Celebrating the Tevatron: The Machine(s) Steve Holmes DPF2011 August 13, 2011.

Slides:



Advertisements
Similar presentations
Closing Comments Nigel Glover, IPPP LHC Startup, Coseners House, 13 April 2007.
Advertisements

1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
 Particle accelerators Particle accelerators are divided into two by the way they were built: 1-)Linear 2-)Circular.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
The Tevatron Collider: A Thirty Year Campaign Fermilab Colloquium March 10, 2010 John Peoples 1.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
11 Overview of the Tevatron Collider V.S. Morozov Old Dominion University Muons, Inc. Collider Review Retreat, Jefferson Lab, February 24, 2010.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
Director’s Review 5/5/03 Spalding1 The Run II Upgrade Program Director’s Review May 2003 Program of upgrade projects in MI-Accumulator-Tevatron and the.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Future Accelerators at the High Energy Frontier
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
December 5, Chuck Ankenbrandt Fermilab Muon Collider Design Project X as a Hi-Rep-Rate Driver for a Muon Collider Chuck Ankenbrandt.
Luminosity expectations for the first years of CLIC operation CTC MJ.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
June 15, 2002David Finley to Aspen PAC Slide 1 Report on 132 nsec Operation Report to the Fermilab.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
Fermilab Run 2 Accelerator Status and Upgrades
Interactions Kihyeon Cho September 6, People have long asked, What is world made of? and What holds it together?
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
F. Willeke, Snowmass Luminosity Limitations of e-p Colliders Extrapolation from HERA Experience Examples for IR Layout LINAC-Ring Limitations HERA.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
Considerations on RF systems of SPPC collider and its injector chain
Lecture 2 Live Feed – CERN Control Centre
Introduction to Jefferson Lab
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 6th May 2009 Fergus Wilson, RAL.
LHC upadtes.
LHC Beam Operations Past, Present and Future
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
SLHC-PP kick-off meeting, CERN 9 April 2008
MEIC New Baseline: Part 10
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
LHC Machine Advisory Committee, CERN 12th June 2008
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Celebrating the Tevatron: The Machine(s) Steve Holmes DPF2011 August 13, 2011

The Vision( ) 1972  400 GeV Main Ring operational  Bob Wilson: Tunnel/service buildings accommodate a superconducting accelerator at 2x the energy ~1976  SC magnet program initiated  Rubbia, Cline, McIntyre propose proton-antiproton collider at CERN or Fermilab  1E29 luminosity deemed sufficient for W, Z  Supported by 1E11 antiprotons/day DPF2011, S. Holmes 2

Conceiving the Tevatron Collider Armistice Day Shootout (Nov. 11, 1978) Lederman established Fermilab priorities for the future:  Top priority is completion of the Energy Saver/Doubler  Antiproton-proton colliding beams will be in the Doubler.  Accelerator Division responsible for developing design and associated technologies for an antiproton source. DPF2011, S. Holmes 3  Quick and dirty colliding beam schemes suspended

Building the Tevatron Collider June 1981: Director’s Review of Tev I The Committee (Tigner):  “The design appears to be adequate to meet the goals for Pbar production and accumulation listed in the design report. However those goals are too modest. “  “We recommend that the Laboratory re-examine the goals and develop a feasibility design commensurate with the full potential of the Main Ring-Booster combination to produce pbars.” Lederman directed John Peoples:  Develop an alternate design which rests on the considerations of technical feasibility (& not cost).  Provide a progress report in 40 days. DPF2011, S. Holmes 4

Antiprotons DPF2011, S. Holmes 5

Completing the Construction ( ) July 1979  Tevatron construction authorized July 1982  CDF and Antiproton Source authorized July 1983  First accelerated beam 512 GeV 1984  D0 approved by DOE October 1985  First western hemisphere antiproton-proton collisions DPF2011, S. Holmes 6

Collider Construction DPF2011, S. Holmes 7 December 1983 December 1982

October 13, 1985 DPF2011, S. Holmes 8 Estimated Luminosity: 2×10 25 cm -2 sec -1

Meeting the Goals: Run Tev I Design Actual Energy1800 GeV Protons/bunch6× ×10 10 Antiprotons/bunch6× ×10 10 Bunches36 Luminosity1× ×10 30 cm -2 sec -1 DPF2011, S. Holmes 9 Delivered Luminosity (CDF): 5 pb -1 (0.005 fb -1 )

Establishing the Future Strategy ( ) DPF2011, S. Holmes 10 Number of protons per bunch Number of antiprotons (total) Beam emittance Strategy for moving beyond 1×10 30 based on: Brighter proton beams More antiprotons

Strategy for the Future: Run I By run a strategy was already in place for upgrading the Tevatron to 1×10 31 cm -2 sec -1 Helical orbits  Eliminate all collisions outside of B0 and D0  Twenty electrostatic separators: 250 kV/5 cm  Result: Beam-beam was not a limitation for the duration of Tevatron history New low-  systems (B0 and D0)  Matched  * w/ ×1/2 reduction 400 MeV linac upgrade  More protons to pbar target  Increase proton beam brightness DPF2011, S. Holmes 11

Strategy for the Future: Run I Antiproton Source improvements  Debuncher transverse cooling  Improved cooling system bandwidths Cryogenic Cold Compressors  Lower operating temperature by 0.5 K  “Tevatron” And we were already starting to think about Run II… DPF2011, S. Holmes 12

DPF2011, S. Holmes Page 13 TM-1491 Strategy for the Future: Run II

DPF2011, S. Holmes 14 Main Injector Recycler Run II (initial) Goal: 5×10 31 cm -2 sec -1

Achieving Full Potential ( ): Main Injector Summer 1993: Main Injector DPF2011, S. Holmes Page 15

Achieving Full Potential ( ): Recycler DPF2011, S. Holmes Page 16 Run II (modified) Goal: 8×10 31 cm -2 sec -1

June 1999 DPF2011, S. Holmes Page 17

Run II (June 2001 – September 2011) Run II “Campaign” in response to initial difficulties  Many modest problems overcome Several major innovations  Electron cooling of antiprotons (in the Recycler)  Slip-stacking  Tevatron electron lens DPF2011, S. Holmes 18

DPF2011, S. Holmes Page 19

Electron Cooling DPF2011, S. Holmes Page 20

Run I and II Tev I Design Run IRun II Energy GeV Protons/bunch6× × ×10 10 Antiprotons/bunch6× × ×10 10 Bunches3636 Luminosity1× × ×10 30 cm -2 sec -1 DPF2011, S. Holmes 21 Delivered Luminosity (CDF/D0 average) Run I: 0.18 fb -1 Run II:12.0 fb -1

Appreciating the Tevatron DPF2011, S. Holmes 22 Tevatron Initial Goal Main Injector + Recycler When we started we measured success in nb -1 By the mid-90’s we measured success in pb -1 At the end we measured success in fb -1

Appreciating the Tevatron Ultimate performance exceeded initial goal x400  35% average annual growth over 20 years  Far outperforming the stock market! October 4, 2005  Tevatron surpassed ISR as highest luminosity hadron collider ever: 1.4×10 32 cm -2 sec -1 April 22, 2011  LHC surpassed the Tevatron as highest luminosity hadron collider: 4.7×10 32 cm -2 sec -1 The Tevatron remains the highest luminosity proton-antiproton collider ever 4.3×10 32 cm -2 sec -1 In the It’s success made possible HERA, RHIC, LHC DPF2011, S. Holmes 23

Thousands of people made this happen. Among the one’s I especially remember: Wilson, Lederman, Peoples, Witherell, Oddone Orr, Edwards (x2), Collins, Lundy, Tollestrup Malamud, Limon, Turkot, Mantsch, Flora, Tool, Rode, Johnson (xn), Ankenbrandt, Mau, Marriner, Dugan, Harrison, Martin, Bogert, Fowler, Pawlak, Nestander (x2), Bharadwaj, Pewitt, Harding, Nagaitsev, Wolf, Krafczyk, Lackey (x2), Hojvat, McCarthy, Griffin, Mills, Ruggierro, Finley, Ducar, Casebolt, Theilacker, Reid, Kerns(x2), McGinnis, Pasquinelli, Church, Mishra, Foster, Jackson, Pellico, Johnstone (x2), Gollwitzer, Moore (x2), Kourbanis, Dixon, Czarapata, Shiltsev, Chemiakine, Lebedev… DPF2011, S. Holmes 24