13-17 October 2008 Berlin, Germany eb - 1 SMWG Closing Plenary Report Fall 2008 Meeting Erik Barkley 17 October 2008.

Slides:



Advertisements
Similar presentations
North American Numbering Council Billing & Collection Working Group Wednesday, November 30, 2005 Co-Chairs: Rosemary Emmer, Sprint Jim Castagna, Verizon.
Advertisements

05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38  SC32 Liaison 1 ISO/IEC JTC1/SC32/WG2 N1599.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
PDS4 Project Lifecycle Support for LADEE, MAVEN April 3, 2013.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
SMWG Closing Report Erik Barkley Chair, SMWG Interim Meeting Greenbelt, MD, USA June 2007 Draft 1.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
CCSDS SOIS Wireless Working Group (WWG) 16-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 16-Sep Sep-2015.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
CCSDS SOIS Wireless Working Group (WWG) 04-Aug-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug New ESA Wireless WG member.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
Discussion Outline 1.RFID Tag-Encoding Blue Book updates to respond to CESG RIDs A.KKG observations and suggestions re: Peter Shames, SANA registries i.ISS.
SMWG-JAXA April JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi 25.April.2007 Telecon.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
April 29, 2004 Project Status Meeting Liang Y. Hsia, P.E. ITS Engineer Administrator Florida Department of Transportation.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
CMC meeting, Nov., 2009 Page 1 JAXA CCSDS Status November, 2009 ESA/ESTEC Noordwijk, Netherlands Kaneaki Narita JAXA CCSDS Secretary Office.
Development of the Vermont Health Information Technology Plan November 1, 2006 Vermont Information Technology Leaders.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
SMWG Closing Plenary Report Erik Barkley Chair, SMWG CSSA Workshop Colorado Springs, USA January 2007.
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
Space Communication Cross Support Architecture WG
Guidance on the new Pathway IT System for Mentors
Cross Support Architecture WG: Charter and Work Plan
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
Guidance on the new Pathway IT System for Mentors
January 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
doc.: IEEE <doc#>
doc.: IEEE <doc#>
FAY Dates School Year Traditional Fall 4x4 Spring 4x
CEOS & Work Plan Status Steven Hosford WGISS-46 22nd October 2018
CEOS & Work Plan Status Steven Hosford WGCV-44 28th August 2018
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group,
doc.: IEEE <doc#>
FAY Dates School Year Traditional Fall 4x4 Spring 4x
Next Steps Advisory group debrief call Circulate meeting summary
Agricultural Marketing
Timeline for the Draft new Naas LAP
01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Session 4: Finalize Project Working Arrangements
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Report on CEOS Executive Officer functions
Presentation transcript:

13-17 October 2008 Berlin, Germany eb - 1 SMWG Closing Plenary Report Fall 2008 Meeting Erik Barkley 17 October 2008

13-17 October 2008 Berlin, Germany eb - 2 Contents 1.Goals for Fall 2008 Berlin Meetings 2.Summary of achievement/decisions 3.Deliverables status 4.Workplan for next ~6 months

13-17 October 2008 Berlin, Germany eb - 3 Meeting Goals Initiate agency Red 3 “fast-track” reviews Formulate work plan for prototype inter-operations supporting validation of Red 3 Develop consensus and work plan for re-factoring of SM recommendation

13-17 October 2008 Berlin, Germany eb - 4 Red-3 Fast Track Review Supporting presentation reviewed Presentation released for agency reviews Agency Reviews initiated –RID submission deadline is 14 November 2008

13-17 October 2008 Berlin, Germany eb - 5 Prototype Interoperation Plan Reached consensus on verification approach –Per-operation basis + diagnostic basis to the level of [service management validation] –[perform operation] to be addressed to the extent that it affects the service management interface Rough time-line for ESA/JPL prototype established for inter-operations to start in January 2009 JAXA prototype upgrade begins April 2009, inter-operation toward Sept 2009

13-17 October 2008 Berlin, Germany eb - 6 Re-factoring for SM after Blue-1

13-17 October 2008 Berlin, Germany eb - 7 Status of Deliverables DeliverablePriorityStatus Blue-11OK XmlSchema1OK Prototype Interoperations 1OK Concept Book2OK Best Practicies3No resources

13-17 October 2008 Berlin, Germany eb - 8 Work Plan ActivityDate Blue-1 Editing, Production from Red-3 Review Jan 09 Red-3 Prototype Interoperations (ESA/JPL) Feb 09 Re-factoring Approach, Executive Summary, Preliminary Draft WB/Paper Apr 09 Red-3 Prototype Interoperations (JAXA/JPL) Sep 09