Presentation is loading. Please wait.

Presentation is loading. Please wait.

B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400.

Similar presentations


Presentation on theme: "B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400."— Presentation transcript:

1 B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400 005 E-mail: bsn@tifr.res.inbsn@tifr.res.in Design of electronics, trigger and data acquisition system for the proposed INO prototype detector

2 XVI DAE-BRNS Symposium on HEP SINP, Kolkata Nov 29 - Dec 3, 20042 INO prototype detector Detector and signal specifications –Detector dimensions: 1m X 1m X 1m –14 layers of RPCs with 6cm iron plates interleaved. –Two signal planes orthogonal to each other and each having 32 pick-up strips –Total channels = 32 X 14 X 2 = 896 –Pulse height = 100 to 300mV; Rise time = < 1 ns –Pulse width = ~50ns; Rate ~ 1KHz Trigger information –Expected trigger rate is few Hz –Required Trigger logic is m X n fold, where –m = 1 to 4; no. of consecutive channels in a layer –n = 5 to 1; no. of consecutive layers with m fold in each layer –ie m x n = (1 x 5) OR (2 x 4) OR (3 x 3) OR (4 x 2) Information to be recorded on a trigger –Absolute arrival time of the trigger –Track identification (XYZ points in RPC layers) –Direction of track ( TDC information) –Miscellaneous information and calibration data Monitoring health of the detector

3 XVI DAE-BRNS Symposium on HEP SINP, Kolkata Nov 29 - Dec 3, 20043 Readout scheme for prototype

4 XVI DAE-BRNS Symposium on HEP SINP, Kolkata Nov 29 - Dec 3, 20044 32-channel front-end module

5 XVI DAE-BRNS Symposium on HEP SINP, Kolkata Nov 29 - Dec 3, 20045 Prototype detector trigger logic

6 XVI DAE-BRNS Symposium on HEP SINP, Kolkata Nov 29 - Dec 3, 20046 Readout scheme for final detector The keywords are channel count and fast timing


Download ppt "B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400."

Similar presentations


Ads by Google