Proposer: Hayley Burden Panel Date: 17th April 2014 0494: Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Energy24 limited Modification Proposal 0502: Amendment to Gas Quality NTS Entry Specification at the px Teesside System Entry Point.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Proposer: insert Panel Date: insert 0XXX: Mod Title: insert title Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod Clarifications Transmission Workstream 6 August 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Mod Proposal Prevention of "Timing Out" of Authority decisions on Modification Proposals Nick Reeves.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Proposer: Matthew Hatch Panel Date: 20/10/16
Review of Demand Estimation Times for Modification Proposal 461
EU Implementation Programme
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Proposer: National Grid NTS Panel Date: 17th April 2014
2019 Release Planning Options inc Modification 0621 / GB Charging Project DSC Change Management Committee update July 2018.
UNC 0621L: Amendments to Gas Transmission Charging Regime
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Rebecca Hailes For 15 March 2018
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Transmission Workgroup 6th March 2014
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Draft Mod: Update of default System Marginal Prices
UNC 0621L: Amendments to Gas Transmission Charging Regime
Richard Fairholme Transmission Workstream 4th September 2008
EU Balancing Code – Mod 494 Imbalance Charge Amendments
CUSC “Alternate” Proposal process
Proposer: Debbie Brace Panel Date: 20th March 2014
EU Codes: Implementation Issues
Proposer: Colette Baldwin – E.ON Energy Solutions Ltd
Title slide [from Title Slide master]
Mod 0489 EU Balancing Code - Information Provision changes required to align the UNC with the EU Code Debbie Brace 25th April 2014.
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas Balancing of Transmission Networks

Why change? EU Gas Balancing Code sets out, for the purpose of daily imbalance charge calculations, how the System Marginal Price for the buying and selling of gas shall be determined. There is a difference between the Balancing Code calculation and the calculation that is currently utilised in the GB regime In UNC, the System Marginal Buy Price (SMBP) and System Marginal Sell Price (SMSP), can be set by using any Market Balancing Action taken by National Grid NTS (e.g. SMBP can be set by a Market Balancing Buy or Sell Action, and SMSP can be set by a Market Balancing Buy or Sell Action). The Balancing Code states that, if the System Marginal Price is being set by a Market Balancing Action, a Market Balancing Buy Action can only set SMBP, and a Market Balancing Sell Action can only set SMSP. This obligation applies across the GB balancing regime.

Options GB is required to be compliant with the EU Gas Balancing Code, therefore changing the UNC facilitates legal compliance As a result, options are limited, however NG NTS is seeking an approach that requires minimum change to the GB industry

Solution Change the imbalance charge calculation in UNC (Section F 1.2 System Prices) to match the imbalance charge calculation detailed in the EU Balancing Code (Chapter V, Article 22 Applicable Price)

Recommended Steps The Proposer recommends that this modification should be:  Not subject to self-governance because the Proposer believes that as a consequence of implementation there is likely to be a material impact from the proposal on commercial activities connected with the shipping of gas conveyed through pipes  Workgroup assessment to develop the modification for 6 months but it is our expectation that this could be completed earlier