Evolution of Indian Power Grid Phenomenal expansion since Independence  Generation : 1349 MW 101,866 MW (in 1947) (in 2001)  Grid : Local grid – at.

Slides:



Advertisements
Similar presentations
Initiatives in Transmission Systems Along India – Nepal border September 23, 2008 Kathmandu.
Advertisements

1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Sharing of ISTS Charges & Losses Regulation
POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
Presentation on Over view of Indian Transmission Grid
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission System in India
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Electric Entities: New Models
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
Alok Roy. UHV/EHV Level HV/MV Level LV Level The Concept of a power grid.
Indian Power Sector- Clean Coal Technologies V.S. VERMA MEMBER, CERC 1.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
W E L C O M E Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Electric Entities: New Models Sh. R.P. Singh CHAIRMAN & MANAGING DIRECTOR POWER GRID CORPORATION OF INDIA LIMITED.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Presentation on Capacity Addition targets for X th Plan MINISTRY OF POWER 2 nd May 2002.
Overall National Grid Development: Constraints & Options
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
2nd Workshop on PGI in NEA, May , Shenzhen, China 1 “RFE-NEC-DPRK-RK” POWER GRID INTERCONNECTION Sergei Podkovalnikov Energy Systems Institute,
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Operationalizing One Nation One Grid
REGIONAL GRIDS IN INDIA – QUICK FACTS
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
RE Grid Integration Study with India
Presentation transcript:

Evolution of Indian Power Grid Phenomenal expansion since Independence  Generation : 1349 MW 101,866 MW (in 1947) (in 2001)  Grid : Local grid – at the time of Independence. State Grids – emerged in 1960s. Regional Grids – in 1970s. Five Regional Grids – Northern, Western, Southern, Eastern & North-eastern National Grid – under progress.

Power Scenario – at a Glance Existing Installed capacity - 101,866 MW Coal – 71% Hydro – 25 Nuclear & others – 4% Peak demand Peak power - 78,000 MW Energy (average) MU/day Availability Peak power - 68,000 MW Energy (average) MU/day Shortage Peak power - 10,000 MW (12.8%) Energy MU/day (7.7%)

Power Scenario – at a Glance All figs. are in MW RegionPeakInstalled Peak DemandCapacity Surplus/Deficit Northern21,00027, ,100 Western25,00030,800- 4,500 Southern20,40024,800- 2,600 Eastern 7,80015, ,000 North-eastern 950 1, Limited exchange of power between Regions --- Main reasons: –Inadequate interconnectors, especially from Eastern Region –Lack of proper Commercial and administrative mechanisms

Need for National Grid Uneven disposition of energy resources  Major Hydro resources in NER & NR  Coal reserves mostly in Bihar/Orissa/West Bengal  Cost of power transmission (1.11 cents/kwh) lower than cost of fuel transportation (3.33 cents/kwh). Some Regions are no longer Self-sufficient  Major resources in SR exhausted  In NR, mainly hydro resources having long gestation period Unbalanced Growth of different Regions  Some regions are surplus and some are deficit. Optimisation of generation capacity addition  Utilising time diversity  Spinning reserve optimisation

Power Transfer Envisaged from ER and NER by 2012 Table

Development of National Grid – Major Considerations Development in a phased manner – commensurate with generation/ load growth Conservation of Right-of-Way - especially in areas with scarcity of ROW ---- viz. area near hydro, chicken-neck area, forest area, town etc.  In forest area with rich flora & fauna, construction of line with high towers ---- no forest cutting required. Minimisation of transmission cost - immediate as well as long-term basis. Flexible enough to accommodate change in load-generation pattern.

Plan for National Grid PHASE-I (By 2002):  Interconnection through HVDC Back-to-Back links- P North – West: 500MW Vindhyachal Back-to-Back Under P West – South: 1000MW Chandrapur Back-to-Back Opera- P East – South: 500MW Gazuwaka Back-to-Back tion P East – North: 500MW Sasaram Back-to-Back – expected by (AC line of this project in operation transferring 350 MW in radial mode) With the completion of Sasaram HVDC Back-to-back link, framework of National Grid would be completed. MAP

Plan for National Grid PHASE-II (By 2007): High capacity “Transmission highways” envisaged alongwith major generation projects - East-South  2000 MW HVDC bipole between Talcher-Kolar  Augmentation of Gazuwaka HVDC back-to-back by 500MW East – North  High capacity 400 kV link from Tala to Delhi  2500 MW HVDC bipole between Hirma – Jaipur East – West  400kV AC link between Rourkela and Raipur –2003  400kV AC link between Hirma and Raipur & Sipat MAP

Plan for National Grid PHASE-III (By 2012): Establishment of a ring of 765kV lines traversing across Northern, Western and Eastern Regions Construction of various sections of Ring progressively along with major generation projects viz. Barh, Kahalgaon, North Karanpura etc. Strengthening of East-South interconnection through another 2500MW bipole MAP

National Grid: Cost-benefit analysis Cost  Investment required  Rs. 23,000 crores Benefits  Reduction in capacity addition requirement by about MW--- hence saving on investment of Rs. 55,000 crore. (due to peak time diversity and saving in spinning reserve)  Transmission highway would enable setting up of large pit head stations having lower cost of energy  Savings on account of this - Rs crores per annum.  In addition, Nation’s investment towards fuel transportation infrastructure could be avoided.  Better overall hydro-thermal mix  Very low for ER and WR ( ER – 15 : 85, WR - 17 : 83 ) – affecting grid operation  With National Grid, it would become 33 : 67 on all India basis..

Major Challenges & their Redressal Mobilisation of Funds  Considerable investment required for creation of National Grid  Investment requirement in : Rs. 70,000 Cr Central transmission sector (including National Grid) by the year  Investment by POWERGRID : Rs. 39,000 Cr  Investment by Private Sector : Rs. 31,000 Cr  POWERGRID facilitating private sector participation in transmission sector through Joint Venture and Independent Private Transmission Companies (IPTCs) routes

Major Challenges & their Redressal...contd. Private Sector Participation Joint Venture Route –Project specific Shell company for obtaining statutory approvals to offer bankable projects to private sector –Transmission system identified  India portion for Tala Hydro Electric project (1020 MW) in Bhutan with an Estimated cost of Rs. 1,200 Cr –Proposed equity participation to the tune of 26% –NIT issued for Selection of JV partner through ICB IPTC Route –Selection of the promoter through two stages (RfQ & RfP) ICB based on Transmission Service Charges (TSC) –International consultant appointed under the technical assistance(TA) of ADB – Transmission licensee to establish the project under BOOT –A pilot project to be taken up shortly.

Major Challenges & their Redressal...contd. Realisation of Investment  Total Charges of SEBs due to POWERGRID is about 1385Cr. Including surcharge of 317cr. as on July  As National Grid is planned on long term basis, its utilisation in initial period will be less --- hence, transmission charges would be on higher side. SEBs may be reluctant to pay higher transmission charges.  Poor recovery can affect health of POWERGRID --- hence future development of transmission system. Perceived Solution: Special methodology need to be adopted for recovery of tr. charges of Transmission highways.

Major Challenges & their Redressal...contd Proper Load Despatch & Communication Facilities  POWERGRID is implementing ULDC schemes in all five regions with state-of-art- SCADA, EMS and dedicated Communication system at an investment of US $468 million. Schemes for NR & SR under implementatin, expected by Jun’2002.  Establishment of National Load Despatch Centre (NLDC) by interconnecting all the regions. Integrated Grid Operation  Strict adherence to grid discipline to maintenance of voltage and frequency.  Operation of generating units in free governor mode.  Implementation of “Availability Tariff” having provision of penalties and incentives to encourage grid discipline.

 Comprises of: Capacity charge Energy charge Unscheduled interchange charge  Dependent on Actual Plant Availability & generation / drawal  No provision regarding deemed generation  No year-end commercial adjustments  Perpetual incentive for maximizing generation & reducing drawal during deficit, but no incentive to over generate during surplus Availability based Tariff

 Defines responsibilities between Utilities, RLDCs and REBs  Defines scheduling mechanism for day ahead scheduling of Generation and Drawal  Specified frequency bands for operation of regional grids  Frequency stabilization through free governor mode of generating units  Defines charge for Reactive Energy drawal Indian Electricity Grid Code

Eastern Region – Power Scenario  Effective Installed Capacity: 15,958 MW  Demand  Peak : 7800 MW (persists for 3-4 hrs a day).  Off-peak : 4500 MW (persists for 20 hrs a day).  Surplus Available -  In peak hours : 2000 MW  Extent of max. surplus : 3500 MW Additional surplus power would be available with injection of power from Ranganadi HEP (405MW – expected by March 2002).

Eastern Region – Power Scenario.. contd.  Surplus Available with 68% average PLF -  In peak hours : 4500 MW  Extent of max. surplus : 6000 MW  At the end of X - Plan -  Likely increase in Installed Capacity: 6500 MW  Likely increase in Load: 2500 MW  Likely increase in Surplus power: 3000 MW Therefore, the surplus scenario is likely to continue in future also.

Reasons for Surplus Power  Poor load growth - 5% as compared to national average of 9% due to -  Non-completion of state sector transmission scheme approved long back.  Inadequate sub-transmission & distribution facilities.  Overall slow economic growth of the Region.  Adequate Inter- regional transmission links were not planned – as power was to be consumed in ER only.

On-Going Schemes LinkCapacity (MW)Expected comm. ER to NR Sasaram HVDC B-t-B (AC line is being utilised for transfer of 300MW, with HVDC 500MW would be transferred on regular basis) 500Dec, 2002 ER to WR Rourkela – Raipur 400kV D/c (Award placed) 700Dec, 2002

Additional Links - Proposal Feasible Capacity to evacuate Surplus Power (MW) Estimated Cost (Rs. in Crs.) I.Tala-Delhi Transmission System2000 II.Gazuwaka – II ; augmentation by 500MW block III.Series Capacitor on Raipur – Rourkela 400kV D/c Raipur-Chandrapur 400 kV D/c IV.Sasaram – II ; augmentation by 500MW block V.Ib Valley – Jaipur HVDC Bipole of Hirma Tr. system VI.Meramundali – Hosur 2000MW HVDC bipole Total800010,200

Back

Demand-Availability Scenario – by Assumptions: Demand – as per 16 th Electric Power Survey Report (EPS). Capacity addition – as per information available from MoP & CEA. Generation availability (average) – 75%. All figs. are in MW Region Demand Installed Availability Deficit/ Capacity Surplus Northern Western Southern Eastern+ North-east

`````````` Sl. NO. Tariff Parameter Norms as per GOI Notification (Existing Norms) Norms Recommended by CERC Fin. Impact ( ) Rs. Crs. 1.ROE16% - 2.DEPT/L-5.27%, S/s-7.84%, PLCC %, BLDG-3.02% T/L-2.57%, S/s-3.6%(-) O&M1.5% for plain and 2% for hilly terrain On the basis of actual O&M in last 5 years (-) FERVAs per actual. To be billed annuallyTo be capitalized and charged in tariff. FERV on interest also allowed. (-) Treatment of Corporate Tax Grossing up of income-tax permitted Tax recovery on actual basis, to be calculated in advance and billed on monthly basis. (-) Normative availability & incentive 95% for recovery of full transmission charges 1% increase on ROE for each % point of increase in availability beyond 95% 98% for recovery of full transmission charges. (-)59.81