Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Slides:



Advertisements
Similar presentations
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Advertisements

Using Video Segments to Enhance Early Clinical Experiences of Prospective Teachers Kristen Cuthrell, Michael Vitale, College of Education, East Carolina.
1 Facility Reporting Startup Tool: Workbook Demonstration This tool is designed to help pilot testing facilities identify their most pertinent performance.
Traditional acid well stimulation*
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
COSO Framework A company should include IT in all five COSO components: –Control Environment –Risk Assessment –Control activities –Information and communication.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
California Integrated Water Quality System (CIWQS) and Electronic Self Monitoring Reports (eSMR) Presentation to California Dischargers.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
More on Data Mining KDnuggets Datanami ACM SIGKDD
ExxonMobil BBS web tool Version June What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.
Electronic Reporting for Clean Air Act NSPS and NESHAP Regulations
1 Beyond California Water Plan Update 2005 California Water and Environmental Modeling Forum Annual Meeting, March 3 rd, 2005.
Massachusetts Department of Environmental Protection Bureau of Resource Protection – Drinking Water Program Underground Injection Control (UIC) eDEP Forms.
Developing your Project Problem/Need Report Topic Possible Solutions The Solution InvestigationEvaluation Conclusions Client constraints Legal constraints.
Electronic Portfolios Preparing Our Students for the 21 st Century The Future.
Computing Fundamentals Module Lesson 19 — Using Technology to Solve Problems Computer Literacy BASICS.
CONCERTO Premium Technical Monitoring Database & Semantic Layer Milan Marinov, KIT Prof. Andreas Wagner , Brussels.
EXPLORATORY / COMPARISON TEST. What types of written information will be required? – Prerequisite – Theoretical or conceptual – Procedural – Examples.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Definition of Soft Sand
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Status of Task 1 (Monitoring) March , Milan, Italy.
Update Utilization of AMD in Well Development for Natural Gas Extraction May 16, 2012.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
FRPA Data Management/Reporting System (Data Collection and Reporting) Building Your New System: Business Requirements Suggestions and Questions RSM Pilot.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
United Nations Workshop on Revision 3 of Principles and recommendations for Population and Housing Censuses and Census Evaluation Amman, Jordan, 19 – 23.
New Revised Specification In Construction For 1st teaching September 2009 For moderation 2011.
Hydraulic Fracturing (Fracking)
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Iredell-Statesville Schools Orientation to the North Carolina Teacher Evaluation Instrument & Process
BP/ARCO GeoTracker User Experiences California CUPA Form February 2002.
Field Development Optimization
February 28 Assignments HW #8, 9, and 10 assigned Implementation plan
Integration of Mobile GIS Technologies in the West Virginia Department of Environmental Protection Bond Forfeiture Program Sarah Clapham and Yueming.
Status of Task 5 (Layered Formations)
3E Plus Program Software Insulation Thickness Calculator
Integrating Word, Excel, and Access
Dissemination Working Group
ISO Task Group Update Wayne Mabry.
Project–Based Learning
Item 4.2 – Implementation of the Adult Education Survey
PWRI Quarterly Meeting Tentative Agenda
Butte County Board of Supervisors April 21, 2015
LSI-VC-3 Session 23, 24 CARD4L Overview and Specifications Objectives
Course Evaluation Ad-Hoc Committee Recommendations
WOC 1: Exploration & Production of Natural Gas
WP 4 - Revision of Natura 2000 dataflow
Produced Water Reinjection Performance Joint Industry Project
Summary and Action Points
Microcomputer Applications
Computer Literacy BASICS
Harmoni-CA initiative
Task Status - Recap.
Reportnet 3.0 Database Feasibility Study – Approach
NRRA Pavement Workshop 2019
Sand face pressure vs. rate (Oman)
Workshop: Equipment June 29, 2006.
Guidance document on the identification of water bodies
Presentation transcript:

Overview of All Tasks March , Milan, Italy

Task 1 - Monitoring Monitoring Methods Conventional methods completed Need to add fiber optics Need to finalize PLTs Need to improve fractured monitoring Need to incorporate specific Best Practices – suggestions?

Task 1 - Monitoring Fracture ModelsAudit and Summary Completed Add “high-level” comparison to Best Practices Any missing models?

Task 1 - Monitoring Well Performance Prepared introductory level presentation on Well Performance for Injectors Radial flow completed Wellbore Hydraulics Completed – more on restrictions Completions

Task 2 – Matrix Injection Methods for Performance Assessment Methods for Mitigating Plugging Integrated with Tasks 3 and 4 Incorporate in Best Practices Finalize Stimulation Selection Tool Evaluate recent Chevron dataset (also Soft Formations)

Task 2 – Matrix Injection Radial Damage Modeling PWRAD Damage Exponents Characteristic Signatures

Task 3 – Soft Formations Data Evaluation Models Weyburn data remains to be considered? Document prepared and needs to be added to Best Practices site

Task 3 – Soft Formations Theory Data Evaluation Models Overview document is in Toolbox Weyburn data remains to be considered? Document prepared and needs to be added to Best Practices site

Task 3 – Soft Formations Completions Worksheet Completions Skin Version in ToolBox “works” with Toolbox Laurence Murray version works properly version Version that is having Help integrated. Help Document prepared and has been added to Best Practices site

Task 4 – Stimulation and Mitigation Introductory Document on Methods Signatures Stimulation Selection Routine Surface Systems Economics? In Best Practices - needs peer review Draft Version in ToolBox Needs section in Best Practices Upcoming Release ?????

Task 5 – Layered Formations Is still weak. Some mitigation methods from Workshop. Some monitoring methods.

Task 6 – Horizontal Injectors Analysis methods PowerPoint presentation. Needs to be written up for Best Practices Some data analysis Needs to incorporate examples and methods particularly for bringing wells on line.

Task 7 – Database All electronic numerical data has been entered except Weyburn and complete Maersk data set. However, Maersk data set has and continues to be used extensively for Stimulation Task. PC version available. Need to integrate databases.

Task 8 – Field Validation Update summary spreadsheet. Process recent Heidrun data set. Process other new examples.

How is the Project Consolidated? Best Practices ToolBox Database

How is the Project Consolidated? Best Practices –Web and CD based product –Based on provided recommendations –Incorporates Workshops and Minutes –Tied to ToolBox and Database –Real Need for Mentors at this point!

How is the Project Consolidated? Best Practices – Categories No Longer Task-Based –Well Construction –Operational Issues –Performance –Management –Related Topics –Documents, References, Forms

How is the Project Consolidated? Best Practices – Categories No Longer Task-Based –Well Construction Drilling Completion Soft Formations Surface Facilities

How is the Project Consolidated? Best Practices – Categories No Longer Task-Based –Operational Issues Monitoring Stimulation Surface Water Treatment Matrix vs Fractured Surface Facilities

How is the Project Consolidated? Best Practices – Categories No Longer Task-Based –Performance Monitoring Layered Formations Horizontal Injectors Matrix vs Fractured Pilots Surface Facilities

How is the Project Consolidated? Best Practices – Categories No Longer Task-Based –Management Environmental Issues Economics Others

How is the Project Consolidated? Best Practices – Categories No Longer Task-Based –Related Topics Tools Database Workshops/Minutes Field Trials PEA-23 Cavity Completions Other Articles/Links

How is the Project Consolidated? Best Practices

How is the Project Consolidated? Best Practices ToolBox –Data Management, PWRAD, restricted access to PWFRAC, Completions Worksheet, Crossflow, “Multilaterals/Multiple Fractures,” Stimulation Selection, Others, Economics? Database

How is the Project Consolidated? Best Practices ToolBox Database –Web-based version –PC-based version –Integrated with Toolbox