International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly.

Slides:



Advertisements
Similar presentations
ICAO Safety Oversight Audit and Safety Oversight Status in Nepal
Advertisements

ICAO AVIATION SAFETY PROGRAMMES
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt.
System of Systems (DRAFT) To be approved by the ICAO Council
What is ICAO Why Should You Care ?
ICAO Aviation System Block Upgrade Executive Briefing:
International Civil Aviation Organization Roles of RSOO in the management of safety information Marcus Costa C/AIG, ANB 28 Oct 2011.
International Civil Aviation Organization Nancy Graham Director - Air Navigation Bureau 28 October 2011 Symposium on RSOOs Meeting Outcomes.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
ICAO: Global Harmonization Plan
High Level Overview of ICAO Responsibilities
Information Management The ICAO Perspective
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Hands-on Exercises Performance Based Planning and use of IFSET SIP/ASBU/Bangkok/2012-WP/32B Workshop on preparations.
ICAO Provisions for Safety Management
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
APAC PBN Seminar F.LECAT (ICAO)
International Civil Aviation Organization FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
International Coordinating Council of Aerospace Industries Associations International Coordinating Council of Aerospace Industries Associations (ICCAIA)
Evgeny A. Gorbunov, General Director, Union of Aviation Industrialists
Introduction to PBN Seminar ICAO PBN Implementation 1.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
SIP/2012/ASBU/Nairobi-WP/6
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Page 1 A brief on MIDANPIRG Hamad Alaoufi (Chair MIDANPIRG) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-2 MIDANPIRG.
Harmonizing AOC & Operations Specifications. April 2008ICAO harmonization of the AOC & Ops Specs Outline Historical and current situation – ICAO Problem.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
U.S./Europe International Aviation Safety Conference By: James Ballough, FAA, and Claude Probst, EASA Date: June 4, 2008 “Global Safety Management: Revolution.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Requirements - background
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
International Civil Aviation Organization Global Runway Safety Symposium ICAO’s Harmonization Initiatives John Illson Air Navigation Bureau 25 May 2011.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
APAC PBN Seminar F.LECAT (ICAO)
AMHS/SWIM SEMINAR/WORKSHOP
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
System of Systems (DRAFT) To be approved by the ICAO Council
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
RADIO SPECTRUM MANAGEMENT
Workshop on preparations for ANConf/12 − ASBU methodology
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
ANConf/12 – Agenda H. Sudarshan
Basics of RNP.
Workshop on preparations for ANConf/12 − ASBU methodology
Session – 4: Existing ICAO Standards relating to Air Traffic Control
ANConf/12 – Agenda H. Sudarshan
ICAO Air Navigation Bureau
Regional Director, Eastern & Southern African Office, ICAO
Balanced Approach to Noise Mitigation
ICAO SAFETY INITIATIVES Certification of Aerodromes
Balanced Approach to Noise Mitigation
Dave Behrens Director, Infrastructure Strategy IATA
Presentation transcript:

International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly

2 Annex 11, Chapter 2.6 – Classification of airspaces Class A to G Service provided and flight requirements Well known! Para : “States shall select those airspaces classes appropriate to their needs” So….what do you do?

3 What’s in the future SESAR – NEXGEN – the rest of the world? Need for global harmonization ICAO – Block Upgrades

4 Aviation System Block Upgrades Clearly defined, measurable operational improvement; – Airborne and ground procedures necessary to make it happen; as well as new separation minimums – if applicable; – Equipment and/or systems needed in the aircraft and on the ground, with appropriate training; – Operational approval or certification plan; and – Positive business case over a clearly defined time period. Well understood by a Global Demonstration Trial All synchronized to allow initial implementation Won’t matter when or where implemented

Block 0 (2013) Block 2 (2023) Block 1 (2018) Block 3 (2028 & >) Optimum Capacity and Flexible Flights Globally Interoperable Systems and Data Efficient Flight Plan Greener Airports Performance Improvement Areas

6 Access and Equity Built in principle Improve access: – Ensure that shared use of airspace and airports by different classes of airspace users will be significantly improved (classes defined by type of user, type of aircraft, type of flight rule); and – where shared use is conflicting with other performance expectations (safety, security, capacity, etc.), ensure that viable airspace/airport alternatives will be provided to satisfy the airspace users’ needs, in consultation with all affected stakeholder. Improve equity: – For priority management, ensure that more options will be available than just the ‘first come first serve’ rule; – Ensure that priority rules will always be applied in a transparent, correct manner.

7 PBN is the highest priority PBN can enable procedures requiring less airspace due to design flexibility and improved track containment Good design essential to reduce the need for Class B/C airspace Key: ensure that all effected parties are brought together at the beginning of any redesign

International Operations 8

9 Planning and Implementation Regional Groups (PIRGs) Established by the Council Develop, amend and maintain the concerned regional air navigation plans (ANPs) and assist States in their implementation Review air navigation deficiencies and assist States in eliminating those deficiencies

10 ICAO Regions Project title (Insert, Header & Footer)

11Project title (Insert, Header & Footer)

12 Recommendations: Develop a strategy to lobby States for access and equity – this will need to be done on a State-by-State basis Participate in the 12 th Air Navigation Conference Consider observer status in the PIRGs