ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

Department of Education, Employment and Workplace Relations
ACARP – Accepting the Safety Challenge  ACARP  Safety Component  The Challenge  New Direction  Conclusion.
Introduction of Continuous Miner Monitoring at Clarence Colliery ACARP Roadway Development Workshop Introduction of Continuous Miner Monitoring at Clarence.
Relationships, Delayering, Outsourcing etc…. Formal Relationships Line relationships Relationships between a superior and a subordinate, eg, DHT and PT.
TOTAL MINING MANAGEMENT SERVICES Front Line Supervisor ACARP Presentation PO Box 1225 Newcastle NSW 2300 Phone Fax
Research Update Automated Bolting and Meshing Project - C17018.
Development Taskforce Presentation
Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University.
Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary.
ACARP Australian Roadway Development Improvement Project CM2010 IMPLEMENTATION STRATEGY August/September 2009 Guy Mitchell, BMA Coal Bob Miller, Centennial.
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
Part A - QUALITY AS (3.1): Demonstrate understanding of how internal factors interact within a business that operates in a global context.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
Lean Supply Chain Action Learning Program September 2007.
ACARP Conference – September 2007 Lessons from Manufacturing.
Performance Measurement. Integration of Information for Process Improvement and Innovation Palmira López-Fresno President. Quality Service Committee Spanish.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
Identity & Purpose Desired State Vision 2012 Target Achievements Projection into the external environment Key Successful factors / Value Drivers / Internal.
Induction and Training
Key Performance Indicators - KPI’s
Effectively applying ISO9001:2000 clauses 5 and 8
Allen Hepner Senior Planning & Performance Manager September 22, 2011
16 Beltana Development ACARP Roadway Development Operators Workshop Sept
MAV Planning Improvement Conference Leadership & Culture Change Presenter: Janet Dore - CEO.
Energy Efficiency Opportunities (EEO) Program 2nd International Conference on the Global impact of Energy Management Systems: ‘Creating the right environment.
Research Update Automated Bolting and Meshing Project.
From Conformance to Performance: Using Integrated Risk Management to achieve Organisational Health Ms Stacie Hall Comcover National Manager.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
Integrating Safety Management Systems – Opportunities for Improvement
ACARP Roadway Development - Operators Workshop March 2008
BM Unit 2 - L051 Higher Business Management Unit 2 Learning Outcome 5 Operations.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Presented by Linda Martin
Introduction to PSMO Process Safety Management for Operations.
LowCarb4Real Knowledge Exchange Plan outline. Knowledge Exchange.
1 The short project Planning, management and control.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
Total Productive Maintenance (TPM)
Generic Skills Survey 2003 DRIVERS OF SKILLS NEEDS.
Engin Ali ARTAN Industrial Engineering
13/2/08 Fundamental Analysis of Development Cycles at Xstrata NSW Mines ACARP Roadway Development Operator Workshops March 2008.
SOFTWARE DESIGN AND ARCHITECTURE LECTURE 05. Review Software design methods Design Paradigms Typical Design Trade-offs.
1 ACARP Roadway Development Operator Workshops March 2009 Modelling of Gateroad Development Ernest Baafi – UOW Geoff Gray – SMS Ian Porter – UOW Osvaldo.
Minerals Industry Safety and Health Centre The University of Queensland What works best at improving mine worker safety and why does it work Carmel Bofinger.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
MASSEY ENERGY APPRENTICE TRAINING MINER TRAINING PROGRAM TY COLEMAN.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Overview What do we mean by a Learning Organisation? Why did we develop a People Development Framework? What was the process involved in building the.
Partnering. The West’s response to Japan’s greater efficiency in major manufacturing industries Japan’s approach is based on cooperative, long term relationships.
A guide to... Safe Systems of Work.
What can Business Psychology do to map and measure Organisation Culture? A presentation for the Association of Business Psychologists 22nd September 2003.
Making knowledge work harder Process Improvement.
Kathy Corbiere Service Delivery and Performance Commission
1 Beltana Development. 2 Beltana Overview Process Control Continuous Improvement Summary.
Safe Systems of Work. Legislation w HSWA Section 2 (2) (a): Provide and maintain plant and systems of work that are, so far as is reasonably practicable,
DEVELOPMENT OF THE ABM25 POST CRINUM March 2007 Doing the basics better - West Wallsend, Crinum and Ulan.
SOFTWARE PROCESS IMPROVEMENT
MIS.
©, Manuel Benito, Paris, Mars 2006 Focusing in the process of building a Virtual Campus as a tool for ODL The experience of the University of the Basque.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
© 2015 Deloitte Belgium1 Enhancing the management culture at DG EAC Implementation of a 360° feedback exercise.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Bringing an SMS Manual to Life Simon Roberts SMS Programme Lead UK CAA.
Organizational Behavior (MGT-502) Lecture-42 Summary of Lecture-41.
Benchmarks and quality management
Priorities and system changes
Presentation transcript:

ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal

Safety, Safety, Safety

A Systems Approach to Roadway Development  Components of Roadway Development  Outline of “Systems Approach”  Hierarchical Components  Focus on Process Improvement  Importance of Information Flow

Process Roof Support Commu- nication Miner Pumping Panel Set-up Shuttle car Standard s Hazard Ma ps Culture Ventilation Gas Control KPI’s Mining Cr ew Bonus Roadway Maintenance Conveyo r Advance Stone- dusting Maintenance Systems Pro cess Improvem ent Power Training Safety Roster

Firstly, a systems approach incorporates people issues and technology into processes – People are Pivotal Systems Approach ?

Secondly, a systems approach must understand the complexity of systems structure and the dynamics of the interactions between processes. Systems Approach

Thirdly, a systems approach recognises natural variability is a normal part of any process. Systems Approach

Lastly, a systems approach recognises that the collection and use of information is a key factor. “Information is Data that Informs” Lastly, a systems approach recognises that the collection and use of information is a key factor. “Information is Data that Informs” Systems Approach

1.Mining Systems (cutting, bolting, transporting) 2.Organisational Factors (manning allocation and organisation, measurement systems and motivational factors) 3.Machinery Supply and Support 4.Strata Support and Gas Control 5.Systems Support (panel layouts, extensions, gas and water drainage, ventilation, floor control) 6.Maintenance Practice 7.The Human Element (workforce, management, culture, industrial environment) 8.Safety Systems Key components and interactions of the existing system

The first model is a simple form of process mapping (or a simple project management Gantt chart) Roadway Development Models

The key questions to be answered are:  What is the process map at each level of the hierarchy?  What is the interaction between hierarchies?  Who is responsible for the overall process at each hierarchical level?  For each of these levels what is measured and what is the focus? Hierarchical Model

Mine Improvement Areas?  Roster Design – Is the roster currently maximising face, maintenance, set-up times?  Formal Introduction of Process Improvement?  Maintenance management system tailored to roadway development requirements?  Focus on data management for process improvement, not historical data collection for upwards summaries.  Bottom Line - STRONG FOCUS REQUIRED ON ENABLING TEAM TO IMPROVE PROCESS KNOWLEDGE AND INCREASE THEIR ABILITY TO INFLUENCE

Panel Improvement Areas ?  Separation of Panel with Mains – achieving that “push button start”  Use of project management approach in mains driveage  Panel Plan,  Standard Area Methods  Integration of activities  Supply systems & wastage  Hazard Plan, short interval control, feedback loops  Communication Plan  Methods  Reinforcement of Best Practice  Formal feedback loops  Hazard treatment, response time  Travel Time into face  Total cost of driveage  Design & Deliver Technology pack to allow cycle optimisation

Standard Area Methods Aims:  standardise the method of development across the shifts  establish “best” practice  improve people’s knowledge of that practice  formalise a process that will allow crews to initiate improvement.

Pillar Cycle Improvement Areas?  Focus of Continuous Improvement into pillar cycle  Optimisation of panel extension – decoupling of non-critical tasks – teamwork interaction and training – “example” belt move – review after each pillar  Standards for longwall operation  Maintenance shift <> hot start both ways

Face Cycle Improvement Areas?  THROW OUT SHIFT TARGETS  Understand constraints on uptime rates – empower team to remove  Understand constraints on utilisation time – empower team to remove  Reinforce cutting cycle optimisation  Reinforce panel standards  Reinforce alternative work options  Ensure effectiveness of maintenance delivery

Systems Approach Emphasis on:  Process improvement  Use of Information

Natural Variation

Decreasing Variation

Reducing Variation of Sub- processes

Continuous Improvement

Step Change

Information the Key Remember information, not data is the key for success:  Information should be analysed not averaged Setting effective KPIs is essential Effective analyses for process improvement  Information should be 50% downward  Feed back loops are a necessity for exception reporting  Use reviews to improve process knowledge

Site Commitment The commitment from the mine will need to include:  A desire to improve performance.  Acceptance that this will involve a change process.  Process must involve faceworker, middle management as well as senior management support.  Process may involve a major change in the way information is collected and used. Key to the Success  Site commitment to Roadway Development improvement to ensure it is fully integrated with all site activities

Some Takeaways  Take the blinkers off with safety  Holistic Approach – don ’ t just focus on face equipment  Define the process & give it an owner  Use Process Improvement to attack waste  Information to the process teams to drive improved knowledge and empowerment  Site commitment is essential A systems approach incorporates people issues and technology into processes – People are Pivotal