Title Your Name University Name Date Instructor Name.

Slides:



Advertisements
Similar presentations
Maipu ° “A” Ciudad Autónoma de Buenos Aires C1006ACF – Argentina Tel. (54 011) TWSYS.NET Integral Advice in.
Advertisements

Flexible Manufacturing Systems (FMS)
EBSCO’s Ten Minute Training Series EBSCO’s New One-Step RSS Feed Alerts, plus Search and Journal Alerts Search and Journal Alerts by Marcie Brown, EBSCO.
Project Perfect Pty Ltd Project Administrator Overview of Software.
T-FLEX DOCs PLM, Document and Workflow Management.
Barracuda Backup Service Data Backup and Disaster Recovery.
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
SYSchange for z/OS By Pristine Software April 2009 Thomas Phillips April 2009 SYSchange Pristine Software.
An Object-Oriented Architecture Supporting Web Application Testing Presented By: Bhavdeep Singh.
Phase Difference = Phase Difference = 0.05.
CS 290C: Formal Models for Web Software Lecture 6: Model Driven Development for Web Software with WebML Instructor: Tevfik Bultan.
Insert the title of your presentation here Presented by Name Here Job Title - Date The Forever Open Road Presented for FEHRL by Bob Collis, November 2009.
NATIONAL BANK OF ROMANIA NATIONAL BANK OFROMANIA NATIONAL BANK OF ROMANIA.
EAIESB Software Solutions – Oracle Fusion - eScheduler.
CRITICAL PATH DEFINITION.  ALL the tasks that determine the end date in your project schedule.  The critical path is the longest PATH, through the “AON”
CSC271 Database Systems Lecture # 20.
Empowering your maintenance team with field Inspection Solutions Wilhelm Herbst Optron Technology Solutions.
Benefits of a Hosted Help Desk Solution Kathryn Thomas Customer Care Manager Gus Hytonen Senior Account Manager
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Overview of the Database Development Process
The GNM-DMS a Document Management System for the Germanische Nationalmuseum Martin Doerr, ICS-Forth Siegfried Krause, GNM April 2004.
Data Warehousing for the Reporting and Management of Clinical Data Robert Ellison, ICON CLINICAL Research Plc.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 CASE Computer-aided software engineering Excerpted from Ian Sommerville’s.
InGenius Connector Enterprise: CTI for Dynamics CRM March 2013.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Large-Scale Enterprise GIS Systems.
1.  This application consists of all the information of students, employees and their related tasks.  Every module of this software is included to provide.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
Automated (meta)data collection – problems and solutions Grete Christina Lingjærde and Andora Sjøgren USIT, University of Oslo.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
ANKITHA CHOWDARY GARAPATI
Software Production Chapter 2: Identifying Software Development Activities.
TruSelling Methodology. Overview What is the Buy Sell Process Buyers Process Sellers Process Controlling the sales Call 30 Second Speech Second Call and.
PANTHEON Farming SALES EDUCATION BASIC Lecturer: Barbara Bračič Borovnik Program version: Ljubljana,
Travel and Accommodation Self Booking Tender 22 October 2015.
Marchetta Atkins, Mathematics Instructor Alcorn State University Alcorn State, Mississippi College Algebra 16 sections Fall Semester Sections/Number.
Creating Databases Data normalization. Integrity and Robustness. Work session. Homework: Prepare short presentation on enhancement projects. Continue working.
CIM LAB MEETING Presentation on UML Rakesh Mopidevi Kwangyeol Ryu.
ISaral EIMS (Education Institute Management Software) iSaral EIMS is a windows based application, developed for smooth handling of administration of education.
1 Customer Testimonial for TestShell Standards of Excellence Tomas Chen Project Manager.
Benefits. Re-engineering the system Cost benefit analysis of the current IT system The organisation can compare the cost of updating the system with the.
Presented by : Bimlesh Arun Shailesh Prajapati Sneha B. Hulkoti.
This Certifies that _______________________ Has won 1 st Place in and has successfully completed our 9 week weight loss challenge Proudly given this _____.
Vehicular Networking and Traffic Congestion System Using GPS
ITC Software ITC AUTOMATION TESTING SERVICES Date (Day Month, Year) Place (City, Country)
22 Nov'08Slide 1 Concadd 2D Draughting-Detailing Concadd (A decade of innovation)‏
Computerized Accounting Systems HOLLY STEVENS. Background On CAS Systems that are used in businesses to help properly and accurately maintain financial.
Types Of Enterprise Mobility Needed By Different Business Verticals.
Internet of Things. Creating Our Future Together.
 STARTAPRO Global System Integrators Company Profile.
- Company Confidential - Corporate Overview March 2015.
TabWare – Equipment Maintenance Software Equipment Maintenance Software
BIT 286: Web Applications Automated Web Testing. Selenium  Selenium Is moving from being Firefox based to being more of a 'normal desktop' program that.
Industrial HiVision Network Management Software Version 7.0
Mastering Version Control with Git
2016 Maintenance Innovation Challenge
Everything you need to run a small law firm!
CORPORATE DEVICE MANAGEMENT
2016 Maintenance Innovation Challenge
Maintenance module Martin Heigl CTO
Elements of Database System
פחת ורווח הון סוגיות מיוחדות תהילה ששון עו"ד (רו"ח) ספטמבר 2015
AAR FORMAT TASK:___________________________________________ DATE:_________ PRIMARY INSTRUCTOR: _______________________ ALTERNATE INSTRUCTOR:_____________________.
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
BIC 10503: COMPUTER ARCHITECTURE
Relations, Domain and Range
© Infogroup Data Solutions Slide Title © Infogroup Data Solutions.
Speaker name Title Title
Speaker name Title Title
Presentation transcript:

Title Your Name University Name Date Instructor Name

Generative software development “A development that permits products to be produced automatically through different specifications”.

Development phases 1 st phase- development of software mechanism. 2 nd phase- production of individual’s product.

Normal software developing process Consist of different models that have a particular set of task that have to be set forth during a certain point during the process. Happens over a series of activities that depends on the developing model.

benefits of generative software development  Allows for automation software development.  Reduces downtime.  Simples maintenance.  Coverts everything to automated system.

Domain Specific Modeling  Identify the solution  Illustration-using critical thinking  Relating the problem to the domain.

Challenges in generative software development  All systems can be integrated.  Delay in automation or downtime.  Problem with saving old data.  Loss of data during transfer.

Thank you