This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. Michigan State.

Slides:



Advertisements
Similar presentations
Update from NSAC NuPECC Long Range Planning Meeting Susan J. Seestrom NSAC Chair U.S. Department of Energy Office of Science.
Advertisements

ISAC Physics Working Group Convenors Malcolm Butler and Barry Davids.
The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
Slid 1 Brad Sherrill, HRIBF Workshop 2009, Slide 1 Facility For Rare Isotope Beams Bradley M. Sherrill FRIB Michigan State University.
Γ spectroscopy of neutron-rich 95,96 Rb nuclei by the incomplete fusion reaction of 94 Kr on 7 Li Simone Bottoni University of Milan Mini Workshop 1°-
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
EJB April 2006 Nuclear Science: The Mission Understand the origin, evolution, and structure of the baryonic matter of the Universe Cosmic accelerationRotation.
Higher Order Multipole Transition Effects in the Coulomb Dissociation Reactions of Halo Nuclei Dr. Rajesh Kharab Department of Physics, Kurukshetra University,
Reaction rates in the Laboratory Example I: 14 N(p,  ) 15 O stable target  can be measured directly: slowest reaction in the CNO cycle  Controls duration.
NUCLEAR STRUCTURE PHENOMENOLOGICAL MODELS
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
F. Pellemoine PASI Workshop - April 3-5, 2013 Capabilities of NSCL - FRIB.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Facility Developments
N. Saito The RISING stopped beam physics meeting Technical status of RISING at GSI N. Saito - GSI for the RISING collaboration Introduction Detector performance.
Long Range Plan (LRP) & EDM Nuclear Physics LRP is prepared every 5- 6 years Provides guidance to funding agencies w.r.t. scientific and funding priorities.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Nuclear Astrophysics with the PJ Woods, University of Edinburgh.
Decay Spectroscopy Working Group Nuclear Structure Theory Morten Hjorth-Jensen – Shell Structure and Interactions Ivan Borzov – Theory of  Decay Applications.
N=126 factory Guy Savard Scientific Director of ATLAS Argonne National Laboratory & University of Chicago ATLAS Users Meeting ANL, May 15-16, 2014.
Georg Bollen Michigan State University Facility for Rare Isotope Beams under Construction.
Heavy Ion Accelerator for RIB KoRIA in International Science & Business Belt S. W. Hong Sungkyunkwan University S. W. Hong Sungkyunkwan University Nov.
Gary Westfall1 The Rare Isotope Accelerator Program at MSU Gary Westfall Michigan State University With contributions from Konrad Gelbke Presentation.
HITES, June 2012 Status of reaction theory for studying rare isotopes Filomena Nunes Michigan State University.
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Astrophysical p-process: the synthesis of heavy, proton-rich isotopes Gy. Gyürky Institute of Nuclear Research (ATOMKI) Debrecen, Hungary Carpathian Summer.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
-NUCLEUS INTERACTIONS OPEN QUESTIONS and FUTURE PROJECTS Cristina VOLPE Institut de Physique Nucléaire Orsay, France.
Pygmy Dipole Resonance in 64Fe
High Energy Nuclear Physics and the Nature of Matter Outstanding questions about strongly interacting matter: How does matter behave at very high temperature.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
Yu. Oganessian FLNR (JINR) PAC–meeting, June 22, 2009, Dubna Experimental activities and main results of the researches at FLNR (JINR) Theme: Synthesis.
Fundamental Interactions Physics & Instrumentation Conclusions Conveners: P. Mueller, J. Clark G. Savard, N. Scielzo.
Curtis A. Meyer Nuclear Science in the United States The Core of Matter The Fuel of Stars.
Radiation damage calculation in PHITS
Some aspects of reaction mechanism study in collisions induced by Radioactive Beams Alessia Di Pietro.
ISOLDE-RISP meeting ~ ~20 Rare Isotope Science Project Sun Kee Kim Rare Isotope Science Project (RISP) Institute for Basic Science.
W. Nazarewicz. Limit of stability for heavy nuclei Meitner & Frisch (1939): Nucleus is like liquid drop For Z>100: repulsive Coulomb force stronger than.
Nuclear and Radiation Physics, BAU, 1 st Semester, (Saed Dababneh) Nuclear and Radiation Physics Why nuclear physics? Why radiation.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
The RIA Users Organization (RIAUO) Witold Nazarewicz (Tennessee) EURISOL Week, CERN, November 2006 History The Mission Organization Activities Perspectives.
1 CNS summer school 2002 The RI-Beam Factory and Recent Development in Superheavy Elements Search at RIKEN ◆ Brief introduction to the RI Beam Factory.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Welcome– 10/17 Collect Lab Reports Big Bang Theory and Life Cycle of the Star Notes Nuclear Chemistry Notes HW: NONE!
The TRI  P programme at KVI Tests of the Standard Model at low energy Hans Wilschut KVI – Groningen Low energy tests e.g. Time reversal violation precision.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Introduction to the Working Groups: Preparing the Strategic Plan Robert V. F. Janssens Scientific Director of the ATLAS Facility Physics Division Director.
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
Slid 1 Bradley Sherrill Nuclear Physics in Astrophysics V, Slide 1 Radioactive Beams and Exotic Nuclei – New Facilities and Future Possibilities for Astrophysics.
Slid 1 Brad Sherrill Beihang University November 2011, Slide 1 Nuclear Physics in North America Beihang University Bradley M. Sherrill Michigan State University.
How can one produce rare isotopes? Question Slid 3 Hendrik Schatz NNPSS 2012, Slide 3 Rare Isotope Production Techniques: Uniqueness of FRIB Target spallation.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Astrophysics Experiments at FRIB Dan Bardayan (ORNL)
DOE Accelerator Safety Workshop 2017 Bob Lowrie
Witold Nazarewicz (HRIBF scientific director)
Jefferson Lab Overview
The RIA Users Organization (RIAUO)
Nuclear Physics -- Today and Tomorrow From the infinitely strong –
the s process: messages from stellar He burning
Introduction to Jefferson Lab
Facility for Rare Isotope Beams Update
SOLID Collaboration Meeting
Presentation transcript:

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State University designs and establishes FRIB as a DOE Office of Science National User Facility in support of the mission of the Office of Nuclear Physics. Brad Sherrill for the FRIB Laboratory and Project Team 1 June 2012 Facility for Rare Isotope Beams: Status and Capabilities

 Introduction – Science and capabilities of FRIB  Overview of the FRIB project (400 kW 200 MeV/u heavy-Ion linear accelerator)  Science program  Summary Outline Sherrill NN2012, Slide 2

Introduction: FRIB Scientific Program Properties of nuclei Develop a predictive model of nuclei and their interactions Many-body quantum problem: intellectual overlap to mesoscopic science, quantum dots, atomic clusters, etc. The limits of elements and isotopes Astrophysical processes Origin of the elements in the cosmos Explosive environments: novae, supernovae, X-ray bursts … Properties of neutron stars Tests of fundamental symmetries Effects of symmetry violations are amplified in certain nuclei Societal applications and benefits Bio-medicine, energy, material sciences, national security, Slide 3Sherrill NN2012

FRIB Isotope Production Scheme Cartoon of the isotope production process at FRIB – projectile fragmentation or fission (Coulomb breakup, transfer, …) To produce a key drip line nucleus like 122 Zr the production cross section (from 136 Xe) is estimated to be 2x b (2 attobarns, 2x m 2 ) Nevertheless with a 136 Xe beam of 8x10 13 ion/s (400 kW at 200 MeV/u) a few atoms per week can be made and studied (>80% collection efficiency) For comparison: Element 117 production cross section was 1.3 ( ) pb (1.3x b) (Oganessian, Yu. Ts. et al PRL 104 (2010) ) Few x m 2 is on the order of 100 MeV neutrino-electron elastic scattering cross sections projectile target Sherrill NN2012, Slide 4

The Reach of FRIB Sherrill NN2012, Slide 5 Separated fast beam rates Theory is key O. Tarasov LISE++

Fast beams (>100 MeV/u) Decay studies, knockout, Coulomb excitation, nuclear structure, limits of existence, EOS of asymmetric matter Stopped beams (0-100 keV) Ion thermalization - fast, efficient Precision experiments – masses, moments, atomic structure, symmetries Reaccelerated beams ( MeV/u) Ion thermalization and reacceleration Detailed study of nucleus-nucleus collisions with exotic nuclei Astrophysical reaction rates FRIB Features: Fast, Stopped, and Reaccelerated Beams Sherrill NN2012, Slide 6 Talks of T. Otsuka, G. Hagen, …

The Number of Isotopes Available for Study Sherrill NN2012, Slide 7  Estimated Possible: Erler, Birge, Kortelainen, Nazarewicz, Olsen, Stoitsov, to be published, based on a study of EDF models  “Known” defined as isotopes with at least one excited state known  Below Z=90 FRIB will be able to make >80% of all possible isotopes

Overview of the FRIB Facility, Slide 8Sherrill NN2012 Existing NSCL Target Front End Cryogenic Facility Linac Support Accelerator Systems

Rendered Perspective Southeast View Sherrill NN2012, Slide 9

FRIB Layout, Slide 10Sherrill NN2012 Target Folding Segment 2 Linac Segment 3 Linac Segment 1 Beam Delivery System Front End Reaccelerator Linac Segment 2 Fast Beam Area Gas Stopping Stopped Beam Area Reaccelerated Beam Area Fragment Separator Folding Segment 1

FRIB Leadership (not complete)  T. Glasmacher (FRIB Project Leader)  B. Bull (Conventional Facility Division Director)  J. Wei (Accelerator Division Director) Y. Yamasaki (Deputy) A. Facco, K. Saito (SRF) F. Casagrande (Cryogenics)  G. Bollen (Experimental Systems Division Director) A. Zeller (Magnets) M. Hausmann (Fragment Separator) F. Pellemoine, W. Mittig (Targets) R. Ronningen (Radiation Transport)  Konrad Gelbke (Lab Director), Brad Sherrill (Chief Scientist)  Collaboration with many national and international partners: ANL, BINP, BNL, FNAL, GSI, INFN, JLAB, KEK, LANL, LBNL, ORNL, SLAC, SOREQ, SANDIA, RIKEN, TRIUMF FRIB Project Leadership Team Sherrill NN2012, Slide 11

Driver Linear Accelerator  Tunnel is 550 ft long 70 ft wide 25 ft underground, Slide 12Sherrill NN2012 Beam Delivery System Linac Segment 3 Front End Linac Segment 1 Folding Segment 1 Linac Segment 2 Folding Segment 2

Isotope Production Area Target and Fragment Separator, Slide 13Sherrill NN2012 Target Beam Dump Preseparator (First Stage) Second and Third Stage Rare Isotope Beams to Experiments Primary Beam from Driver Linear Accelerator Separator Length 96 m M Hausmann, G Bollen

FRIB Preseparator 400 kW Beam Power Requirement, Slide 14Sherrill NN2012 5m Targe t SC Quadrupoles RT Multipole SC Dipoles Beam Dump and Fragment Catchers Beamline from Linac Momentum compressio n wedge RT Multipole SC Quadrupoles Beam Dump #2 Location  Challenges: beam power densities, radiation damage, activation, … G Bollen

 Fast, stopped, and reaccelerated beam capabilities (unique)  ReA12 experimental hall is ready for occupancy  ReA12 is not fully funded but was well reviewed by NSF, MSU will move forward with ReA6  Room for 3-4x expansion of the experimental areas Overview FRIB Reaccelerators, and Experimental Stations 30 meters Sherrill NN2012, Slide 15

 Space available for various upgrade options Higher energy ISOL targets Light ion injector (17 or 200 MeV/u) Multi-user simultaneous operation  Tunnel penetration locations identified in facility design for these upgrades Science-driven Upgrade Opportunities Light ion injector upgrade option 2 3 He +, 195 MeV/u Energy upgrade to ≥ 400 MeV/u for all ions (add 12 cryomodules, and improved performance of λ/2 cavities) ISOL targets 3 He, 400 MeV/u Multiuser capability Light ion injector upgrade option 1 3 He +, 17 MeV/u Sherrill NN2012, Slide 16 Glasmacher, Yamazaki, Wei

 MSU Independent Review March 13-16, 2012 Key Charge: Is the FRIB project ready to proceed to CD-2/3A? Answer: Yes. The design is adequately mature to support the Performance Baseline and the start of civil construction. The cost, schedule and contingency are valid for this scope of work.  DOE Project Review April 24-26, 2012 Charged by the Office of Nuclear Physics, the review committee assessed all aspects of the FRIB Project - technical, cost, schedule, management, environment, safety, health, and quality assurance All charge questions to the committee were answered affirmatively at the review closeout session – ready for start of civil construction Final report expected in the coming weeks Favorably Reviewed by MSU and DOE Sherrill NN2012, Slide 17

 Conceptual designcompleted 9/2010 (CD-1)  Preliminary design CD-2/3A (civil) review in April 2012  Civil construction begins2012 Pending DOE approval  Final design CD-3B (technical) review in 2013  Technical construction begins2013  Early project completion2019  Project completion2021  Total project cost $680M ($585 Federal) FRIB On Track, Moving Toward Construction, Slide 18Sherrill NN2012

FRIB Site Ready for Civil Construction to Begin  Utility relocation and site preparation continue on schedule; substantially completed in April, final completion in December 2012  Pictured above, installation of underground electrical and communication concrete-encased duct bank including new vaults (left), and installation of class II sand backfill at new steam tunnel (right) Sherrill NN2012, Slide 19

 Users are organized as part of the independent FRIB Users Organization FRIBUO has 1227 members (92 US Colleges and Universities, 10 National Laboratories, 53 countries) as of 16 April 2012 Chartered organization with an elected executive committee (Chair is Michael Smith, ORNL) FRIBUO has 20 working groups on experimental equipment  Science Advisory Committee Review of equipment initiatives (Feb. 2011) Review of FRIB Integrated Design (March 2012)  Low-Energy Community Meeting with NS2012 at ANL Aug. FRIB Users Organization August 2011 Joint Users Meeting 284 participants fribusers.org Sherrill NN2012, Slide 20

Nuclear structure:  Model and accurately describe nuclei and their reactions.  For example, we want to develop the ability to calculate with sufficient precision reactions like 7 Be(p,  ) 8 B (responsible for source of neutrinos from the core of the Sun) from first principles. (e.g. Navratil, Roth, Quaglioni PLB 2011)  This goal is very relevant to many sciences and applications. Scientific Goals Sherrill NN2012, Slide 21

 Open questions What are the correct degrees of freedom to model nuclei? How do we model the nuclear force? How do we understand the nuclear force in terms of QCD? Are DFT approaches used in chemistry and advanced materials applicable?  Approaches (part historical, part current) Liquid Drop Model – scattering experiments show all nuclei have approximately the same density Bohr Hamiltonian (later IBM) – description of rotational and vibrational features of nuclei Independent particle models, Shell Model (based on effective interactions) Hartree-Fock (Bogoliubov) Effective potentials from 2-body scattering data  Experiments with rare isotopes over the past 10 years have demonstrated the problems with these approaches The Challenge of Modeling Atomic Nuclei Sherrill NN2012, Slide 22

Theory Roadmap – 2007 NSAC Long Range Plan  Step 1: Use ab initio theory and study of exotic nuclei to determine the interactions of nucleons in light nuclei and connect these to QCD by comparison to lattice calculations of NN and NNN forces (Fodor)  Step 2: For mid-mass nuclei use configuration space models. The degrees of freedom and interactions must be determined from exotic nuclei (Otsuka, Hagen, …)  Step 3: Use density functional theory to connect to heavy nuclei. Exotic nuclei help determine the form and parameters of the DFT. Toward Understanding the Nuclear Force Step 3 is the one that will answer the question about what are the heaviest elements. Sherrill NN2012, Slide 23

 By measuring the differences we learn about the history of the star  The process that makes Barium (Ba) in early stars must be different from the main process that makes Iron (Fe)  There are many mysteries, only one example is that the [Ba/Fe] is not understood in early stars Chemical History of the Universe – the Fossil Evidence of the First Stars HERES Survey – Barklem et al. (2005) Sun [Ba/Fe] = [Fe/H] = 0 Sherrill NN2012, Slide 24

 Big Bang Nucleosynthesis  pp-chain  CNO cycle  Helium, C, O, Ne, Si burning  s-process  r-process  rp-process  νp – process  p – process  α - process  fission recycling  Cosmic ray spallation  pyconuclear fusion  + others There are a number of nucleosynthesis processes that must be modeled AZAZ fission (α,γ) β +, (n,p) β-β- (p,γ) (α,p) (n,2n) (n,γ) (γ,p) Sample reaction paths Sherrill NN2012, Slide 25

Angular correlations in β-decay and search for scalar currents o Mass scale for new particle comparable with LHC o 6 He and 18 Ne at /s Electric Dipole Moments o 225 Ac, 223 Rn, 229 Pa (few 1000x more sensitive than 199 Hg; 229 Pa > /s) Parity Non-Conservation in atoms o weak charge in the nucleus (francium isotopes; 10 9 /s) Unitarity of CKM matrix o V ud by super allowed Fermi decay o Test the validity of nuclear corrections Tests of Nature’s Fundamental Symmetries e γ Z 212 Fr G. Savard Sherrill NN2012, Slide 26

 2010 Santa Fe Workshop on Applications of Isotopes from FRIB  2012 Workshop at NSCL, July Sample Interesting Isotopes from FRIB and uses NuclideHalf-lifeUse 32 Si153 yOceanographic studies; climate change 221 Rn25 mTargeted alpha therapy 225 Ra/ 229 Po15 dEDM search in atomic systems 85 Kr11 y High specific activity 85 Kr for nuclear reaction network studies, e.g., s-process 44 Ti60 yTarget and ion-source material 67 Cu62 hImaging and therapy for hypoxic tumors Sherrill NN2012, Slide 27

 FRIB next-generation high-power RIB facility for new science opportunities with rare isotopes Properties of nucleonic matter Nuclear processes in the universe Tests of fundamental symmetries Societal applications and benefits  FRIB features Highest-power heavy ion linac High-performance fragment separator with 400 kW production area Stopping and reacceleration Provisions for isotope harvesting and multi-user capability  FRIB project ready to start civil construction and prepared to baseline Plan for starting civil construction in 2012  Broad science program - Goals of understanding the nuclear force, the origin of elements, testing nature’s symmetries and developing new applications  Strong FRIB user group in place Summary, Slide 28Sherrill NN2012