Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.

Slides:



Advertisements
Similar presentations
EU funds Operational Program National co-funding Priority axes Schemes Projects by Institutions Projects by NGOs Projects by Bulgarian Companies Subcontractors.
Advertisements

The Water and Sanitation Project The Provision of Water and Sewer Connections to Toilet blocks in Informal Settlements in EThekwini.
Time Series Analysis – Homework Homework Rules: All homework must be completed by due date Homework may be done in groups – please put names of all group.
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
Family drip system for 500 sq. meter. Water tank 4 m^3.
1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International.
ISPA Measure 2000 BG 16 P PE 001 Integrated water project – City of Sofia Performance 100%
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Backflow Preventor. (4) The Contractor V may install the cross-connection backflow prevention device as defined in this chapter on new installations.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
II. Sewer Network and Facilities Topic II. 10
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Water Supply and Sewage Year 7 Unit 4.4. Water debate Is it ok to drink recycled sewage? Is it ok to drink recycled sewage? With Australia in the grips.
CONSILIUL JUDETEAN CALARASI
Treating Drinking Water Treatment Plant Water Distribution.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
From Paddy and Timm.
Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 004 FGD Plants at Units 5&6 of TPP Maritsa East 2.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Tenth Cohesion Fund (Regulation 1164/94) Monitoring.
An-Najah National University Faculty of Engineering Civil Engineering Department COST STUDY FOR TWO BEDS TO THE SAME PROJECT (construction main transmission.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Institute of Urban Water Management. Technical & Chemical Laboratory.
Project No 2005/LV/16/C/PE/003 Development of water services in Riga, stage III This project helps to reduce economical and social disparities among the.
Backfilling new sewer line trench/excavation Multitask sewer installation: trenching and installing new sewer line followed by trench backfill and compaction.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Outline Introduction. Population Analysis Study Area Objectives
 Sanitation situation reflects the development of communities.  Health of people is also related to the sanitation situation.  Existing of sewerage.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
AN – Najah National University
Septic System Construction and Location GET PUMPED!
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
TREATMENT PROCESS (Chicago)
Hierbas Buenas Brian Bozzo Gerard Hubert Michael Newman Patrick Sweeney.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
11-14 April 2011 A P A V I T A L (Iai – Romania) general overview U.S. Civil Water and Wastewater Industry Program in Romania & Moldova - BUCHAREST.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Muttathara Sewage Treatment Plant - Blue Drops. Features of the plant The only one in the whole of Kerala Started in 2012 Capacity of 107 MLD (million.
Grant Ellis Southeastern LA Univ. Engineering Technology, Construction ET 494 Fall 2013 Advisors: Mohamed Zeidan Ed Rode Cris Koutsougeras.
Works Contract Commencement Date: 20th May 2005
TECHNICAL SPECIFICATION AND REQUIREMENTS
Integrated Water Project for the town of Sliven
An-Najah National University
Design of Wastewater Collection Network for Teeba
Private Septic Systems
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Prepared By : Osama amr Qutayba mElhim
An-Najah National University Faculty of Engineering
Wastewater collection network & treatment plant for Burqeen village
Private Septic Systems
ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors
ISPA Measure 2002 BG 16 P PE 014 WWTP SEVLIEVO
ISPA Measure 2002 BG 16 P PE 009 WWTP Bourgas – Meden Rudnik
ISPA Measure 2002 BG 16 P PE 010 Targovishte Wastewater Collection and Treatment, Republic of Bulgaria.
ISPA Measure 2002 BG 16 P PE 011 WWTP LOVECH
Sewerage systems: Types and comparison. Pipes
Shoumen Water Cycle Improvements
Fueling the Future of the Fairbanks North Star Borough
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Sanitation Study and Wastewater Network System AL Tayba Village
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
2015 January February March April May June July August September
Presentation transcript:

Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK

Works Contract WWTP Balchik Commencement Date:28 th June 2006 Completion Date: 10 th March 2010 Physical Execution:100 % Contract Price: Euro WWTP became operational on 10 th March 2010

Taking –over of the Works and Sections of WWTP Balchik

WWTP BALCHIK Aeration tank Sludge tank

WWTP BALCHIK Main Tanks

Scroober installation at Chlorination Building WWTP BALCHIK

Balchik Water Supply& Sewerage Network Connections Works Contract ISPA Measure 2002 BG 17 P PE 017 Commencement Date: 07 th January 2008 Completion Date: 23 th December 2011 Physical Execution:100% Contract Price: Euro The Water Supply and Sewerage networks became operational on 23 th December 2011

Balchik Water Supply& Sewerage Network Connections Information boards

Balchik Water Supply&Sewerage Network Connections Main sewerage and house connections Compaction as layer on sewer line, Part III, Section F

Backdrop Manhole, Part IV, Section A Balchik Water Supply&Sewerage Network Connections Excavation on water supply main pipe, Part IV, Section A

Balchik Water Supply& Sewerage Network Connections Excavation on Water Main – G. Milev Street

Balchik Water Supply& Sewerage Network Connections Covering pipe for pressure under the Kavarna motorway

Balchik Water Supply& Sewerage Network Connections Main to Reservoir (Tsarichino) excavation

Balchik Water Supply& Sewerage Network Connections Welding activities on Tsarichino main pressure conduit