Presentation is loading. Please wait.

Presentation is loading. Please wait.

NC AWWA-WEA 95th Annual Conference

Similar presentations


Presentation on theme: "NC AWWA-WEA 95th Annual Conference"— Presentation transcript:

1 NC AWWA-WEA 95th Annual Conference
Integrating Asset Management into Winston-Salem’s Wastewater System Master Plan CIP Kevin T. Laptos, Black & Veatch

2 Acknowledgement Co-Authors Courtney Driver, City of Winston-Salem
Jeff Stillman, Black & Veatch Katy Weidner, Black & Veatch Kent Lackey, Black & Veatch

3 Agenda Evolution of System Planning
Traditional Planning Processes Asset Management Approach Case Study – 2015 Winston-Salem Wastewater System Master Plan System Overview Asset Management Elements and Recommendations CIP Summary and Budgeting

4 Evolution of system planning

5 Traditional Master Planning Process (Capacity)
Recommended Capital Improvements Alternatives Analysis Capacity Analysis Model Update and Calibration Regulatory Drivers Population Projections & Growth 5, 10, 20 Year Capital Planning Update Cycle Typical Planning Processes

6 Annual Operations Budget Update Cycle
Current Asset Management Process (Condition & criticality) Recommended Capital Improvements Business Risk Exposure and Prioritization Consequence of Failure Likelihood of Failure Condition & Performance Assessment Annual Operations Budget Update Cycle Typical Planning Processes

7 Water and Sewer Utilities – Traditional Organization challenges
Operations Engineering Silos lead to system planning pitfalls

8 Traditional Sewer sizing Pitfall
Selecting a replacement (or new) sewer size without considering future flows due to system growth and/or I/I reduction

9 Asset Management approach to system planning
Provides a comprehensive and coordinated Master Plan CIP

10 Budget Master Planning Process Capacity Planning
Population Projections & Growth Regulatory Drivers Model Update and Calibration Capacity Analysis Alternatives Analysis Recommended Capital Improvements Capacity Planning System Planning Review & Update 15 Year CIP 5 Year CIP Projects for Budget Reconcile Projects Proposed Budget Rate Modeling Budget Asset Management Process Condition Assessments Update SAMS Spreadsheets Prioritize Potential Projects Confirm Project Rankings Finalize Planned Improvements Operational Planning

11 Case Study: 2015 Winston Salem Wastewater Master plan

12 Winston-Salem/Forsyth County Utilities Commission – System Overview
Over 90,000 Sewer Customers 1,724 miles of Sewers 49 Lift Stations 36 MGD treated daily 3 primary sewer basins CASE STUDY: Winston-Salem

13 Winston-Salem MP – Asset Management Elements
Organization Assessments: PAS 55 CMOM Facility Assessments: Condition & Criticality Scoring Asset Group Life Cycle Analysis Pipeline Assessments Desktop analysis By sub-basin

14 PAS55 – Checklist for Good Asset Management Practice
Similar to ISO Standards and Guidance

15 PAS 55 Asset Management Maturity Scoring

16 Pas55 Gap Analysis Results
Strengths: Contingency Planning; Communication, Participation, and Consultation; Legal; Tools, Facilities, and Equipment; Compliance Evaluation Improvement Focus Areas: Asset Management System; Risk Management; Life Cycle Activities

17 CMOM Evaluation High Priority Recommendations:
Capacity Management: prevent SSOs through proactive cleaning and focused preventative maintenance. SSO response: Record rainfall data to track wet weather SSOs Customer Service: Track information on the status of SSO serve requests Low Priority Recommendations: Capital Planning: Do a better job of coordinating project planning between the C&M and Capital planning departments C&M: Develop a post-SSO water quality management plan FOG program: Identify major contributors and budget for education On-track with previous (2012) recommendations resulting in a drop in SSOs/100 miles from 16 in to just 7 in

18 Facility assessments Lift Station Inspections Hydraulic Capacity
Condition and Criticality Risk-Based Prioritization Life Cycle/O&M Improvements

19 Lift Station Inspections
Condition and Criticality Ratings by Asset Group: I&C Electrical Structural Mechanical Pumps Pipes Valves Auxiliary Equipment: Generator

20 Risk-based prioritization
Developed from Inspection Condition and Criticality Ratings

21 Pipeline assessments Condition Scoring Criteria
Criticality Scoring Criteria (Consequence of Failure)

22 Pipeline Prioritization by Sub-basin

23 Winston-Salem Asset management Recommendations & cip budget planning

24 Ramping up on Asset Management activities

25 CIP Budget planning – Collection System Rehabilitation and Replacement (R&R)
“firm 75-Year” pipeline service Life In the second graph the high magnitude of spending from is spreadout over the entire next decade. Useful life of 75 years (only) “Condition managed” Pipeline service Life

26 CIP Budget planning – Collection System capacity and R&R

27 MANAGING THE CIP AND BUDGET FORECASTS USING iCIP
Add, remove, or update projects via an interface with GIS Update project phasing based on system performance triggers Update and refine projects stemming from on-going R&R program Provides dynamic CIP budget forecasting and reporting Immediately shows results of decisions A customized technical approach for project success

28 NC AWWA-WEA 95th Annual Conference
Questions or comments? Kevin T. Laptos, Black & Veatch


Download ppt "NC AWWA-WEA 95th Annual Conference"

Similar presentations


Ads by Google