Standardised Work: Creating Workpackages. The 2 Routes to Workpackage Implementation Identify Work Sequence Identify Categories of Work Calculate Takt.

Slides:



Advertisements
Similar presentations
Performance Management System
Advertisements

Tactical Implementation Plans (TIP’s)
ISSUE RESOLUTION & ESCALATION Training Pack
Standard Work Making the “new way” become the standard way
Guide to Business Improvement Tools
Tools & Techniques Plan-Do-Review PLAN DO REVIEW.
Why we’re doing this together… We are here to focus on the packaging and delivery of the astonishing things that you do.
Z26 Project Management Work Breakdown Structure (WBS) Graham Collins, UCL
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Supplier Development Kaizen Implementation Kit
Five Steps to Lean 1. Define end-customer value for a specific product specific capabilities specific price specific time 2. Identify entire value stream.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
The Production Process
MSE507 Lean Manufacturing
Project Management Tools Utilized in Tech Transfers Morning Session #1 Robert Beall, PMP.
Standardized Processes and Procedures. Standardization Supports StabilityStandardization Supports Stability  NOT the same as “work standards”  Faster.
SSI Sustainable Solutions International, LLC Developers of SPM ™ Preparing the Workplace for the 21 st Century! the 21 st Century! Preparing the Workplace.
Value Stream Mapping.
Program Management Satisfy requirements of all individual projects with minimal resources Human resource is the most expensive Leadership Methods of documenting.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 5 Value Stream Mapping
Release & Deployment ITIL Version 3
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
Key Performance Indicators - KPI’s
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Office of Project Management Metrics Report Presentation
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
ISSUE RESOLUTION & ESCALATION Training Pack
Takt Time Training Pack.
Standard Business Roadmap Step by Step Guide. Standard Business Roadmap The acid test for ANY system is; “Does it work ?” This system is no different.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
1 Workshop sessions: day two ● CD infrastructure ● CD advisors ● Quality and contract management ● Referral pathways and standardised service ● Discussion.
Lean Manufacturing Takeaways SCLC / ECC Spring Meeting April 26 th, 2007.
Information Management Programme Management Managing Finances, Resources, and Information.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 6 Project Communications Management.
Service Transition & Planning Service Validation & Testing
Switch off your Mobiles Phones or Change Profile to Silent Mode.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Airbus Production System
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
United Nations Statistics Division Registry of national Classifications.
Managing CMMI® as a Project
CUBIT Session 6 Capacity Planning Value added flow Future State Visual Monitors KPI.
External examiner induction Alison Coates QA Manager (Validation & Review)
Benchmarking Partnerships Connecting Best Practices People & Ideas 1.Select the Key Priority / Cross Functional Team of Influencers 2.Mission / Vision.
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN24 8TY – – Tel: Planning Improvement Last Planner Richard.
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
Process Confirmation & Go, Look, See. Agenda Introduction to Process Confirmation The Format Completion Example Deliverable Go, Look, See ‘T’ card system.
Preparing for Winter 2011/12 Guidance Overview Stuart Low Planning Manager Scottish Govt NHSScotland Business & Performance Mgt Team.
Introducing Project Management Update December 2011.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
1 Lean Manufacturing Overview Lean Manufacturing Overview
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Software Process Models.
Process Mapping Overview 10/8/ Agenda Overview of Processes Core and Support Processes Process Redesign Process Mapping Concepts Information Model.
LESSON 4 Process Improvement – Lean
Process engineering TAKT vs CYCLE.
Value Stream Mapping (VSM) Training
Future State Improve Kaizen Facilitation.
Work Measurement and Lean Application
Presentation transcript:

Standardised Work: Creating Workpackages

The 2 Routes to Workpackage Implementation Identify Work Sequence Identify Categories of Work Calculate Takt Time Apply To Current State Line Balance Align To Programme Plan Line Balance Board Creation Performance Management Workpackages in Place? NoYes Common Steps Route A Workpackages Not In Place Implementation Involves: -Data analysis & capture -Line balance creation -Calculation of Takt Time -Balancing to Takt -Alignment to Programme Plan -Inclusion into Performance Management System Use when: -There’s a requirement to match pace of production to customer demand -Trying to create man/material flow Route A Route B Workpackages In Place Implementation involves: -Calculation of Takt Time -Rebalancing to suit new Takt -Re-alignment to Programme Plan -Inclusion into Performance Management System Use when updating Workpackages: - Rate change -Level of resource change -Removal of Waste/Reduction of NVA Route B

Critic al to WkPk gs Discipline ‘C’ Critic al to WkPk gs Discipline ‘B’ Build, Time, Support, Other… Discipline ‘A’ Route A: Identify Work Sequence & Categories of Work 1. Map the current operational processes - Identify ‘who does what & when’ (Tasks & Times) - Identify Critical Build Sequence - Identify the categories of work - Value Added, Non-Value Added & Waste Activities 2. Collect issues with current processes - Build (Sequence of, process interference etc) - Time (questioning the current package allowance etc) - Support (Engineering, Quality, Support, Operations etc) - Other (anything else...) - Create Tactical Implementation Plans to resolve issues

Route A: Line Balance Board Creation 1. Transfer operational processes onto strips - Opportunity to discuss & resolve ‘Build’ issues - Use Coloured magnets/paper strips to show the categories of work (VA, NVA, Waste)

Route A/B: Calculate Takt Time Takt = Total Time Available*(* minus agreed losses – Time Total Customer Demandlunch, breaks etc) 1. Calculate the ‘drumbeat’ for production - Calculate the frequency at which the production system must produce quality product - In the above example, a Unit must be produced every 25 hours to satisfy the requirement of 12 Units/Month Example: Takt = 300 Hours/Month*(* minus agreed losses – Time 12 Units/Monthlunch, breaks etc) = 25 Hours

Operators Time Operators Time Takt Time Route A/B: Apply Takt Time to Current State Line Balance Re-Balance 1. Rebalance processes to suit Takt Time - Maintain critical build sequence & re-balance ‘floating’ tasks - Identify manning & capacity requirements to work to Takt Time Operators Time Takt Time WP1 WP4 WP2 WP5 WP3 WP6 2. Create Workpackage documentation - Create workpackage documentation according to team/workstation requirements - Agree a suitable management time frame for updating of status (i.e. 1 hour, 1 shift etc)

Route A/B: Align to Programme Plan Date Workpackages Workstations Manning Levels 1. Create high-level Workpackage Schedule document - Visually represent where & when each Workpackage is scheduled to be completed - Shows level of resource required when working to Takt Time

TEAM BOARD : STATION 99 QUALITYCOSTDELIVERYPEOPLE SCRAP CONCESSIONS / DEFECTS PRODUCTIVITY SKILLS MATRIX ATTENDANCE HEALTH & SAFETY TAKT ADHERENCE 5C CURRENT PREVIOUS LOCAL INFORMATION DISRUPTIONS SHIFT : TEAM LEADER : SIGN OFF PRD File ISSUES RESOLVED Route A/B: Performance Management 1. Display Workpackage documentation at the place of work - Increase Visual Management at the workstation - Process ownership clear with key stakeholders involved - Workpackage Status to be updated at the agreed management time frame interval - Issues regarding workpackage adherence to be raised, resolved & escalated if necessary from this location

Route A/B: Workpackages Created Identify Work Sequence Identify Categories of Work Calculate Takt Time Apply To Current State Line Balance Align To Programme Plan Line Balance Board Creation Performance Management Workpackages in Place? NoYes