluations English Study Program FKIP _ UNSRI
TOPIC-9- PROJECT ORGANIZATION
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
SacProNet An Overview of Project Management Techniques.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
Divisional Managers Commitment to the Diagnostic and Unit Rate Study Consultancy Services for Monitoring of Contractors/Consultants Performance And Establishment.
EVALUATION OF HRD PROGRAMS Jayendra Rimal. The Purpose of HRD Evaluation HRD Evaluation – the systematic collection of descriptive and judgmental information.
Training and Development Prof R K Singh AIMA CME.
1 Quality in Construction; cidb Mandate & Focus February 2014.
The Research Process.  There are 8 stages to the research process.  Each stage is important, but some hold more significance than others.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
CII RT204 THEOWNERSROLETHEOWNERSROLE RT 204 The Owner’s Role in Project Success 2005 Jim Vicknair – WorleyParsons.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Introduction to Research for Physical Therapy Students.
CII Best Practices The Saudi Aramco Experience Musaad Al-Said Saudi Aramco October 6, 2010 © Copyright 2010, Saudi Aramco. All Rights Reserved. CII-KFUPM.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS BY Gulam Farooq DEC 1997 Presented by: Hezam Al-Qahtani QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS.
Instructional Design Course Evaluation Phase. Agenda The Evaluation Process Expert Review Small Group Review The Pilot Feedback and Revision Evaluation.
1. 2 Issues in the Design and Testing of Business Survey Questionnaires: Diane K. Willimack U.S. Census Bureau Economic Census The International.
AUTHOR: NADIRAN TANYELI PRESENTER: SAMANTHA INSTRUCTOR: KATE CHEN DATE: MARCH 10, 2010 The Efficiency of Online English Language Instruction on Students’
School practice Dragica Trivic. FINDINGS AND RECOMMENDATIONS FROM TEMPUS MASTS CONFERENCE in Novi Sad Practice should be seen as an integral part of the.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
3 Chapter Needs Assessment.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
Under supervision of: Eng. Reema Nassar
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Module 5 The Climate Expert and your role as a consultant
Build operate and transfer project delivery System in Saudi Arabia
‘ Causes of Delay During Construction Phase at Palestine ’
Presentation transcript:

College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province of Saudi Arabia By Fawzi Al-Yousif, 2002 Presented by: Abdulaziz Al-Zahrani Abdulaziz Al-Zahrani

Introduction Constructability –Definition & concept –Why Constructability is needed Research Methodology –Research Objectives –Research Process Barriers The Questionnaire Conclusions & Recommendations OUTLINE

Construction in KSA and the 1970s revolution Growth and human lives & financial loss Constructability or buildability awareness –Overall project plan –Designing –Cost estimates –Construction method –Scheduling Introduction

“ Optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives” CII 1986 Definition

In the past, the so called ”master builder professional” used to manage all the knowledge required to plan, design, and construct a project. It’s not possible to do the same now days due to complexity, variety of material, regulation, standards, and codes. each area needs a professional to be specialized” “ each area needs a professional to be specialized” The Need for Constructability

Objectives –Determine current implementation practices in East KSA –Assess the existence of common barriers to constructability implementation Research Process –Literature review ــ Research method plan –Implementation of plan ــ Data Mgt & Analysis Research Methodology

Literature review: Understanding the term “constructability” is required before conducting the research, and this requires a review of major literature associated with the field, in other word, to become more familiar with the subject by studying and closely observing the previous studies conducted in this field. Research Plan: After the review of literature, detailed plan of the research method was drafted, and it was decided to use a survey for collecting the required data. Constructability has almost the same fundamentals as VE “Constructability has almost the same fundamentals as VE” Design Contracting Time High Low Ability to influence cost Construction O&M Research continue

Implementation of plan: During this time the questionnaire was designed, sent to many personnel for participation, and feedback was received from participants Data Management and analysis: The final stage, as the heading signifies, involves managing of received data, studying and analyzing various related issue. Constructability Job Plan has to lead the process of the research” “ Constructability Job Plan has to lead the process of the research” Research continue

Most significant barriers: –Design without construction input is the traditional of contracting –Owners do not care about constructability in contracting strategy –Owners do not choose constructability in their projects. Least mentioned barrier: – There are no proven benefits of constructability Barriers

Barriers

The quoted “modified”questionnaire has helped the researcher to avoid face to face interview with participants, not to mention it helped to avoid, Fixing meetings,Traveling long distance, Participants disturbance and rejection…. Atc. Questionnaires circulated to General Contractors 92 “only 42 replied” Questionnaire 3 main Divisions To obtain: A.Information and characteristics of the organization B.Constructability definition and awareness for assessment C.Constructability implementation Evaluation Questionnaire

Constructability definition and awareness for assessment

Implementation of Constructability evaluation

Conclusion The term “constructability” is very well known to the general contractors in this part of Saudi Arabia. Saudi Aramco has participated in this level of awareness as they request the constructability as qualification process. General contractors are commonly participating during the pre-construction phase of the project by inserting their construction knowledge Conclusion & Recommendation Continue

Most of the general contractors think that constructability should be implemented in all projects regardless of the project size, type or complexity. Specifications problem & unrealistic schedules are most significant difficulties encountered by the general contractors under the traditional method of contracting. Conclusion & Recommendation Continue

Recommendations: General Contractor should practice constructability and educated their clients General contractor, owner, and designer should form an association of constructability As part of promoting constructability programs, owners should insist on involving to general contractor in the project different phases Conclusion & Recommendation Continue

Constructability should be implemented in all projects regardless of their size or complexity Constructability should be included as another specialty during the pre-construction phase. Construction engineering and construction management colleges need to add constructability to their curriculum. Conclusion & Recommendation Continue

Any Question Thank you!