17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.

Slides:



Advertisements
Similar presentations
Operational Amplifiers
Advertisements

1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
AIMS TF Upgrade Update 6/18/14. Breaker & Contactor Control & Status 6 Pulse Dual Converter with Lockout Controls (and Shoot-through Protection) Auto-Crowbar.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Project Improvement Ideas Brian Drost Bangda Yang.
SE 207: Modeling and Simulation Lab # 2:Basic Operations of the Analog Computers.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Layout of the Power Distribution on Support Tube for Phase I Lutz Feld, Waclaw Karpinski, Katja Klein, Jan Sammet, Michael Wlochal.
Jan B.Allongue1 WIENER “MARATON” POWER SUPPLY TESTS Introduction. Magnetic field tests. Plans for radiation and electrical tests. Conclusion.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
DC-DC Buck Converter in Inner Detector Environment
12/2/2001Ivan Hruska & Georges Blanchot1 LV power supply for TILECAL Requirements –7 outputs for one drawer (+5V, -5V,+15V,- 15V,+3.3V) –total power is.
HV8CB Vihtori Virta Specification review. Motivation 0 – 4000V variable high voltage board Can be used in many applications.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Patrick Coleman-Smith CCLRC Daresbury 1 AGATA Digitiser Summary February 2005 Patrick J. Coleman-Smith For the Digitiser Technical Group  I.Lazarus Daresbury.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Simulate LINC system in ADS Song 03/30/2005.
Power Management for Embedded Systems. Power requirement for Embedded Micro Systems Multiple supply voltages Small size in all components, L R C etc High.
19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL News –Market survey is close to the final state PS requirements for whole box Bricks specification.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
7/2/2003Ivan Hruska,Francisca Calheiros1 Radiation test of components for LV power supply design  Test done in PSI verification and selection.
Bagby, Foglesong General Silicon Meeting Run IIb LVPS Status  Design Goals  Key Issues  System Diagrams  Prototype – 1%  Plans.
V.Shutov Dec.2014 Present Design Status Of Multichannel Power Supply For AHCAL SiPMs.
Developments on power transfer at CERN (DC-DC converters) Philippe Farthouat CERN.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Power Supply The basic function of power supply is to convert the AC supplies available at wall socket, that which is unusable by the computer. The SMPS.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
Plasma Sense Amplifier
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Michał Matusiak Sławomir Wronka
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
1 Radiation worries in the cavern L.Jirdén
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MEGA Electronics, Inc. Powering Your Products Power Cords Power Supplies & DC/DC and AC/DC Converters Headquarters: MEGA Electronics.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Upgrade of the TileCAL LVPS System Gary Drake Argonne National Laboratory, USA In Collaboration with The University of Chicago CERN Feb. 25, 2009 ATLAS.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Low Cost Universal Test Equipment Survey on Power supplies.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Development of DC/DC converter in VHF band Ivo Polák and Jiří Kvasnička on behalf of the BRAHMS project Institute of Physics of the ASCR, Na Slovance 2,
UOP ECT 246 All iLabs (Week 1 to Week 7) Check this A+ tutorial guideline at For more classes.
SMPS.
Rectifiers, Filters and Regulator
Solid State Amplifier Development at PSI
LVPS HEC Overview and Development
Update of MVD services and requests
Chapter 27 Power Supplies.
Injectors BLM system: PS Ring installation at EYETS
Switching DC Power Supplies
Evaluation and testing of advanced low-voltage power supplies
PHASE SEQUENCE CHECKER
EECT 121 Lab Notebook Lucas Bazile.
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to be able to use box from last year with water cooling 3 types of module 3.3V, 5V, 15V output power ~ 200W dissipated power ~ 20W projected efficiency >90% input voltage V (will be verified in PSI) isolated converter equipped by all in/out diagnostics TID 300Gy, NIEL 6.3E12, SEE 1.8E12

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 2 TILECAL brick development Block diagram LV FINGER BOX 8 x DC/DC AC/DC in USA15 ELMB Power to next fingers CAN BUS daisy chain Power to the drawer Interlock circuit + CAN power supply

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 3 TILECAL brick development Power distribution computed Cable estimation prepared

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 4 TILECAL brick development

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 5 TILECAL brick development Schedule of development prepared –2 competitive designs in preparation but by using some common circuits –Designs split to blocks for independent tests –Optically isolated amplifier (OIA) feedback measurement uses HPCL7840 & LM 6142

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 6 TILECAL brick development March 2002 –2 different designs in preparation Half bridge converter Dual transistor forward converter –Transformers design & manufacturing –Component ordering –Radiation test of OIA in TCC2 in preparation

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 7 TILECAL brick development April –Finished protoboard of half bridge converter –OIA protoboard ready and lab tested –Installation of OIA in TCC2 May –Preparation of protoboard with forward converter

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 8 TILECAL brick development –Preparation of proto PCBs for SEE test of components –Started PCB design with SMD components

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 9 TILECAL brick development –Start of TCC2 test after > 7krads OIA without visible changes of parameters –Started preparation for PSI test facility Run scheduled to June 2002 SEE test of component candidates SEE test of both designs + original design from LT test of OIA projected efficiency >90% input voltage V (will be verified in PSI)

17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 10 TILECAL brick development Conclusion –Preparation to PSI test is running –Radiation requirements agreed –First prototype module in preparation