The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
Concept of the PANDA Detector for pp&pA at GSI Physical motivation for hadron physics with pbars The antiproton facility Detector concept Selected simulation.
03 Aug NP041 KOPIO Experiment Measurement of K L    Hideki Morii (Kyoto Univ.) for the KOPIO collaborations Contents Physics Motivation.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
Medium heavy Λ hyper nuclear spectroscopic experiment by the (e,e’K + ) reaction Graduate school of science, Tohoku University Toshiyuki Gogami for HES-HKS.
HARP for MiniBooNE Linda R. Coney Columbia University DPF 2004.
GEANT4 Workshop 2001 HARP and GEANT4 1 & Pedro Arce (CERN/IFCA-Santander) Vladimir Ivantchenko (CERN/Budker Institute) GEANT4 Workshop 5th July 2001.
East Area Secondary Beam Control User Guide L.Gatignon / AB-ATB 12 June 2008.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
A search for deeply-bound kaonic nuclear states in (in-flight K -, N) reaction Hiroaki Ohnishi RIKEN.
May 12, 2009Włodek Guryn1 Physic Program with Tagged Forward Protons at STAR Single Diffraction Dissociation (inclusive SDD cross section, leading  0.
Test-beam facility at IHEP CAS An Guangpeng, Li Jiacai CEPC-SPPC Study Group Meeting IHEP
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Test beams status  Protvino source: V. Ammosov  Dubna source: P.Rukoyatkin, E.Strokovsky Václav Vrba Institute of Physics, AS CR, Prague – LCTW09, LAL,
HARP measurements of pion yield for neutrino experiments Issei Kato (Kyoto University) for the HARP collaboration Contents: 1.HARP experiment Physics motivations.
CERN Test Beam Update and Schedule
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
The Polarized Internal Target at ANKE: First Results Kirill Grigoryev Institut für Kernphysik, Forschungszentrum Jülich PhD student from Petersburg Nuclear.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
H A R P A Hadron Production Experiment at the Proton Synchrotron at CERN Motivation for the HARP experiment The HARP Detector MiniBooNE and HARP.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
L. Nemenov, EXA05 Using  -  and  -K atoms for the experimental check of low-energy QCD L. Nemenov (CERN, Switzerland) Presented by L. Tauscher Basel.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Christos Lamboudis HEP April. Athens Study of MDT response to neutrons and possible ageing effects Do we really need to worry about neutrons? Do.
Understanding the 3 He Nuclei: Asymmetry Measurements in Quasi- Elastic Ge Jin University of Virginia For the E Collaboration.
Radiation studies for the MI collimation system and ILC vertical cryostat test area December 13, 2006 Igor Rakhno Accelerator Physics Department.
SPSC, 26 March 2002 A. De Min, HARP STATUS REPORT 1 HARP STATUS REPORT A. De Min for the HARP Collaboration SPSC Open Session 26 March 2002.
Muon Facility at J-PARC Proton Driver Efficiency WS 29/Feb/2016
Status of the forward tracker design
Outlook by the Physics Coordinator
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Towards a Unified Environmental Monitoring,
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
of secondary light ion beams
of secondary light ion beams
CERN Testbeam facilities
The Proton Beam for the neutron Time Of Flight facility
Revival of the cern ps neutrino beam
A summary of world-wide test beam facilities
PS East Area operation…
2003 test beam with 25 ns bunched muons
Present and Future test facilities for High-intensity Targetry CERN
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
How to control the local beam density
The East Area beam-lines
Presentation transcript:

The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian

The East Area in a few numbers n 28 weeks (~4700 hours) scheduled operation n 34 different users on 5 beam lines in 2000 –2 physics experiments –4 test beam areas –4 facilities for irradiation tests n >3.8 million spills delivered to the East Area n ~8.8x10 17 Protons for all user in the East Area

The Facility 5 beam lines for 8 areas in 1 building

n 4 general purpose beam lines: –T7 (south branch) –T9, T10, T11 (north branch) n 2 physics experiments: –DIRAC, T8 ( 21 institutes) –HARP, T9ext. (22 institutes) n 4 Irradiation facilities: –3 at T7 (primary protons at 24 GeV/c) –1 at T8 (secondary neutrons at 1 Mev)

Beam sharing & Triple PPM Triple PPM: One power supply can, depending on the destination, pulse with one of the 3 pre-defined values. 100%  South 50%  South 50%  North 35%  North 65%  South irrad. 100%  North

Major changes Auto-destination: The MTG was updated to be able to calculate the beam destination as a function of the beam request in the different zones  More flexible use of PLS Combined operation: Two separate experimental areas n-TOF and the East Area are supplied by two different beams which are generated on one magnetic cycle  More efficient use of PLS time

Irradiation Facilities T7 beam line, 24 GeV/c ‘high’ intensity primary proton beam Irradiation surface 20mm x 20mm typical intensity ~ 2.5x10 11 over 400ms

DIRAC (PS 212) T8 beam line, 24 GeV/c low intensity primary proton beam Courtesy of the DIRAC team Magnetic double arm spectrometer. Aim: Measure the lifetime of [pi+pi-] atoms in the ground-state.

HARP (PS 214) T9 beam line, 2 GeV/c – 15 GeV/c secondary proton beam drift chambers cherenkov TOF wall electron identifier spectrometer magnet TPC solenoid magnet forward trigger forward RPC muon identifier beam Courtesy of the HARP team

HARP’s Planning Run 2000 T9 beam line optics tested. A four week technical run with partial set-up of the experiment. Physics run 2001 Measurements with solid and cryogenic targets, 2001 physics run 2002 and beyond... Measurements with incoming Deuterium and Helium ???

T9 beam line optics for HARP Courtesy of A-S. Muller Horizontal beam size 1.28m before target as function of momentum Vertical beam size 1.28m before target as function of momentum

What will be done next year ? n 29 weeks of East Area operations: –HARP will be using beam for 203 days –DIRAC gets 171 days of beam time –T7 irrad. will irradiate samples during 67 days –About 30 user will use the East Area this year n Improve beam quality and reduce setting-up and ‘switch-over’ time n Improve documentation on the web

Future ‘projects’ n Next year: n Long term: –Three basic periods magnetic cycle ? –Low frequency ripple compensation. –Semi-automatic dispersion sweep compensation for DIRAC. –Semi-automatic dispersion sweep enhancement for the Irradiation facilities.

Three basic period magnetic cycle EASTB (2bp) EASTBISOLDE EASTB EASTB (2bp) ISOLDE PSB: PS: EASTB (3bp) EASTB TOF ISOLDE ZERO ISOLDETOFISOLDETOF PSB: PS: Total spill length ~ 1.4 sec for 7.2 sec of PLS time. 19 % Total spill length ~ 1.8 sec for 3.6 sec of PLS time. 50 % Three cycles for Isolde Example: Two extra dedicated cycles for TOF

Questions ?..or brilliant ideas ?