International Climate Policy Hamburg Institute of International Economics International Climate Policy Options for making small scale CDM projects more.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

BASELINE STANDARD UNFCCC secretariat workshop
PoA AFTER Cancun - READY TO TAKE OFF NOW
A Project Developers view for post 2012 carbon market (Plenary IV) 25 March 2012 Mischa Classen Executive Committee, Project Developer Forum First Climate.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
CDM baseline standardization – key policy questions Axel Michaelowa Center for Comparative and International Studies (CIS), University of Zurich and ETH.
INTERNATIONAL FINANCIAL CONSULTING EGTT Workshop, September 27-29, 2004 Montreal, Canada Are Export Credit Agencies and Other Traditional Sources of Infrastructure.
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
1 Sinks in the CDM: Assessment of Carbon Accounting Options XVIII Meeting of the Subsidiary Body for Scientific and Technological Advice Bonn (Germany)
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
International Climate Policy Hamburg Institute of International Economics International Climate Policy Graduation and deepening: a suggestion to move international.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
1 Status of Global Wind Power World Energy Solutions Conference Sao Paulo 23 November 2007 Steve Sawyer Secretary General Global Wind Energy Council.
Jamaica’s CDM Experience and NAMA Prospects Gerald Lindo Ministry of Water, Land, Environment and Climate Change (MWLECC) Jamaica.
UNIDO Industrial Energy Efficiency and Climate Change UNIDO Activities in the context of the inter-agency project on capacity building for CDM New Delhi,
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Carbon Trading: The Challenges and Risks John Drexhage Director, Climate Change and Energy International Institute for Sustainable Development Agriculture.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Euroheat & Power Why is there not more combined heat and power?
INTERNATIONAL ENERGY AGENCY AGENCE INTERNATIONALE DE L’ENERGIE 1 Dr. Robert K. Dixon Head, Energy Technology Policy Division International Energy Agency.
Overview: CDM Small-Scale Projects Climate Change Information Center Manila Observatory Ateneo de Manila University.
Possible Development of CDM in the Post-2012 Regime DUAN Maosheng Tsinghua University Beijing, Nov. 19, 2007.
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
Beyond offsetting: Ambitious SBL as a national contribution to combat climate change Malin Ahlberg „Designated Focal Point/Designated National Authority“
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Green Banking and MRV 17 November 2010 Takashi Hongo Special Advisor and Head of Environment Finance Engineering Department Japan Bank for International.
How can CDM help project finance? Jan-Willem Martens, Bangkok, 5 April, 2005.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
International Climate Policy Hamburg Institute of International Economics International Climate Policy Overview of insurance-related actions in the context.
TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.
International Climate Change Regime n UNFCCC – “stabilization of greenhouse gas concentrations at a level that would prevent dangerous anthropogenic interference.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Project-based instruments: economic consequences of the Kyoto and Buenos Aires framework and options for future development Axel Michaelowa Hamburg Institute.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
European Wind Energy Conference February - 2 March 2006, Athens, Greece PROMOTING WIND ENERGY THROUGH THE FLEXIBLE MECHANISMS OF THE KYOTO PROTOCOL.
Impacts of investment on African agriculture and the Principles for Responsible Agricultural Investment (PRAI): evidence from field research, implications.
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Where is the CDM’s future? Some critical observations and reform proposals Oxford, September 19 th 2005.
1 Market View of JI in the National Context Ben Feldman Managing Director Natsource LLC UNFCCC Technical Workshop on Joint Implementation Bonn, Germany.
LULUCF CDM small-scale projects -Small-scale energy projects -Current draft text in SBSTA/2003/L.13 -Simplified procedures for energy projects -Potential.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
El Gallo Hydroelectricity Project PDD Analysis
IFIEC EUROPE – International Federation of Industrial Energy Consumers The way forward to a more efficient and effective EU-ETS IFIEC Europe‘s views Brussels,
International Climate Policy Hamburg Institute of International Economics International Climate Policy CDM: latest status of international rules and the.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
Bundling small scale projects Principles of bundling Bundling Documentation Examples and their applications in Carbon Finance projects Bundling (& “de-bundling”)
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Key challenges and possible new formats for CDM post-2012 ECBI Fellowships, Oxford, Sep. 3, 2007 Axel Michaelowa,
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CDM Projects Analysis in China Nan Luo Erasmus Mundus MSc European Forestry 26/02/2009 Climate Change and Higher Education.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Joint Implementation A Parties and Buyers Perspective
Small Scale Projects – Learning from the CDM Paul Soffe
Small-Scale Projects Under JI
THE KYOTO PROTOCOL AND BEYOND: A LEGAL PERSPECTIVE, Siena June 10, 2006 The Clean Development Mechanism: Challenges and Opportunities Axel Michaelowa.
Presentation transcript:

International Climate Policy Hamburg Institute of International Economics International Climate Policy Options for making small scale CDM projects more attractive Side Event Small scale CDM projects New Delhi, Oct. 26, 2002 Axel Michaelowa Hamburg Institute of International Economics, Germany

International Climate Policy Hamburg Institute of International Economics International Climate Policy Structure of presentation Why small scale projects are unattractive Possible rules and their effects on transaction costs – thresholds – baselines – project cycle steps What project types could be attractive? Conclusions

International Climate Policy Hamburg Institute of International Economics International Climate Policy Why are small-scale projects not attractive? CDM buyer‘s market: price 3-5$ / t CO 2 Transaction costs of full project cycle several hundred thousand $ All projects reducing less than 20,000 t CO 2 per year will not be attractive

International Climate Policy Hamburg Institute of International Economics International Climate Policy Thresholds for small-scale projects and transaction costs

International Climate Policy Hamburg Institute of International Economics International Climate Policy Thresholds If a project has several components belonging to different categories each component will be treated as a single project 15 GWh – average or peak savings? 15 kt threshold can be interpreted creatively and lead to the acceptance of large-scale projects (see landfill gas example)

International Climate Policy Hamburg Institute of International Economics International Climate Policy Baseline options Pre-defined parameters for project-specific baselines depending on project type Proxies for project activity levels that influence baseline emissions – proof of existence – proof of functioning Country-specific pre-defined baseline or benchmark Global pre-defined benchmark for specific project types Global pre-defined baseline for specific project types

International Climate Policy Hamburg Institute of International Economics International Climate Policy Additionality tests No other project of the type exists in the host country A specified number of pre-defined investment barriers exists Project’s generation costs are higher than the generation costs of the country’s expansion plan in the case of grid-connected electricity generation projects

International Climate Policy Hamburg Institute of International Economics International Climate Policy Transaction costs on each step of the project cycle

International Climate Policy Hamburg Institute of International Economics International Climate Policy Options to reduce transaction costs

International Climate Policy Hamburg Institute of International Economics International Climate Policy Draft rules for small-scale projects Bundling allowed, but only up to threshold Same entity for validation and verification Partial standardisation of baseline methodologies and barrier assessment Exemption from leakage determination Only influences limited share of transaction costs Critical test comes when decisions on fees are made (5000 $ registration fee is still much too high) The rules cannot decisively reduce the disadvan- tage of projects below 20,000 t CO 2 annual reductions

International Climate Policy Hamburg Institute of International Economics International Climate Policy Conclusions Small-scale projects have an inherent disadvantage due to high unitary transaction costs and will thus not be attractive to private investors The suggested small-scale project rules alleviate, but do not solve the problem Projects near the thresholds may have a chance, especially if rules are interpreted creatively Subsidisation could make small-scale projects more attractive, but entails other problems.

International Climate Policy Hamburg Institute of International Economics International Climate Policy Thank you! Further information: or: