Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
DCal Meeting
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
M. Gilchriese ATLAS Upgrade Introduction January 2008.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
First CMS Results with LHC Beam
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
M. Gilchriese - September 2000 Pixel Insertable Layouts September 2000.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Jim Fast Pacific Northwest National Laboratory
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
MICE CM31 Schedule summary
LHCC referees’ questions, comments, requests
for the transition region on behalf of the RPC upgrade group
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Francesco Forti University and INFN, Pisa
Overview and plans of the ITK Layout Task Force
HERD Tracker Layout Considerations
RPC and LST at High Luminosity
SLHC Non-Inner Detector Upgrades
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Presentation transcript:

Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.

Milestones  End CE works: December 2010  Installation: 2011  Linac commissioning: 2012  Modifications PSB: shut-down 2012/13 (6 months)  Beam from PSB: 1rst of May 2013 LHCC – 1 July, /12/20082 David Lissauer, Santa Cruz Meeting.

Construction of LP-SPL and PS2 will not interfere with the regular operation of Linac4 + PSB for physics. Similarly, beam commissioning of LP-SPL and PS2 will take place without interference with physics. Milestones  Project proposal: June 2011  Project start: January 2012  LP-SPL commissioning: mid-2015  PS2 commissioning:mid-2016  SPS commissioning: May 2017  Beam for physics: July LHCC – 1 July, /12/20083David Lissuaer, Santa Cruz Meeting.

Normal RampNo phase II Year Peak Lumi (x ) Annual Integrated (fb -1 ) Total Integrated (fb -1 ) Peak Lumi (x ) Annual Integrated (fb -1 ) Total Integrated (fb -1 ) Collimation Linac4 + IR upgrade phase 1 New injectors + IR upgrade phase 2 Radiation damage limit ??? 8/12/2008 4David Lissuaer, Santa Cruz Meeting. Note: Predicted integrated Luminosity Lower than assumed.

Collimation phase 2 Linac4 + IR upgrade phase 1 New injectors + IR upgrade phase 2 Early operation 8/12/2008 5David Lissuaer, Santa Cruz Meeting.

Collimation phase 2 Linac4 + IR upgrade phase 1 New injectors + IR upgrade phase 2 Early operation 8/12/2008 6David Lissuaer, Santa Cruz Meeting.

8/12/2008 7David Lissuaer, Santa Cruz Meeting. Layout (4+3+2) Fixed Length Barrel 4 Pixel Layers: 1(2) b-layers “easily replaceable” inside a support tube. 3(2) Layers incorporated in the Fixed length Barrel. Mechanical Support: Off the tube? Off the Barrel 3 Pixel Discs on the outside. Internal Discs?

8/12/2008 8David Lissuaer, Santa Cruz Meeting. Layout Overview Barrel Length: 240 Cm (Full length) 12 sensors/side. Discs: 5 Discs / Side. Need optimization.

8/12/2008 9David Lissuaer, Santa Cruz Meeting. Layout Overview (4+3+2) Fixed Length.

8/12/200810David Lissuaer, Santa Cruz Meeting. Disc Layout is still uncertain. We need to converge on a “baseline” by the time of the Nikhef meeting. Solution with better coverage but more complicated from an Engineering point of view and more massive. - Need optimization.

Eng. Layout Studies 8/12/200811David Lissauer, Santa Cruz Meeting. Eng. Studies of the Layout. Global Support Tube: Pixel? – Very Short strips?

Baseline Assembly Sequence 8/12/200812David Lissuaer, Santa Cruz Meeting.  “Full” Assembly on the surface in “Global Tracker Tube”  Barrel SS/LS  Pixel outer Layers (2 or 3)  Pixel Discs + Pixel Tube  EC LS/SS + Pixel Tube  Full test on the surface prior to installation  Insertion from the side  ~ 6.5 Meter Long  ~1 meter Diameter  Borated Poly insertion & Services preparation on the Cryostat  Global Tube insertion from the side  Services connections

13 ATLAS UPGRADE ASSEMBLY SEQUENCE OF INNER DETECTOR C.BAULT May 15th 2008 Outer cylinder Barrel-LS Pixel Barrel-SS Pixel Services INSERTION END-CAP NOSE + PIXEL DISCS 5-6 INTO OUTER CYLINDER End_Cap nose Pixel discs 5-6 Services

14 ATLAS UPGRADE ASSEMBLY SEQUENCE OF INNER DETECTOR C.BAULT May 15th 2008 Outer cylinder Barrel-LS Pixel Barrel-SS END-CAP NOSE + PIXEL DISCS 5-6 INSTALLATION OF SERVICES End_Cap nose Pixel discs 5-6 Services

15 ATLAS UPGRADE ASSEMBLY SEQUENCE OF INNER DETECTOR C.BAULT May 15th 2008 Outer cylinder Barrel-LS Pixel Barrel-SS End_Cap nose Pixel discs End_Cap main bloc with services INSERTION MAIN BLOC OF END-CAP INTO OUTER CYLINDER

16 Atlas IT envelope layout drawing 160 Pixel Electrical Connectors

ATLAS Timeline. LHCC will ask experiments for:  LoI Letter of Intent – Mid 2009  TP Technical Proposal - spring 2010  TDR Technical Design report / Subsystem (do not have to be at the same time)  ID – Late 2010 (early 2011)  Calorimeters - Middle of 2011  Muons - Middle / Late 2011 (Depend on upgrade scope) 17 8/12/2008 David Lissuaer, Santa Cruz Meeting.

8/12/ David Lissuaer, Santa Cruz Meeting. Schedule Overview (Preliminary)  Ready for beam December ‘17  Tracker Installation February ‘17  Tracker Ready for installation (Testing)July ‘16  Barrel Installation in the Support TubeJanuary ‘16  EC Installation in the Support TubeApril‘16  Stave installation startJune ‘14  Support Structure ready for installationJanuary ‘14  Start services installation  EC Stave Production starts June ’13  Barrel Stave Assembly startsJanuary ’13  Readout Electronics and Stave components ready for assembly at this time.

Conclusions 8/12/200819David Lissuaer, Santa Cruz Meeting.  Little feedback from Simulation to date!!  We might not have significant feedback from physics analysis before final decisions will need to be made.  To stay on Schedule need to agree on a baseline (at least for the barrel) by the NIKEHF meeting.  Assembly on the surface has significant advantages. Might be the only solution that will allow installation of the detector in 18 month shut down.  Has serious schedule implications!!!  Detector needs to be ready ~12-18 month earlier.