Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Front Suspension Dismantling
Wellhead Recovery System The wellhead system that fits the application. (Patent Pending)
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
A New Stripline Connection to JPARC Horn 1 Larry Bartoszek BARTOSZEK ENGINEERING 9/23/04.
Ion source maintenance on the MAT 253
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Threads- Terminology in threads- External thread-.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Chapter -9 WEB STIFFENERS.
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
Two styles of horn fastener insulation schemes Larry Bartoszek Bartoszek Engineering.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
JPARC Horn 1 Outer Conductor Middle Connection Larry Bartoszek Bartoszek Engineering.
SLAB BOX. You will learn How to create a slab box How to slip and score How to add designs to your ceramic box Ceramic vocabulary The steps in constructing,
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
Trouble Shooting How to Recognize Improper Installations January 2013 The Ford Meter Box Company, Inc. Table of Contents Valves and Corp StopsPages 1 -
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Module 4 Unit 17 – Springs and Fasteners in Industrial Prints.
Hub and Wheel Bearings Wheel bearings allow the wheel to turn freely. The bearings may be either tapered roller bearings or ball bearings. If the spindle.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
A First Pass at Modeling Horn 3 L. Bartoszek Bartoszek Engineering 12/10/04.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
2000SS 2½”-12”.
MACHINE PARTS (FOR DCE / DIT)
Finney Weir Giordano Chapter 5. Finney Weir Giordano, Thomas’ Calculus, Tenth Edition © Addison Wesley Longman All rights reserved.
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
The basic parts needed to make a flux capacitor are 8 high voltage capacitors (Vishay Cera-Mite 500 pf 15 KV capacitors with Y5U dielectric are suitable),
Welcome! Drafting 2323: Pipe Drafting
Step-by-step assembly instructions
Drawing of stud.
Step-by-Step Assembly Instructions – Cube Version
Fastening Wood Turn to Unit 10 on page 117.
774 DCDA 21/2”-12”.
CNGS horn / reflector in 2005: The story of the glass ring insulator
2000SS 2½”-12”.
880V 21/2”-10”.
Step-by-step assembly instructions
774 2½”-12”.
Step-by-step assembly instructions
Bunker Wall Design Wall ESS
Single Detector Design
SNS PPU Cryomodule Space Frame
Presentation transcript:

Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04

Assembly Scenario The pictures in this presentation show an assembly scheme for Horn 2 which parallels that of the MiniBooNE horn with a significant exception The pictures in this presentation show an assembly scheme for Horn 2 which parallels that of the MiniBooNE horn with a significant exception The last assembly step requires welding instead of bolting and is caused by the thin end cap regionThe last assembly step requires welding instead of bolting and is caused by the thin end cap region

Step 1: Lower IC into OC The fixture for welding the IC is not shown The fixture for welding the IC is not shown I did not spend time on figuring out the segments of the IC or the welding process I did not spend time on figuring out the segments of the IC or the welding process This scenario starts after all but the last weld is done This scenario starts after all but the last weld is done

Step 2: Make one end of horn water tight I assume a bolted connection at the end of the horn opposite the strip line, but it could be welded. I assume a bolted connection at the end of the horn opposite the strip line, but it could be welded. Water and current-carrying seals are not shown here Water and current-carrying seals are not shown here

Step 3: Rotate horn 180 degrees MiniBooNE rotated the horn to make measurements that allowed us to cut the last piece so that when the horn was bolted together the IC was in a state of zero stress—no tension or compression prior to pulsing MiniBooNE rotated the horn to make measurements that allowed us to cut the last piece so that when the horn was bolted together the IC was in a state of zero stress—no tension or compression prior to pulsing Rotating also allows the final operations to be done from on top instead of below—easier and safer Rotating also allows the final operations to be done from on top instead of below—easier and safer

Fixtures needed to hold inner conductor to outer prior to rotating the horn on the rotating fixture Photos show the MiniBooNE fixtures Water ports make handy places to mount fixturing between the inner and outer conductors

Step 4: Add ceramic ring The ceramic ring isolates the inner and outer conductors where the stripline connects to the horn The ceramic ring isolates the inner and outer conductors where the stripline connects to the horn MiniBooNE made a lifting fixture for the ring because it was too heavy for people on ladders MiniBooNE made a lifting fixture for the ring because it was too heavy for people on ladders Also put water seals in at this end (not shown)Also put water seals in at this end (not shown)

MiniBooNE ceramic ring lifting fixture

Step 5: Assemble studs Ceramic tubes isolate the fasteners that clamp the inner and outer conductors to the ceramic ring Ceramic tubes isolate the fasteners that clamp the inner and outer conductors to the ceramic ring A ceramic pin was used in MiniBooNE to cause angular alignment between pieces. May not need it here A ceramic pin was used in MiniBooNE to cause angular alignment between pieces. May not need it here

Step 6: Assemble flange This flange must be welded to the inner conductor to allow current from the stripline to make a complete circuit This flange must be welded to the inner conductor to allow current from the stripline to make a complete circuit MiniBooNE’s upstream flange could be bolted because it was thick MiniBooNE’s upstream flange could be bolted because it was thick This flange is too thin to boltThis flange is too thin to bolt

The thickness of the upstream end of the MiniBooNE horn allowed a bolted connection between the flange and the inner conductor

Step 7: Compress water seals More ceramics are used as insulating washers to compress the flange to the outer conductor, squeezing the water seals and the ceramic ring More ceramics are used as insulating washers to compress the flange to the outer conductor, squeezing the water seals and the ceramic ring All ceramics are used in compression where they have significant strength All ceramics are used in compression where they have significant strength I cannot recommend putting ceramics in tensionI cannot recommend putting ceramics in tension

Step 8: Final weld connection Once the water seals on both sides of the ceramic ring are tight the last weld that connects the flange to the inner conductor can be done Once the water seals on both sides of the ceramic ring are tight the last weld that connects the flange to the inner conductor can be done The weld prep on the flange can only be cut after the final length of the inner conductor is known (after weld shrinkage) The weld prep on the flange can only be cut after the final length of the inner conductor is known (after weld shrinkage)

Step 9: Corona ball assembly The threaded rods have sharp edges that could cause breakdown with the high voltage of the stripline The threaded rods have sharp edges that could cause breakdown with the high voltage of the stripline The solid model does not show these edges on the threadsThe solid model does not show these edges on the threads Corona balls hide the sharp edges and prevent corona discharge Corona balls hide the sharp edges and prevent corona discharge

Ready for attachment to striplines At this point the horn can be mounted to its support module and fitted out with water nozzles, stripline connections and everything else At this point the horn can be mounted to its support module and fitted out with water nozzles, stripline connections and everything else