Task Force 1: Protection against Water Jun 4th , 2015.

Slides:



Advertisements
Similar presentations
Regulations for HEVs and EVs on the Electric Safety MLIT, Japan.
Advertisements

Task Force 3: Electrolyte leakage Last update- 12/05/
TF8 – OICA considerations for the draft annex for heavy vehicles.
Progress report of TFG 7 “Fire resistance test” Mar 18, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 69 th GRPE 5-6 th June 2014 Geneva Chair Petter ÅSMAN.
Task Force 1: Protection against Water China Mar 19 , 2015.
Progress Report, EVS SOC-TF May 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DC
FAO/WHO Codex Training Package Module 2.6 FAO/WHO CODEX TRAINING PACKAGE SECTION TWO – UNDERSTANDING THE ORGANIZATION OF CODEX 2.6 How does Codex elaborate.
Volker Rothe, OICA October 23, 2012 Draft Global Technical Regulation Electric Vehicle Safety Outline of the OICA proposal.
Draft Proposal ECE-R 100 protection against electric shock
Task Force 3: Electrolyte leakage Last update- 11/11/ EVS-06-19e.
Task Force 3: Electrolyte leakage Last update- 01/06/
TF5 – Status report on thermal propagation EVS-GTR 9 th IWG meeting Changchun, China 2015/9/17.
Flooding Test of Electric Vehicles FAW , CHINA
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
9th GTR EVS meeting TF4 status report
Progress report about RESS activities Gerd Kellermann, Germany Informal document GRSP (50th GRSP, 6–9 December 2011, agenda item 15)
Progress report of TFG 7 “Fire resistance test” (rev.1) Nov 19, 2014 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
1 TF8 : Applicability for Commercial Vehicles EVS 8th Meeting June 4th , Washington DC.
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
Task Force 3: Electrolyte leakage Last update- 14/09/
Task Force 1: Protection against Water September 14th , 2015.
Regulations of Crash Safety about HEV and EV MLIT, Japan December 2006 Informal Document No. GRSP th GRSP 12th- 15th December 2006 Agenda Item.
Purpose of Water Test Purpose of Water Test is to evaluate protection performance against the electric shock of vehicle in normal operation. Requirements.
Task Force on Electro-magnetic Compatibility (TF EMC) Status report of TF to GRE-75 Friday, 8 April 2016 Informal document GRE (75 th GRE, 5-8 April.
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Task Force 1: Protection against Water February 29th , 2016.
Review of EVS 9 th Meeting 1> TF8 catch an agreement on the definition of heavy duty electric vehicles as below: heavy vehicles cover the vehicles belong.
TF#4 – Mechanical Integrity Approved Japanese proposal for addition of vehicle mechanical protection structure into mechanical integrity requirement. EVS-11-17e.
1  Position of China and Japan  The water test should be included in EVS-GTR Phase 1.  Test exemption for vehicles with isolation monitoring system.
Task Force 8: Heavy Duty Vehicles
OICA input on TF1 discussions for GTR-EVS
WLTP IWG ISC Taskforce: Starting note
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
10th EVS-gtr IWG Progress Report TF6 - SOC 2nd March
Electric Vehicles Safety Global Technical Regulation
EVS-11-22e Summary Report on TF8 Washington DC, US 2016/06/16.
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Submitted by expert from the Republic of
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
JASIC Japan ______ 61st GRSP Session May 2017
Task Force Outline Submitted by an expert from the Republic of Korea
Final Report of TF-CS/OTA September The Amba Hotel, London
Outcome of TFCS-12 - summary slides - (detailed meeting minutes will be provided separately) April The Shilla Seoul, ROK.
TF4 report (Tokyo, 2016/03/03) 1. Mechanical integrity test
“Fire resistance test”
Task Force 3: Electrolyte leakage
Note by the secretariat
Task Force 1: Protection against Water
Task Force 1: Protection against Water
Status report from UNECE Task Force on Cyber Security &
WLTP Phase 2 Presentation and discussion of the Term of Reference for the Durability Task Force Paris, April th WLTP IWG meeting DG GROW.C4.
Chair: Jin Seop Park, Republic of Korea Secretary: Irina Dausse, OICA
Informal document GRVA st GRVA, September 2018
Status report of TF-CS/OTA
EVS-06-10e Progress Report on TF5 Nov. 3rd, 2014.
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Status Report Cop Taskforce
Discussion at 21 September 2016 IWG meeting
Task Force 1: Protection against Water
TF9 Meeting: Warning Light Indicator
Establishment of Subgroup “Drafting”
Introduction to Revision of GTR 7
Global Technical Regulation on Electric Vehicle Safety
Task Force 9 Progress Report
Task Force 1: Protection against Water
TF5: Cell/module/system test
TF1 Meeting content Open issues of EVS 10th meeting
Presentation transcript:

Task Force 1: Protection against Water Jun 4th , 2015

2 Outline 1 General information about TF1 2 TF1 working progress

3 TF1 working scope  To prevent the person from electric shock :washing and flooding. TF1 working objective  To form the requirements in the GTR regulations. The working group No.MembersNo.Members 1Nha Nguyen (USA, NHTSA)12Mr. Brian Lawrence, JLR. 2Mr. Thomas Goldbach, GM13Alexandra MULOT, UTAC(France) 3Mr. Volker Rothe, GM14Mr. Olaf Boese, SK Continental 4Mr.Heiko Mertens (OICA, Volkswagen)15Mr. Karim Kortlaender 5Mr. Uwe Lachmund, VW16Mrs. Samarendra Triphathy, Renault 6Mr. Willi Josefowitz, VW17Mrs. Annika Tidblad, Scania 7 PaulineLejeune, PSA Peugeot Citroen ( OICA ) 18Mrs. Laura Schenk,Daimler 8Kazuya Ohzono(Japan, Honda)19Michael Guse, Daimler 9Mr. Masaaki Iwasaki, Toyota20Mr.Zhan Wenzhang, China, BAIC GROUP 10Mr. Takahiko Miki, Toyota21Mr.Chen Ping Chnia,CHANGAN 11Mr. Naoki Kinoshita, Honda22Mr. ZhangTianqiang, China, FAW 1 General information about TF1

4  The 4th EVS meeting TF1 was set up.  The 5th EVS meeting Discussed the requirements and test procedures of insulation resistance proposed by FAW(China).  The 6th EVS meeting EVS IWG asked TF1 draft a proposed text for inclusion in the draft GTR.  The 7th EVS meeting TF1 proposed draft to the EVS IWG. 2 TF1 working progress

1.China proposed the GTR draft in the EVS 7 th meeting, and OICA revised it from the word and grammar point of view, and gave some other very good advices; 2. TF1 hold Chinese experts F2F meeting to discuss the revised document in Beijing,during the meeting, the TF1 team make agreement about the draft; 3. TF1 experts reached an agreement about the draft on 2th June except one open issue—detailed parameter of the flooding test procedure; 4. China will organize TF meetings to discuss the flooding test parameter in future. Progress After EVS 7 th Meeting

6