Satyanarayana Bheesette Roll number: 04412701 Supervisors Prof Raghava Varma, IIT Bombay Prof Naba Mondal, TIFR, Mumbai Department of Physics Indian Institute.

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Advertisements

Glass Resistive plate chambers for muon Detection
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Design and Characterisation Studies of Resistive Plate Chambers (Ph. D
M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, S. Mohammed 3, N.K. Mondal 1, P. Nagaraj 1, A. Redij 1, D. Samuel 1, M.N. Saraf 1, B. Satyanarayana.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
ICAL Instrumentation Challenges &/ Opportunities B.Satyanarayana TIFR, Mumbai.
24-28 May, 2010 S. Mastroianni - 17th Real-Time Conference, Lisboa, Portugal ARGO-YBJ is a cosmic ray air shower detector based on a single layer of RPC.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Characterization And Testing Of 2m X 2m Glass Resistive Plate Chamber Mohammed Salim M Aligarh Muslim University.
B.Satyanarayana, For INO Collaboration. B.Satyanarayana, INO INO-KEK Meeting January 28, 2009, TIFR, INDIA2 48.4m 16m 14.5m To study atmospheric neutrinos.
Results from development of Glass RPCs for INO detector
Development and study of Glass Resistive Plate Chambers Satyanarayana Bheesette Roll number: Supervisors Prof Raghava Varma, IIT Bombay Prof Naba.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
B.Satyanarayana, TIFR, Mumbai INO Collaboration. B.Satyanarayana, TIFR, Mumbai INO Collaboration Meeting, Madurai Kamaraj University September 13-15,
Status of INO detector R&D B.Satyanarayana TIFR, Mumbai.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
15th Dec, 2007DAE-SNP07 S.S.Upadhya1 Electronics and Data Acquisition system for prototype INO-ICAL detector A.Behere1, V.B.Chandratre1, S.D.Kalmani2,
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
ICAL Electronics: Requirements and Challenges B.Satyanarayana TIFR, Mumbai.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
On aging problem of glass Resistive Plate Chambers India-based Neutrino Observatory (INO) collaboration JIGSAW.
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
India-based Neutrino Collaboration(INO), INDIA1 B.S.Acharya, Sudeshna Banerjee, P.N.Bhat, S.R.Dugad, P.Ghosh, K.S.Gothe, S.K.Gupta, S.D.Kalmani, N. Krishnan,
B.Satyanarayana, TIFR, Mumbai. Architecture of front-end ASIC INO Collaboration Meeting VECC, Kolkata July 11-13, Amp_out 8:1 Analog Multiplexer.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
Design of a readout system for RPCs Olu Amoda2 The LODEN Group The group is an association of Fermilab scientists who teamed up to build a cosmic ray.
ICAL electronics and DAQ schemes - 1 B.Satyanarayana, TIFR, Mumbai For INO Collaboration.
B.Satyanarayana, TIFR, Mumbai INO Collaboration. B.Satyanarayana BARC-TIFR INO meeting, TIFR, Mumbai November 9,
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Proposer: B.Satyanarayana Mentor: Prof Naba K Mondal
16 October, 2009ASET talk - S.S.Upadhya Electronics and DAQ system for INO-ICAL prototype detector (Presented by S.S.Upadhya, TIFR on behalf of INO collaboration)
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Naba K Mondal TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
INO prototype detector and data acquisition system Anita Behere, M.S.Bhatia, V.B.Chandratre, V.M.Datar, P.K.Mukhopadhyay Bhabha Atomic Research Centre,
Characteristic Impedance Measurement of Pickup Panel made up with a Suitable Dielectric Material, and Surface Resistivity (Automation) for large RPC electrodes.
The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, Development of RPCs for INO B.Satyanarayana TIFR,
Satyanarayana Bheesette Tata Institute of Fundamental Research, Mumbai, INDIA (For INO Collaboration) INO: India-based Neutrino Observatory ICAL: (Magnetised)
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Results achieved so far to improve the RPC rate capability
DHCAL TECH PROTO READOUT PROPOSAL
Multigap Resistive Plate Chambers (MRPC)
INO TRIDAS presentations
Conceptual design of TOF and beam test results
Han Jifeng BESIII MUON GROUP IHEP, CAS
11th Pisa meeting on advanced detectors
Development of Resistive Plate Chamber for charge particle detection
Presentation transcript:

Satyanarayana Bheesette Roll number: Supervisors Prof Raghava Varma, IIT Bombay Prof Naba Mondal, TIFR, Mumbai Department of Physics Indian Institute of Technology Bombay August 2008 Design and Simulation Studies of Resistive Plate Chambers (Ph.D Progress Seminar)

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay2 Plan of the this presentation Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay3 Next topic … Long term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay4 Long-term stability tests of RPCs Two small area RPCs made of Japanese glass Operated in avalanche mode No sign of any aging after continuous operation for 2.5 years Long-term tests stopped end of last year Wealth of data collected; conclusions made Tried another large area RPC in streamer mode this year Chamber died after a few weeks of operation

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay5 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay6 Honeycomb pickup panel Terminations on the non-readout end Machined pickup strips on honeycomb panel Preamp connections on the readout end

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay7 Measurement of characteristic impedance Recipe: Tune terminating impedance for each strip width until the reflected signal for injected charge pulse disappear.

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay8 Pulse profiles while measuring Z  51  Open 48  100 

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay9 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay10 Electrode coating technique Graphite paint prepared using colloidal grade graphite powder(3.4gm), lacquer(25gm) and thinner(40ml) is sprayed on the glass electrodes using an automobile spray gun. A uniform, stable graphite coat of desired surface resistivity ( K  /  ) can be obtained by this method.

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay11 Specifications of the new spray paint

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay12 Prototype of automatic painting machine

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay13 Screen printing parameter optimisation

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay14 Study on effect of thinner on the resistivity

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay15 Technique of screen printing on glass

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay16 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay17 New gas system features 16 pneumatically controlled outputs Molecular sieve based input filter columns Nippon Tylan made model FC-760 MFCs Parker made fine filters on the mixed gas On-line moister readout on mixed gas Output flow control by SS 0.3mm capillaries Bleeder bubblers for RPC protection Facility to add controlled moister into the mixture Computer interface for control and monitoring

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay18 Front-view of the new gas system

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay19 Precision calibration of the gas system R134a ArgonIso-butane SF 6

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay20 Cross-calibration of the gas system Calibration done using water displacement method Calibrated against the MFC monitor voltage Cross-calibration procedure –Glass/hard plastic tube with precise inner diameter chosen. Placed on a perfectly horizontal surface. –Water droplet introduced through an opening on one end of the tube –Gas connected to this end –Gas moves the water droplet forward α gas flow –Distance, time intervals measured –Gas volume computed and compared with displayed value

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay21 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay22 Magnet iron installation T and C Sections of the magnetAssembled magnet

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay23 B-H curve for prototype magnet Steel sample size: 68cm  43.5 cm  4.8 cm Number of turns in coil: 25

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay24 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay25 Schematic of the prototype detector stack

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay26 Prototype detector stack and the DAQ

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay27 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay28 Schematic of prototype detector DAQ

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay29 Preamp for prototype detector Built as a cascade of BMC1595/BMC1597 and BMC1513 HMCs, developed at BARC, Electronics Division Overall gain of about 80. Rise and fall times are about 3nS and 6nS Noise band within ±7mV

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay30 Gain characteristics of preamplifier

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay31 16-channel analog front-end Functions –To digitize the preamp signals –To form the pre-trigger (Level- 0) logic –Signal shaping Features –Based on the AD96687 ultra- fast comparator –Common adjustable threshold going up to 500mV –V Th now at -20mV –ECL output for low I/O delay and fast rise times

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay32 32-channel digital front-end Functions –Latch RPC strip status on trigger –Transfer latched data serially through a daisy chain to the readout module –Time-multiplex strip signals for noise rate monitoring –Generate Level-1 trigger signals Features –Latch, shift register, multiplexer are implemented in CPLD XC95288 –Trigger logic is built into a CPLD XC9536; flexible –Data transfer rates of up to 10MHz

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay33 Control and data router To route the control signals and shift clock from controller to the individual FEP modules To route the latch data from all the FEPs to the readout module To route strip signals from FEPs to the scalers for noise rate monitoring

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay34 Trigger and TDC router To route the m-Fold signals from each RPC plane to the final trigger module To route TDC stop signals (1-Fold) from each plane to the TDC module All signals are in LVDS logic, except TDC stop signals which are in ECL logic for achieving better timing resolution

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay35 Data and monitor control module On FTO, triggers all the FEPs to latch the strip signals Initiates serial data transfer to the readout module Manages the noise rate monitoring of strip signals, by generating periodic interrupts and selecting channels to be monitored sequentially CAMAC interface for parameter configuration (like data transfer speed, size, monitoring period) as well as diagnostic procedures

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay36 Data and monitor readout Module Supports two serial connections for event data recording of X and Y planes and 8 channels for noise rate monitoring Serial Data converted into 16-bit parallel data and stored temporarily in 4k FIFO buffer Source of LAM for external trigger source CAMAC interface for data readout to Computer

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay37 Final trigger module Receives m-fold layer triggers and generates m  n fold final trigger Final trigger out (FTO) invokes LAM and is Logic Trigger Out (LTO) vetoed by gated LAM Inputs can be selectively masked The rates of different m  n combinations counted by embedded 16-bit scalers Rate monitoring of LTO signal using the built in 24-bit scaler Logic inputs and m  n signals are latched on an FTO and can be read via CAMAC commands Implementing using FPGA adds to circuit simplicity and flexibility

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay38 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay39 Typical cosmic ray muon event

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay40 Efficiency time profile of an RPC

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay41 RPC absolute time resolution plots

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay42 RPC relative time resolution plots

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay43 RPC Id HV(KV) Mean(nS) Sigma(nS) RelMean(nS) RelSigma(nS) AB JB IB JB JB IB AB AB AB AB Reference RPC AB AB RPC-wise timing parameters

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay44 RPC strip hit summary RPC Id = AB08 HV = 09.8KV No strips hit : 35 [ 5.4] Strips : 408 [62.4] Strips : 619 [94.6] Strips : 425 [65.0] Strips : 619 [94.6] Strips 15 x 16 : 0 [ 0.0] Strips 16 x 17 : 214 [32.7] Strips 15 x 17 : 0 [ 0.0] Strips 15 x 16 x 17 : 0 [ 0.0] Strips 15~ x 16~ x 17 : 211 [32.3] Strips 15 x 16~ x 17~ : 0 [ 0.0]

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay45 Strip hit map of an RPC in a run

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay46 RPC strip rate time profiles

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay47 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay48 RPC strip cluster size analysis RPCSize AB011.1 AB022.3 AB032.2 AB042.3 AB064.0 AB072.4 AB081.9 IB012.2 IB021.1 JB001.6 JB013.0 JB031.1

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay49 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay50 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay51 Presentations and papers 1.Development of glass Resistive Plate Chambers for INO experiment, Proceedings of RPC2007, Nuclear Instruments and Methods A, In press 2.INO prototype detector and data acquisition system, Proceedings of RPC2007, Nuclear Instruments and Methods A, In press 3.Development of conductive coated polyester film as RPC electrodes using screen printing, Proceedings of RPC2007, Nuclear Instruments and Methods A, In press 4.On-line gas mixing and multi-channel distribution system, Proceedings of RPC2007, Nuclear Instruments and Methods A, In press 5.RPC exhaust gas recovery by open loop method, Proceedings of RPC2007, Nuclear Instruments and Methods A, In press 6.Development of glass Resistive Plate Chambers for INO, Proceedings of International Conference on High Energy Physics, University of Philadelphia, July 29 - August 5, Development and characterisation of large area glass Resistive Plate Chambers for the ICAL detector at INO, Proceedings of Nuclear Physics Symposium, Sambalpur University, December 11-15, Electronics and data acquisition system for prototype INO-ICAL detector, Proceedings of Nuclear Physics Symposium, Sambalpur University, December 11-15, Development of Resistive Plate Chambers for INO ICAL detector, Invited talk at University of Roma Tor Vergata, November 2, Electronics for the INO ICAL detector, Presentation at KEK, Japan, November 27, Commissioning of ICAL prototype detector electronics, Presentation at INO Collaboration meeting, BARC, April 13-14, Electronics, trigger and data acquisition systems for the INO ICAL detector, Presentation at INO Collaboration meeting, BARC, April 13-14, Possible schemes for INO-ICAL electronics, Presentation at INO Electronics Meeting, TIFR, September 21, The joy and challenge of doing experimental particle physics, CBS Colloquium, August 12, 2008

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay52 Next topic … Long-term stability tests of RPCs Development of honeycomb pickup panels Development and study of electrode coatings Calibration and precision studies of the gas system Design and construction of prototype detector magnet Design and construction of prototype detector stack Electronics, trigger, DAQ and monitoring systems Analysis of ICAL prototype detector stack data Study of RPC cluster size Summary and conclusions Presentations and papers Acknowledgements

August 23, 2008B.Satyanarayana Ph.D Progress Seminar, IIT Bombay53 Acknowledgements Prof Raghava Varma, IIT Bombay Prof Naba Mondal, TIFR, Mumbai Prof Basant Nandi, IIT Bombay Prof S.Uma Sankar, IIT Bombay INO detector development & electronics design teams’ colleagues