F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.

Slides:



Advertisements
Similar presentations
RFQ Matcher. What am I doing this time?! Concerned that modulations and matcher affect field flatness and frequency These are very small features How.
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Pepperpot Emittance Measurements of the FETS Ion Source
EMMA Cavity Update Emma Wooldridge 27/02/07. Requirements Initial Design Cavity Options & Optimisation Available Designs Future Work.
Superconducting Spoke Resonator Cavities and Cryomodules
Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
On MICE Coordinate System Yury Ivanyushenkov RAL.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
UKNFIC meeting, 20 Oct 2005 – From Physics model to Engineering model Peter Savage From Physics model to Engineering model.
Agenda : CLIC Civil Engineering and Services (CES) WG.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Compressor status AWAKE Technical Board meeting 19 August 2015.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
FETS Pepperpot Simon Jolly 10 th February The Pepperpot Beam segmented by intercepting screen with regular array of holes. Beamlets drift short.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
PASI OsC meeting 12th July 2012
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Developments of the FETS Ion Source Scott Lawrie.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
FETS Laserwire Status David Lee
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Front End Test Stand (F.E.T.S.)
F.E.T.S. Mechanical Engineering Update
Pepperpot Emittance Measurements of the FETS Ion Source
Status of the Front End Test Stand April 2007.
16 T dipole in common coil configuration: mechanical design
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
Optimisation of the FETS RFQ
HIE-LINAC status report
(i.e. the 4-vane cold model)
RFQ Cold Model End Flange Cone and Finger Conceptual Design
Mechanical Engineering progress for the Front End Test Stand
Front End Test Stand (F.E.T.S.) Engineering Progress Report
WP16 Water cooling systems
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007

Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank

1)RFQ cold model end flange inserts Due for delivery on September 3 rd but anticipate a delay of approx. one week.

Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank

Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank

The FETS support stands in R8

The FETS support stand with rails

Beam Floor to centre of beam = 1650mm Rail diameter = 50mm Rail spacing = 800mm Floor to centre of rail = 800mm The FETS support stands main parameters

The FETS support stands vee blocks Corner vee block – 4 per stand Mid vee block – where needed Due for delivery on September 10 th.

Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank

Design concept of the laserwire beam profile measurement tank Layout of four ALIO linear/rotary stages Beam pipe Beam

Design concept of the laserwire beam profile measurement tank Solenoid Faraday cup

Post acceleration conceptual design