CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 1 Summary Status of Indian Contributions to CTF 3 Project * *Presented by Purushottam Shrivastava On.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Raja Ramanna Centre for Advanced Technology
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
RF Cavity / Coupling Coil Module
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
30 GHz waveguide line modification towards 12 GHz.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Collaboration with Normal Conducting Magnet section
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
WLCG and the India-CERN Collaboration David Collados CERN - Information technology 27 February 2014.
The Stripping Foil Test Stand in the Linac4 Transfer Line
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
SBS Magnet and Support Status Robin Wines June 2013.
TBTS Test Program & Schedule G. Riddone
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
STATUS REPORT ON VACUUM CHAMBERS (Dipole & Straight) & DIPOLE MAGNETS FOR TL-2 OF CTF3 A.K. JAIN, S.S. PRABHU, S. KOTAIAH RRCAT, INDORE (INDIA)
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Manoj Kumar, B. N. Duttagupta, Rajvir Singh Doohan, S. K. Joshi, A. K. Sagar, L. Chowdhary, Rekhya Naika, Prabhat Kumar Gupta, Vivek Nema, Hemant Kumar.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
650 MHz Solid State RF Power development at RRCAT
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
ELENA installation progress F. Butin / ELENA collaboration.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Design of Transfer Line-2 (TL-2) for CLIC Test Facility – 3 (CTF-3) Amalendu Sharma, A.Rahim, A.D.Ghodke and Gurnam Singh IOAPDD Raja Ramanna Centre for.
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
Raja Ramanna Centre for Advanced Technology, Indore
Status of HESR 18th March Gießen Dieter Prasuhn.
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
ELENA installation and commissioning status
Options and Recommendations for TL and Dumps
CLEX* Status and Plans CTF3 complex CLEX
ELENA Beam Transfer Workpackage
CTF3 – TL 2 VACUUM CHAMBER FABRICATION STATUS REPORT Jan 22, 2008
ELENA electron cooler and SEM grids status
Status of the VEPP-2000 Collider Project at Novosibirsk
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
IHEP Cryomodule Status
A Cold SCU Phase-Shifter
Experimental equipment Edgar L. Black February 17, 2019
Two-beam Test-stand Design and Construction Status
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 1 Summary Status of Indian Contributions to CTF 3 Project * *Presented by Purushottam Shrivastava On behalf of RRCAT Team Team Members: A.K. Jain, S.S. Prabhu, S.D.Sharma, V. Bhatnagar, Amalendu Sharma, Gurnam Singh, B.S.K.Srivastava, V. Pharkiya #, Purushottam Shrivastava and V.C. Sahni Raja Ramanna Centre for Advanced Technology Indore , India

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 2 AddendumDetails of the contributionQuantityStatus CTF3/M.1Expert support for commissioning of control systems for CTF3 5 Man monthsCompleted CTF3/M.2 Expert support for commissioning and operation of control systems for CTF3 18 Man monthsIn progress CTF3/B.1Short and long dipole magnets for TL2 2 Long (30.75°), 3 Short(17.2°) One short magnet shipped, two short magnets ready, long magnet cores ready CTF3/V.1Dipole vacuum chambers, straight vacuum chamber (Race track and circular profiles) 5 dipole, 31 Cylindrical, 22 Race track, 03 Cylindrical bent chambers In progress CTF3/T.1Optics design studies, simulations, analysis and results of the transfer line TL 2 of CTF 3 18 Man monthsCompleted

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 3 Application software developed by Indian experts for CTF 3 controls (ADD CTF3/M.1)  Magnet Degaussing Automatically degausses the magnets.  Combiner Ring Beam Orbit Display Graphically displays the multi turn beam orbits in combiner ring.  R. F. Pulse Shifter Shifts the pulse delays of R. F. devices.  Interlock Display Displays the detailed interlocks’ status of CTF3 Controls System. B.S.K. Srivastava

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 4 Screenshot*: Combiner Ring Beam Orbit Display *In simulation mode

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 5 STATUS OF FABRICATION OF CTF-3 VACUUM CHAMBERS SrDescriptionMachiningChemical Cleaning WeldingLeak testUltimate vacuum test 01Dipole chamber RT 53 Completed Complete 02Dipole chamber RT 63 Completed Complete 03Dipole chamber RT 16 Completed Complete 04Dipole chamber RT 43 Completed In progress 05Dipole chamber RT 73 Completed 06Cylindrical chambers (31 Nos.) Completed Completed8 nos. completed. Second lot in progress 07Race track chambers(22 Nos.) Completed * 18 nos. Completed 18 nos. Completed First lot assembly started. 08Cylindrical bent chambers (03 Nos.) work in progress

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 6 Prototype Dipole vacuum chamber Race track chamber parts Circular chamber parts Assembly of vacuum chambers

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 7 Dipole Magnet Fabrication Status as on 15 th Jan 2008 Stages of FabricationS-1S-2S-3L-1L-2 Machining work 2 blocksCompleteCompletedComplete Assembly of CoreCompleteCompletedComplete Coil winding 8 pan cakesComplete Winding Started Coil Potting 4 double pan cakes Complete Magnet Assembly workCompleted dt 29 Nov 07 Completed on 4 th Jan 2008 Complete d on 11 th Jan 2008 Magnetic measurementsComplete Painting workCompleteComplete except finish coat Packing in BoxCompleted 18 th Dec 07(shipped)

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 8 Stages of fabrication and packing for shipment for first dipole magnet at RRCAT Dipole magnet core fabrication and assemblyDipole magnet complete

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 9 Short dipole magnets Long dipole magnets

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 10 Layout of CLIC TEST FACILITY3 (CTF3) at CERN RRCAT is contributing in the Optics Design & Fabrication dipole magnets and vacuum chambers of TL2 for CTF3. Following two talks will give details of these contributions Amalendu Sharma : TL2 Optics Design S.S. Prabhu : Dipole Magnets and Vacuum Chambers for TL2

CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 11 Thank you.