Prioritizing Booster Pump Station Improvements Tom Peters, P.E. May 2, 2008.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Practical Preparations Planning for Safety and Emergencies.
Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Resources Marketing SERVICE CENTERS FACILITIES MASTER PLANNING INITIATIVE Bernie O’Donnell, Director Utility.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
Topics To Be Covered Original assumptions about developing models with HAZUS Tulsa Pilot Study & Community Studies –What worked –What did not work Unexpected.
Cowlitz-Lewis Economic Development District th Avenue North, Adm. Annex, Kelso, WA Ph: ; FAX:
Hazard and Vulnerability Assessment
Critical Infrastructure Protection and Higher Education: University of California Hazard Vulnerability Assessment Kristine Hafner University of California.
Sustainment Management Systems
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
1. Session structure Overview Example definition Actions Example output Challenges Exercises Module 3 Identify hazards and assess risks 2.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
US Army Corps of Engineers BUILDING STRONG ® Consequence Assessment for Dam Failure Simulations Kurt Buchanan, CFM Economist Mapping, Modeling, and Consequences.
Implementing HAZUS-MH in Pre-Disaster Mitigation
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Isograph Reliability Software RiskVu V3. Isograph Reliability Software ESSM – The first risk monitor ? Essential Systems Status Monitor Installed at Heysham.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Lecture 32 Risk Management (Cont’d)
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
1 Emergency Management and Risk Analysis for Hazardous Materials Transport Shashi Nambisan Professor of Civil Engineering Dept of Civil & Environmental.
Goals & Objectives Objectives: Understand probable effects of natural and anthropogenic hazards Identify reliability & resilience projects Understand benefit-cost.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
US Army Corps of Engineers BUILDING STRONG ® Texoma and Missouri Region JETS Training Symposium Resiliency Planning Through Hazard Vulnerability Analysis.
Marion County Utilities
Jonathan McCoy Regional Property Underwriting Manager Zurich Energy Supply chain insurance and risk assessment Protecting profitability.
Risk management and disaster preparedness
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
1 Public Hearing User Rate Adjustments April 8, 2008.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
NC AWWA-WEA 95th Annual Conference
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Maximizing the Facility Hazard Vulnerability Assessment
Risk Assessment What is good about the Microsoft approach to threat modeling? What is bad about it? OCTAVE…  Advantage: ___________  Disadvantage: ___________.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
1 Managing Distribution System Reliability at Southern California Edison Robert Tucker Thach “Nicholas” Duong Roger Lee OIR R Workshop May 26.
Janice Rahman Program Manager Metropolitan King County Council Law, Justice, Health and Human Services Committee May 14 th, 2013 HAZARD MITIGATION A Regional.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Water System Seismic Study and Emergency Response Planning
Getting Prepared: Policy Implications for Transportation Planning
Assessing the Resilience of Water Supply Systems in Oman
Fort Stanwix National Monument Energy Audit Contract
Risk Assessment.
Scoring the Technical Evaluation Maximum possible score
Infrastructure and Financial Strategies
North Area consolidation project
Water Resources Plan 2040 Update
MERRICK & COMPANY CHARLOTTE WATER INSTITUTE
Our Valuable Water Infrastructure – Challenges of the 21st Century
Transmission Planning in a Modern Market Environment
Pacific Power Seismic Preparedness Update
Building the BEST Structure Challenge
Factors to Consider when Designing a Reliable Power Grid
Group B – ranking criteria and prioritization
Factors to Consider when Designing a Reliable Power Grid
Operationalization of a Public Works AM Strategy
Southwest Section AWWA 2018 – Baton Rouge, LA
BHOPAL Industrial Disaster Management Cycle: OECD 2004.
Capital Asset Management
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE east range communities REQUEST A $6 million request for State Funding in 2019 to build a comprehensive.
Presentation transcript:

Prioritizing Booster Pump Station Improvements Tom Peters, P.E. May 2, 2008

City of Bellevue WBPS Evaluation Overview ▼ Owns and operates 23 major water booster pump stations ▼ Pumped water service for over 60% of customers ▼ First overall technical evaluation of all pumping facilities and equipment

City of Bellevue WBPS Evaluation Project Goals ▼ Efficient distribution of maintenance dollars  Identify facilities whose failure significantly impacts system reliability  Rank WBPS in order of needed improvement  Develop costs to upgrade and Improve WBPS reliability  Asset management “building block ”

City of Bellevue WBPS Evaluation History ▼ Grown from merger and assumption of old water districts ▼ Some facilities developer constructed ▼ Historically wholesale water purchase from City of Seattle ▼ Member of Cascade Water Alliance

City of Bellevue WBPS Evaluation Project Challenges ▼ Multiple pump types ▼ Varying levels of building quality ▼ Below grade vaults ▼ Inefficient location of emergency power ▼ Absence of re- chlorination facilities

City of Bellevue WBPS Evaluation Project Challenges

Pump Station Information and Data ▼ Thorough review of as-builts, maintenance records, water production and previous studies ▼ Analysis of peak and average day consumption, by pump station and operating zone. ▼ Rigorous assessment of each pump station condition, with video taped operator interview ▼ Development of 10 system schematics summarizing basic system information

Ranking Pump Stations Ranking WBPS Needs PairedComparison Normal Operation PairedComparison Emergency Operation

Ranking Evaluation Criteria

Pump Station Score Card

Normal Operating Ranking

Ranking Pump Stations Ranking WBPS Needs PairedComparison Normal Operation PairedComparison Emergency Operation

City of Bellevue WBPS Evaluation Risk Based Assessment ▼ Risk = Hazard Probability X Vulnerability X Consequence ▼ Hazards impacting multiple facilities pose the greatest risk l Regional power outage l Earthquake l Flooding ▼ Redundancy, properly placed, provides effective mitigation

Sample Risk Ranking

Emergency Operating Scenario

Combined Rankings

SUMMARY ▼ WBPS assessed: 23 ▼ WBPS requiring improvements: 21 ▼ Total cost all improvements: 21.4 M ▼ Average cost of replacement (5): 2.9 M ▼ Average cost of improvements (16): 0.43 M