1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct23. 2008.

Slides:



Advertisements
Similar presentations
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
WECC TEPPC Meeting SWAT Update
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Arizona Corporation Commission Workshop
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.
Charles Hosken, General Manager Imperial Irrigation District
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Arizona Corporation Commission Docket No. E-00000D Biennial Transmission Assessment Workshop II September 18, 2008.
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Arizona Corporation Commission Energy Workshop February 16, 2001.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
Yellowhead Area Transmission System Development
APS Ten-Year Plans th BTA Presentation
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Cooperation on Regional Siting: How Is It Working - A California Perspective Dian M. Grueneich, Commissioner California Public Utilities Commission National.
APS Top Renewable Transmission Projects Arizona Public Service Company November 23, 2009 Brian Cole John Lucas.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Navajo Transmission System
EI-WECC Seams Study Needed
Deliverability Maps for 2017 Peaking Capacity RFP
SPSG Meeting August 17, 2016 Salt Lake City, UT
SunZia Project Description
Presentation transcript:

1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct

2 BTA Order Decision No “IT IS FURTHER ORDERED that in the next BTA, Commission regulated electric utilities, in consultation with the stakeholders, should prepare an assessment of ATC for renewable energy and prepare a plan, including a description of the location, amount and transmission needs of renewable resources in Arizona, to bring available renewable resources to load.”

3 SWAT RTTF Phase #1 Integration of Renewable Resources into Arizona Transmission Network BTA Response Three Parts to the BTA Response –Assessment of ATC in Arizona –Assessment of maximum potential of renewable resources in Arizona –Develop potential transmission configuration to deliver the renewable resources in Arizona To comply with FERC 890 order it was decided to use the Southwest Area Transmission (SWAT) open stakeholder process to address BTA Order Renewable Transmission Task Force (RTTF) was formed as a subcommittee of SWAT.

4 SWAT RTTF Phase #1 AZ BTA Order Response Task Force Meetings Task force had two open stakeholders meetings( October 8 th and November 16 th 2007) –List of attendees: Arizona Corporation Commission Utilities –Arizona Public Service –Salt River Project –Tucson Electric Power –Southwest Transmission Corporative –Southern California Edison Developers (Renewable Energy Companies) –Skyfuel –BP Alternative Energy –Foresight Wind –West Wind Wires –Ausra –Solar Mission –Interwest Energy Alliance Other Stakeholders –National Renewable Energy Laboratory (NREL) Consulting Groups –Genesee Consulting –PDS Consulting –K R Saline –Stanley Group –WSES Consulting –20-30 people were at each meeting –Stakeholders and utilities participated in development of a resource map, transmission map, and assess the ATC in Arizona in an open forum to address the BTA

5 SWAT RTTF Part 1 -ATC Assessment This information was developed during stakeholder workshops held October 8th and November 16th 2007 and includes utility (APS, SRP, SWTC, and TEP) ACC staff and stakeholder input. Available Transfer Capability (ATC) has been gathered for each utility in Arizona as of June 2007 ATC is a dynamic number that can change from day to day and reflects current market condition

6 Arizona EHV Transmission ATC (as of June 2007) Phoenix 230 kV System Navajo Glen Canyon North Gila Palo Verde Silver King Kyrene Pinnacle Peak Westwing Liberty South Saguaro Vail Greenlee Cholla Moenkopi Preacher Canyon McCullough Eldorado Mead Tucson 138 kV System Devers Imperial Valley Coronado Four Corners Shiprock Tortolito Marketplace BrowningRudd Springerville Transmission Line Voltage Level 500 kV 345 kV ATC in MW

7 SWAT RTTF Part 2 - Resource Projection The renewable resource map was developed during workshop meetings on Oct 8th and Nov 16th 2007 A renewable resource map displaying areas where resources development potentially could occur and was developed with input from three specific areas The Arizona Renewable Energy Assessment recently prepared for APS, SRP and TEP by Black and Veatch (2007) The queue for renewable resource in Arizona requesting potential interconnection (as of October 15th 2007) Stakeholder/developer input on prospective development opportunities. The # of MW display on the map is the highest out of the three inputs.

8 Black & Veatch Summary Projected Resource Locations Geothermal/Clifton – 35MW Solar CSP/Yuma – 800MW Biomass/Biogas – 60MW (22 sites) Wind/Project KS – 18MW Hydro – 82MW (7 sites, GC) Solar CSP/Stoval – 1,900MW Solar CSP/Phoenix – 800MW Solar CSP/Tucson – 800MW Wind/Project RS – 140MW Wind/Project BR – 158MW Wind/Project CV – 597MW Wind/Project BH – 46MW Wind/Project GP – 31MW September 21 st 2007

9 B & V Summary Filters Solar Thermal –Equipment availability/supply chain –Engineering support –Project economics –Proximity to adequate transmission –Land availability/terrain slope/proximity to sensitive areas Wind –Equipment availability/supply chain –Wind Class/Capacity factor –Project economics –Proximity to adequate transmission –Proximity to environmental sensitive areas

10 Arizona Renewable Resource Queue CodeCompanyCODMW SizePOICountyType T1TEP200580Dolan Springs SubMohaveWind T2TEP200815Dolan Springs SubMohaveWind T3TEP200515Dolan Springs SubMohaveWind T4TEP200795Co-SprSt JohnsWind A1APS200860Cholla - CoconinoCoconinoWind A2APS Cholla ShowCoconinoWind A3APS200722Cholla zeniffCoconinoBiomass A4APS Ashofork - PollockCoconinoWind A5APS cholla - showCoconinoWind A6APS Adams - MuralCochiseWind A7APS Harquahala JncMaricopaSolar A8APS Panda Liberty lineMaricopaSolar A9APS Gila BendMaricopaSolar A10APS North Gila SubYumaSolar W1WAPA Tap on 345kV Glen Canyon-Pinnacle PeakCoconinoWind W2WAPA Mead - Davis 230 kV LineMohaveWind W3WAPA Goldmine Tap SubstationImperialWind W4WAPA Peacock SubstationMohaveWind N1 Navajo Nation100Wind Total3420.6As of 10/15/2007

11 Arizona Renewable Resource Queue CodeMW Size T180 T215 T315 T495 A160 A2128 A322 A4270 A A6100 A7110 A8110 A9300 A10400 W1500 W2300 W365.1 W4500 N1100 As of 10/15/2007

12 SWAT RTTF Part 2 - Resource Projection The map is intended to provide an overview of the potential, renewable resources within Arizona, which include wind, solar, biomass, hydro and/or geothermal and identifies those resources as clusters. Since both geothermal and biomass/biogas opportunities are small relative to both solar and wind opportunities, they have been included within the total which is described as generally wind and solar clusters.

13 Potential Arizona Renewable Resources

14 Quality of Wind Resources In Arizona *Developed by DOE and NREL At 50m elevation, Class 4 or higher is typically used for utility scale wind generation (NREL). At 80m elevation, Class 3 areas could have higher wind power class because of possible wind shear (NREL) Arizona has predominately Class 3 or lower wind resources Taken Directly from the United States Department of Energy website:

15 Quality of Solar Resources In Arizona Potentially sensitive environmental lands, major urban areas, water features, and areas with slope >1% were excluded to identify those areas with the greatest potential for development. (NREL) Taken Directly from NREL website:

16 SWAT RTTF Part 3 - Transmission System During the October 8th and November 16th 2007 meetings, transmission alternatives for bringing the renewable energy resources to load were developed. Final transmission configuration represents the potential transmission lines that would be necessary if all of the renewable resources were to be developed in Arizona.

17 Development of Final Transmission Configuration In open stakeholder process three engineering groups were formed to brainstorm possible future transmission scenarios in the Arizona Each of the three groups independently created a transmission map A final transmission configuration was approved in SWAT stakeholder meetings

18 SWAT RTTF Part 3 - Transmission System Included in the map are: existing transmission lines APS, SRP and TEP 10 year plans other WECC Projects in Phase II or Phase III of rating process potential transmission lines to integrate renewable resources

19 Potential Configuration for Transmission to Serve All Available Renewable Resources in Arizona

20 Potential renewable transmission routes

21 Estimated Construction Costs Substation Additions Voltage (kV) # of Substations Added Totals Cost (Million) Substations$130 Lines$1,500 Total$1,630 Transmission Circuits Voltage (kV) Miles

22 SWAT RTTF Phase #2 – Evaluation and Integration of Renewable Resources of Southwest into Transmission Network Workshop Meetings held on April 7 th and May 19 th 2008 –Renewable resource projection development –Potential transmission additions are in development for the entire SWAT area Renewable Taskforce has been extended to the entire SWAT area and includes Arizona, New Mexico, Nevada and Eastern California Power flow studies will be developed based on the transmission alternatives

23 Southwest Area Transmission SWAT SWAT Footprint One of the WestConnect Sub-Regional Planning Groups SWAT Footprint One of the WestConnect Sub-Regional Planning Groups

24 CCPG NWPP Area WECC (PCC & TEPPC) CAISO PSPA Others LADWP RETI Col.Grid SWAT NTTG SSPG West Connect NTAC Western Transmission Planning Today WGA & CREPC WIA CEDA 24FERC Transmission Barriers Conference 10/14/08 RETA

25 Potential Resource Location

26 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos BTA Workshop May