Standard Costs: Direct Labor and Materials

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Standard Costs: Direct Labor and Materials Chapter Twelve.
Advertisements

Chapter 11 Standard Costs and Variance Analysis
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Principles of Managerial Accounting Chapter 10. Standard Costs Set to encourage efficient operations – management by exception. Quantity Standards A benchmark.
Standard Costing and Variances
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Cost Allocation: Theory Chapter Seven.
Cost Allocation: Theory Chapter Seven McGraw-Hill/Irwin Accounting for Decision Making and Control, 5/e © 2006 The McGraw-Hill Companies, Inc.,
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Standard Costs Pertemuan 7. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for planning.
© Pearson Education Limited 2008 MANAGEMENT ACCOUNTING Cheryl S. McWatters, Jerold L. Zimmerman, Dale C. Morse Cheryl S. McWatters, Jerold L. Zimmerman,
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Prepared by Debby Bloom-Hill CMA, CFM. Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Management Accounting in a Changing Environment Chapter Fourteen.
Management Accounting in a Changing Environment
Responsibility Accounting and Transfer Pricing
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
Chapter 12 – Standard Costs: Direct Labor and Materials
Chapter One Introduction. Chapter One Introduction.
CHAPTER ONE Introduction McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-3 Accounting for Decision Making and Control.
Standard Costs and Operating Performance Measures
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
1 Module 22 Standard Costs and Variance Analysis.
Absorption Cost Systems Chapter Nine Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Overhead and Marketing Variances Chapter Thirteen.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Chapter 9 Standard Costing: A Functional-Based Control Approach
Standard Costing and Analysis of Direct Costs CHAPTER 10 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
CHAPTER SEVEN Cost Allocation: Theory. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 7-2 Outline of Chapter 7 Cost Allocation:
CHAPTER NINE Absorption Cost Systems. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 9-2 Outline of Chapter 9 Absorption.
Standard Costing and Analysis of Direct Costs Chapter 10 McGraw-Hill/Irwin Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction.
Absorption Cost Systems Chapter Nine McGraw-Hill/Irwin Accounting for Decision Making and Control, 5/e © 2006 The McGraw-Hill Companies, Inc.,
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
Chapter 10 Standard Costs and the Balanced Scorecard.
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
CHAPTER FIVE Responsibility Accounting and Transfer Pricing.
Responsibility Accounting and Transfer Pricing Chapter Five Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 17 Budgeting.
Chapter 23 Flexible Budgets and Standard Cost Systems.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Prepared by Debby Bloom-Hill CMA, CFM
Cornerstones of Managerial Accounting, 5e
Standard Costs and Variances
Chapter 20: Standard Costing: A Managerial Control Tool
Topic Six by Dr. Ong Tze San
Standard Cost Accounting Materials, Labor, and Factory Overhead
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Chapter 20: Standard Costing: A Managerial Control Tool
Presentation transcript:

Standard Costs: Direct Labor and Materials Chapter Twelve Standard Costs: Direct Labor and Materials

Outline of Chapter 12 Standard Costs: Direct Labor and Materials Direct Labor and Materials Variances Incentive Effects of Direct Labor and Materials Variances Disposition of Standard Cost Variances The Costs of Standard Costs

Connection to Other Chapters Chapter 12 shows how standard costs and variances are used for decision control. Chapter 4 discussed the decision control process. Chapter 6 showed how budgets are used in decision control.

Standard Cost Definition: The expected cost that is reasonably required to achieve a given objective under specified conditions. Used for Decision Management: Standards can be better predictors of future costs than actual past costs. Can be used in product pricing, bidding, and outsourcing decisions. Used for Decision Control: Set performance expectations or benchmarks for the costs of products, processes, or sub-components. Variances from standards get attention of managers.

Setting and Revising Standards Setting standards depends on specialized knowledge. Price standards from economic forecasts Quantity standards from engineering studies Choosing between tight and loose standards Tight standards motivate higher performance (decision control). Loose standards allow more discretion (decision management). Standards are usually set once a year. Frequent revision would reduce incentives to control costs.

Target Costing Target costing is a technique used for new product planning. 1. Market planners begin with selling price required to achieve a desired market share. 2. Selling price Desired profit = Total target cost 3. Assign portion of total target costs to marketing, engineering, and manufacturing departments. 4. Redesign product and techniques to achieve target.

Purpose of Variances Variances measure the difference between actual and standard costs. Favorable (F) variance, if actual < standard Unfavorable variance, if actual > standard Decision control Variances alert managers to deviations from plan. Performance rewards may be based on minimizing variances.

Variance Computation Symbols: T= Total; A = Actual; S = Standard; P = Price; Q = Quantity Total Variance = Actual Cost minus Standard cost TV = (AQ  AP) - (SQ  SP) = (AQ  AP) + [ - (SP AQ) + (SP  AQ)] - (SQ  SP) = [(AQ  AP) - (SP  AQ)] + [(SP  AQ) - (SQ  SP)] = [AQ  (AP - SP)] + [(AQ - SQ)  SP] = PV + QV Total Variance = Price Variance + Quantity Variance See Self-Study problem.

Direct Labor Variance Symbols: a = Actual; s = Standard; H = Hours; W = Wage rate per hour Total Flexible budget Total actual based on standard cost actual input cost (Ha  Wa) (Ha  Ws) (Hs  Ws) |_______________________| |______________________| [Ha  (Wa - Ws)] [(Ha - Hs)  Ws] Wage variance Efficiency variance |_________________________________________________| [(Ha  Wa)  (Hs  Ws)] Total labor variance See Figure 12-1.

Interpreting Direct Labor Variance Large variances in either direction indicate performance is not as planned, due to either poor planning, poor management, or random fluctuation. Unfavorable wage variance Workers were not available at lower rates Unfavorable wage variance with favorable efficiency variance higher-paid workers performed work more efficiently Favorable wage variance with unfavorable efficiency variance lower-paid workers performed work less efficiently

Direct Materials Variance - current use In this case, no direct materials remain in ending inventories. Total Flexible budget Total actual based on standard cost actual use cost (Qa  Pa) (Qa  Ps) (Qs  Ps) |_______________________| |____________________| [Qa  (Pa - Ps)] [(Qa - Qs)  Ps] Price variance Quantity variance |______________________________________________| [(Qa  Pa)  (Qs  Ps)] Total materials variance See Figure 12-2.

Direct Materials Variance - no current use In this case, all purchased materials remain in ending inventories. Recognize material purchase price variance at time of purchase rather than waiting until materials are used. Qb = Actual quantity bought Total Flexible budget actual based on cost actual purchased (Qb  Pa) (Qb  Ps) |_______________________| [Qb  (Pa - Ps)] Price variance See Figure 12-3.

Direct Materials Variance - current and future use Total actual Flexible budget based cost on actual purchased (Qb  Pa) (Qb  Ps) |___________________________| [Qb  (Pa - Ps)] Price variance Flexible budget based Total standard on actual use cost (Qa  Ps) (Qs  Ps) |__________________________| [(Qa - Qs)  Ps] Quantity variance Price variance recognized at time materials purchased. Quantity variance recognized at time materials are used.

Timely Reporting of Materials Price Variance is Important! Managers can act quickly to mitigate or capitalize on price changes. For example, if a raw materials price rises, managers might want to use less of the more expensive material and more of the relatively less expensive material, if such a substitution is possible. And/or management might want to raise the selling price for the final products.

Risk Reduction and Standard Costs Risk reduction is a service individuals are willing to buy from financial markets. Standard costs remove price and efficiency fluctuation from performance measures of downstream users. Downstream users bear less risk because they know the standard costs they will be charged in the future.

Incentive Effects: Build Inventories Rewarding purchasing managers for favorable direct materials price variances creates an incentive for them to buy large quantities when price discounts are offered for high-volume purchases. Penalizing production managers for unfavorable labor efficiency variances encourages keeping labor busy producing more. Mitigation of inventory building incentive Charge purchasing department for cost of holding inventory. Just-in-time (JIT) purchasing and production policies

Incentive Effects: Externalities Purchasing externalities on production Purchase cheaper substandard materials. Purchase price variance is favorable. Unusable material results in unfavorable material quantity variance. Production externalities on purchasing Short lead times on requisitions lead to higher purchase prices. Requesting special orders for materials leads to higher prices. See self-study problem, part b.

Incentive Effects: Discourage Cooperation Evaluating performance evaluation on individual's variances Emphasizes individual instead of team efforts Reluctance to help others look good Solution: Base reward system on both individual and departmental (team) variances. Too much weight on teamwork can lead to shirking (free-rider problem).

Incentive Effects: Mutual Monitoring Method where managers or employees at the same level monitor each other’s performance Noninsulating allocations encourage mutual monitoring (see Chapter 7) Example when performance evaluation of both purchasing and production manager depends on both material price and quantity variances. Purchasing manager wants to help production manager become more efficient in material usage. Production manager wants to schedule requisitions to help purchasing manager buy materials at better prices.

Incentive Effects: Satisficing Satisficing behavior: Managers have incentives to achieve standard but go no further. Firm value would increase if managers attempted continuous improvement beyond standard innovate to meet competitive threats

Disposition of Standard Cost Variances Alternatives for disposing (writing off) standard cost variances are similar to the alternatives for disposing of over/underabsorbed overhead (Chapter 9). 1. Writing all variances off to cost of goods sold (expense) 2. Allocating between costs of goods sold (expense) and work-in process and finished good inventory 3. Recalculating the cost of each job The above alternatives are listed in order of increasing complexity.

Cost of Maintaining Standard Cost System Standard cost systems require Detailed standards for each labor and material input Updating for technological and price changes Time to investigate and explain variances Standard cost systems are less likely to be used when Direct labor cost is a small portion of total cost Rapid change in production processes or new product introductions would require frequent revisions of standards