1 NEI 04-02 Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI 04-02.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting
Cost Case Studies of Selected NRC Regulatory Requirements September 19 th, 2013.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
1 Expertly Engineering Safety From Fire NFPA 25 As A Means to Improve Sprinkler System Reliability William E. Koffel, P.E., FSFPE President Koffel Associates,
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
1.6 FIRE MODELING IN SUPPORT OF FIRE PRA An Educational Program to Improve the Level of Teaching Risk-Informed, Performance- based Fire Protection Engineering.
Sixth Edition 1 M a n a g e m e n t I n f o r m a t i o n S y s t e m s M a n a g I n g I n f o r m a t i o n T e c h n o l o g y i n t h e E – B u s i.
NFPA-805 Duke Power Transition – Lessons Learned
Cumulative Impacts James Slider November 7, 2013.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Eleventh Edition 1 Introduction to Information Systems Essentials for the Internetworked E-Business Enterprise Irwin/McGraw-Hill Copyright © 2002, The.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Safety Initiatives Facing Today’s Business January 29, 2013.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
FIRE PROTECTION TOPICS OF INTEREST Defense Nuclear Facilities Safety Board.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
 CS 5380 Software Engineering Chapter 8 Testing.
Safety Program Development and Management 10-1 Chapter 10.
Software Engineering Management Lecture 1 The Software Process.
The Expectation Triad Healthcare Engineering Consultants Regulatory Compliance: “Ensuring that all of the required standards are being met”
Groundwater Protection Initiative And Other Issues Of Interest George Oliver RETS/REMP Conference Charlotte, NC June 23, 2008.
Fire Protection System Deactivation Process April 2007 Rich Kobelski Hanford Fire Marshal 1.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
1 PRA Research to Enhance Decision-Making John Monninger, Deputy Director Division of Risk Analysis Office of Nuclear Regulatory Research, NRC.
United States Nuclear Regulatory Commission Perspectives on Technical Support Organizations IAEA Meeting on TSO Challenges Aix-en-Provence, France April.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
Proposed Topics for Application of Sediment Quality Objectives.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Standard Design Process Overview
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
1 Presented by David Thompson, TIA December 14, 2005 NFPA 1600 and Emergency Communications.
NFPA 805 AND CONFIGURATION MANAGEMENT JIM LECHNER JUNE 7, 2016.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
EPRI Update Procurement and Supply Chain
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Workshop 2: An Introduction and Further Explanation on Design Extension.
Defense-in-Depth and Mitigative Measures
Industry Guidance on Part 21 Evaluation and Reporting
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
DOE Approach to Authority Having Jurisdiction (AHJ) in Safety Standards Office of Worker Safety and Health Policy (AU-11)
Complementarity of deterministic and probabilistic approaches
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Controlling Project Cost and Schedule
TRTR Briefing September 2013
Pressurized Water Reactor Owners Group
License Amendments Patrick Boyle Nuclear Engineer
Mikael Olsson Control Engineer
Presentation transcript:

1 NEI Process Discussion

2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI 04-02

3 Relationship to NFPA 805 A structured Process for transitioning to 10 CFR 50.48(c) Supplemental technical guidance and methods for using NFPA 805

4 Relationship to Regulatory Guide NRC plans to endorse NEI in a Regulatory Guide Draft Regulatory Guide under review

5 NEI Transition Process Fundamental Program and Design Elements Transition Process Nuclear Safety Methodology and Fire Area by Fire Area Transition Processes Change Process during Transition

6 NEI Technical Process Methods for transitioning manual actions Methods for multiple concurrent spurious actuations Change Process Replaces Fire Protection Regulatory Review Process allowed by 10 CFR 50.59

7

8 Fundamental Element Transition Issues Associated with Transition: When is a fire protection system / feature required for Chapter 4 Developing an Alternate Method to allow for the continued use of Engineering Equivalency Evaluations

9

10 Radioactive Release Analysis Review pre-fire plans and training to determine controls for potentially contaminated fire suppression water Revise as necessary

11 Non-Power Operation Transition Review equipment credited for Key Safety Functions during High Risk Evolutions (NUMARC 91-06) Evaluate those components not currently credited or credited in a different manner Determine ‘pinch-points’ Supplement Outage Management Procedures and Processes

12 Nuclear Safety Methodology Transition Comparison to Methods of NEI High Low Pressure Interface Definition A couple of Key Processes Manual Actions  Always Requires a Feasibility Evaluation  Screening Process to address Reliability Issues  Input from Fire PRA Fire Induced Circuit Failures

13 Nuclear Safety – Fire Area Transition

14 Change Process Mirrors the NEI Key points Risk Review of all Changes Risk Screening Provided Examples reviewed at each pilot meeting Examples will be added to NEI 04-02