Bases, Subbases, & Low Cost Surfaces Dr. TALEB M. AL-ROUSAN.

Slides:



Advertisements
Similar presentations
Types & Uses of Asphalt Materials
Advertisements

Bituminous Materials.
UNIQUE SOILS (BASIC PRINCIPLE & IMPROVEMENT METHOD) Session 11 Course: S Ground Improvement Method Year: 2010.
Ms Ikmalzatul Abdullah BITUMINOUS MATERIALS. Definitions: Binder: A material used to hold solid particles together, i.e. bitumen or tar. Bitumen: A heavy.
Highway Engineering Pavement Types
REVIEW FOR FINAL CONSTRUCTION MATERIALS: WOOD CONCRETE BITUMENS (ASPHALTS) MASONRY WHAT YOU NEED TO KNOW ?? QUALITY CONTROL ASTM SPECIFICATION MANUFACTURING.
MODULE 4 ASPHALT MIX DESIGN*
Construction Materials (CE 1206)
Module 4-2 : Joint Sealing
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
CE-303-Lecture #1 Fundamentals of Concrete Objectives To explain the basic concepts of concrete To explain briefly the properties of freshly mixed concrete.
Asphalt Materials.
Properties of Asphalt Important properties of asphalt include: Adhesion Consistency Specific Gravity Durability Rate of curing Ductility Aging and.
Eng. Malek Abuwarda Lecture 13 P1P1 Construction Methods Lecture 13 Production of Concrete and Asphalt.
Asphaltic Concrete Mix Design
PART 8 BITUMINOUS MATERIALS
Chemical Stabilization of Subgrades Section Engineers ’ Meeting Lake Cumberland State Resort Park March 5-7, 2013.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
HIGHWAY ENGINEERING AND TRAFFIC ENGINEERING CENG 95.
Bases, Subbases, & Low Cost Surfaces
CHAPTER 3 PAVEMENT COMPONENTS
Pavement Design Terms and Concepts
Physical Science Applications in Agriculture
AGGREGATES There are two types of aggregates Coarse Aggregates
An Introduction To Chemical Soil Stabilization Presented by: Marco Silvestre, P.EGary Dukewits.
Masonry Cement and Mortar
Introduction Dr Magnus Currie From Scotland, UK MEng Civil Engineering
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
Flexible Pavement Design
Engineering Properties of Soils Soil Types
Soil Stabilization By: Monica Acosta.
Strength of Concrete.
A SEMINOR ON SOIL STABILISATION Prepared by D.ARUNA.
COMPACTION Topic COMPACTION Presented to Dr. Ayub Elahi Presented by Group leader. M.Zeeshan haider yousaf Zia. # 14 Haider ayub # 13 Bilal ansari #35.
Placing Quality Concrete
Pavement Maintenance II
October 9, 2008 Spokane, Washington Fundamentals of Design and Construction of Full-Depth Reclamation Pavements The Washington State County Road Administration.
Concrete By John Templeton. What is concrete used for? SidewalksDrivewaysFoundations.
Dr. Wa'el M. Albawwab ECGD4228 Transportation Engineering II Summer 2008 Sat. 15:30-18:30 PM K004.
Plain Concrete I. *Definition 1. Concrete: a hard, strong construction material consisting of a hardened or set mixture with such aggregates as sand, gravel,
“Properties of Concrete” Introduction
4.7.2 High-strength Concrete (HSC) Introduction –Definition –Classifications Choice of HSC raw material –Binding material –Excellent aggregate –Superplasticizer.
Pavement Types Dr. TALEB M. Al-ROUSAN.
Site Work.
Liquid Soil Stabilizer & Road Compactor BASE2000 D. C. A. GEOTECHNIC. ENGINEERS TOP2000 Liquid Surface Sealer & Dust Control Base Marketing International.
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
Surface Treatments #2.
1 Aggregate Primary function: TRH 3 : Surface Seals for Rural and Urban Roads Components  Resistance to abrasion of base  Transfer of wheel load to pavement.
Soil cement   1 1.
PRESENTATION ON FOUR WEEK SUMMER TRAINING AT PWD GORAKHPUR
Highway Network System
Concrete By John Templeton. What is concrete used for? _________________ Driveways _________________.
1 6.3 Asphalt Mixtures and HMA Marshall mix design method T RANSPORTATION S YSTEM E NGINEERING 1,
Under the Guidance of Prof. Jayashree Sengupta
Chapter 5: Pavement Structure and Base
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
Pavement materials Bitumen
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
DAMP-PROOFING AND WATER-PROOFING COURSE
HIGHWAY MAINTENANCE Failures in flexible pavement.
Structural Design of Highway
Structural Design of Highway
AGGREGATE Aggregates may be NATURAL or MANUFACTURED
In geotechnical engineering, soil compaction is the process in which a stress applied to a soil causes densification as air is displaced from the pores.
PAVEMENTS CEE 320 Steve Muench.
Introduction to Pavement Design
Department of Civil Engineering
Pavement Structural Analysis
DRY CAST CONCRETE FOR BOXES
Light Compaction Equipment
Presentation transcript:

Bases, Subbases, & Low Cost Surfaces Dr. TALEB M. AL-ROUSAN

Soil Stabilized Roads Soil stabilization: Combination and manipulation of soils, with or without admixtures, to produce a firm mass that is capable of supporting traffic in all weather conditions. Stable stabilized soil must have sufficient shearing strength to withstand traffic loadings in all weather conditions without excessive deformations. If stabilized soil is to be used as wearing surface, then it must be capable of withstanding the abrasive effects of traffic.

Soil Stabilized Roads Cont. Purpose: Effective utilization of local materials in order to decrease construction cost. Used when natural soil has unfavorable characteristics and require modification. Primary use of stabilized soil is in base and subbase construction. Stabilized base and subbase support thin wearing surfaces for light traffic. Stabilized base and subbase may function as base for high type pavements with heavy traffic.

Classes of Stabilization 1. Soil-Aggregate Roads and Granular Stabilization. 2. Bituminous Soil Stabilization. 3. Soil-Cement Roads 4. Stabilization by addition of Salt, lime, and various other chemicals.

Soil-Aggregate Roads and Granular Stabilization Consist of a substantial layer of a properly proportioned and blended mixture of soil and aggregates compacted to form a road. AASHTO : Known as (dense-graded aggregates) It’s a natural or prepared mixture consisting predominantly of stone, gravel, or sand and containing silty clay. Construction procedure: 1. Road mix construction 2. Traveling plant construction 3. Central plant construction

Soil-Aggregate Roads and Granular Stabilization Cont. Calcium Chloride is used some times to expedite the compaction process by slowing the rate of evaporation from the mixture. Calcium Chloride might increase density and maintain moisture in wearing surfaces for desired max stability which will prevent raveling of the surface and reduce dust.

Bituminous Soil Stabilization Bituminous materials are used in conjunction with aggregates and soil-aggregate mixture for two purposes: 1. Supply cohesion to the stabilized soil mixtures (Like in Sand stabilization). 2. Waterproofing Mostly used for base construction. Used with : well-graded soils, sands, and clays. Finer soils require more bitumen for waterproofing. Very fine plastic soils can not be stabilized economically with bituminous materials because of difficulties of pulverization and mixing.

Bituminous Soil Stabilization Cont. Choice of bitumen depend on local experience and comparative cost. Use 4 – 7% bitumen Types of bitumen: 1. RC: use for sandy soil or soils with min. clay or silt. 2. MC : used for soils with higher clay or silt particles (give more homogenous mixes) 3. SC: used for soils with % silt & clay. 4. MS & SS emulsified asphalt (Table 18-3).

Bituminous Soil Stabilization Cont. Oiled earth surfaces: Liquid bitumen is applied at properly prepared natural soil surface. Prevent dust and provide a thin stabilized surface that support limited number of light vehicles. See Construction method in Text.

Soil-Cement Roads Incorporating Portland cement (7 – 14% volume of compacted mixture) with naturally occurring or artificially created soils or soil-aggregate mixtures. Used for bases in city street constructions, driveways, shoulders, parking areas, and some airport runways. Also known as cement-treated base.

Soil-Cement Roads Cont. Nearly all subgrade soils may be stabilized with cement except those soils that contain high percentage of organic materials. Silt and clay require large percentage of cement for successful stabilization. Sandy and gravelly soils with 10 – 35% silt and clay have most favorable characteristics. See construction method in Text.

Stabilization by Addition of Lime Incorporating small amounts of hydrated lime improves certain plastic clay soils. Used to reduce plasticity, shrinkage, and swell of clay soils and increasing their bearing capacity. improve workability of plastic soil (easy to pulverize). Waterproof soil to some extent and allow it to dry quickly when saturated to expedite construction.

Stabilization by Addition of Lime Cont. Use 3 – 6%. Depth of treatment around 6 inches. Subgrade soil is scarified and pulverized, then lime is spread mechanically, water is added (+ 5% above opt.), then allowed to cure for (1 -7days). Mixing and compaction is then applied.

Macadam Roads Road surface or base in which crushed or broken stone was mechanically keyed or locked by rolling and cemented together by the application of stone screening and water. Later, bitumen macadam roads were built using bitumen material as binder. Water-bound macadam: broken stone bound together by stone dust and water applied during construction (Seldom Constructed). Bituminous macadam: crushed stone base or wearing surface in which fragments are bound together by bituminoius material; the aggregate layer is compacted and bituminous material is applied to the surface (Known as penetration macadam).

Bituminous Macadam Construction 1. Spreading and rolling of coarse aggregates. 2. Initial application of bituminous material. 3. Spreading and rolling of key aggregates. 4. Application of seal coat

Prime Coats Application of liquid bituminous material to previously untreated base or wearing surface. Bituminous material penetrate surface and completely absorbed Purpose: 1. Promote adhesion “bond” between base and wearing surface. 2. Consolidate the surface on which the new treatment is to be placed. 3. It may function as a deterrent to the rise of capillary moisture into the wearing surface.

Prime Coats Cont. Use low viscous asphalt or tar. Asphalt preferred to have high penetrated qualities and should leave high viscosity residue in the void spaces. MC-30 and MC-70 widely used for dense tightly bond surfaces, and surface with more opened texture. Slow setting emulsified asphalts are recommended for penetrable surfaces. Recommended quantity (0.9 – 2.3 L/m^2).

Tack Coats Single application of bituminous material to an existing bituminous, Portland cement concrete, brick, or block surface or base. Purpose: Provide adhesion between the existing surface and the new bituminous wearing surface. RC-70 through RC-250 are frequently used. Quantity required for application is small (0.19 to 0.38 L/m^2).

Seal Coat Very thin single surface treatment that is usually less than (½ in) thick. Single Surface treatment = single application of bituminous material that is covered by a light spreading of fine aggregate or sand (spread mechanically) then compacted with pneumatic tired rollers. Applied as final step in many types of bituminous wearing surfaces.

Seal Coat Cont. Purpose: 1. Waterproof or seal the surface. 2. Rejuvenate or revitalize old bituminous wearing surfaces. 3. To nonskid slippery surfaces. 4. Improve night visibility.

Slurry Seal Coat Mixture of well-graded, fine aggregate, mineral filler (if needed), emulsified asphalt, and water. Use principally for the resealing of old bituminous wearing surfaces. Very thin (1/8” to ¼”). See Figure 18-6.