1 ECS CALO HV Control CALO Piquet Training Session 21.10.09 Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.

Slides:



Advertisements
Similar presentations
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.
Advertisements

Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 TRT DCS: Shifter Basics Main goal – make sure TRT Detector is in good condition: - TRT FSM node: state READY and status OK - no alarms in the alarm screen.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
ATLAS MDT HV – LV Detector Control System (DCS)
The LHCb Run Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction  Start HV system and recover after power cut  Channel masking  ECS HV control of the PS and SPD.

2 ECS CALO HV Control The ECS CALO HV control projects have been developed in close contact with the LHCb Online group. There are two type of the projects. One is for ECAL/HCAL and second for PS/SPD. There are six front-end PVSS HV projects: PRSHVC1, PRSHVA1 on online PCs PSDAQHVC01W and PSDAQHVA1W; ECHVC1, ECHVA1 on online PCs ECHVC01W and ECHVA1W; HCHVC1, HCHVA1 on online PCs HCDAQHVC01W and HCDAQHVA1W; Current projects allow: 1.Work within the LHCb FSM hierarchy. Now the HV are controlled from the new top level LHCb HV panel; 2. Set HV for individual PMT, group of PMTs or set HV for all detector channels with a desirable ramp time factor and perform a fast emergency HV OFF; 3.Prepare and save the HV recipes for different activities using the CALO specific database ; 4.Mask individual channels or exclude HV control board from FSM control; 5.The projects monitor following parameters : a)HV control signals, and produce the warnings in case if the set and read values are different more than 3%; b)100 V and LV power supplies status for group of PMT’s, and produce the errors if values are out of the limits; Introduction CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

3 ECS CALO HV Control ECAL/HCAL HV_LED_DAC board and PS/SPD HV crate. HARDWARE ECAL+ HCAL HV system includes 40 HV_LED_DAC boards for HV control of about 7500 CW bases. 2 HV crates produce the high voltages for 200 MAPMT’s of the PS and SPD sub-detectors. Hardware interface to the ECS is Specs mezzanine CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

4 ECS CALO HV Control There are three layers of the panels in the developed HV projects with dedicated functional meaning: I.Top level CALO HV panel shows a summary status of the HV and LV-MV power supplies powering the HV electronics of the calorimeter sub-detectors. From this panel one can control HV using standard FSM way. The panel is dedicated to the shift and CALO piquet operators. II.Top level sub-detector HV panel shows a power supply summary status, but mainly dedicated to manage the recipe creation and channel masking. Procedure of the recipe creation is very flexible. There are three possibility to create the HV recipe:  Load from a file;  Load from internal CALO DB;  Prepare recipe using the expert panels;  In the same time the panel includes a tool for the recipe values scaling. The panel is dedicated to the CALO piquet operators and experts. III. Low level panels are dedicated mainly to an expert operation and allow to control HV on the specific hardware groups, an individual channel and tune different monitoring parameters. (warning thresholds of the power supplies voltages, HV ramp-time coefficient, relay delay time...) CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

5 Screen-short of the top level panel of the LHCb HV control. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ ECS CALO HV Control Global LHCb FSM HV control HV control FSM options: Go_READY Go_STANDBY1 Go_OFF

6 Screen-short of the top level panel of the CALO HV Status (CA1 project). Additional status line with information about the number of switched ON channels was added. There are three colours correspond to the detector HV status: blue – all channels are OFF; orange - WARNING! some channels is in ON state and others OFF; green – all channels are ON; CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ ECS CALO HV Control 2 powers Logical AND 3 powers Logical AND Global CALO HV Status

7 ECS CALO HV-LED Control System for piquet CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ For monitoring MV currents: Push Start -> I_reference from “Current MV” line will be copied and monitoring started; In case, if current is more or less of the I_reference on 10 mA the colour will be changed to yellow. LED monitoring info for showing LEDTSB and LED intensity boards status. If green the triggering is enabled, red if not. Screenshot of the top level CALO HV Status panel

8 ECS CALO HV Control Screen- short of the top level ECS-FSM hierarchy for CALO HV system with a trend plot of the middle voltage power supply current. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

9 How To: CALO HV power supply and ECS control Anatoli Konoplyannikov Q. What to do in case of the problems with HV system restarting? A.As was written in CALO HV tutorial, after rebooting PC and restarting a HV project, some times it is better to go through the main First Time initialization panel (one per each side of sub- detector) and perform Specs_Init and Set_HV_OFF actions (wait while it finished) and then close the panel. Some times it is useful to check the logout of a HV project. In case of normal running one can see the HVmonitoring script messages. If there is no any messages, one must restart the HVmonitoring script.

10 CALO HV Status bits for ODIN Screen short of the panel for CALO HV status Bits board monitoring and control Click on the button for open Panel. Measured Currents Min-Max Thresholds Final HV Status The Status is green when the power supply current is into a range between Min and Max threshold CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

11 ECS CALO HV Control Screen- short of the top level ECS-FSM hierarchy for CALO HV sub-systems. Control Unit Options for recipes creation HV and LED intensity scaling First time CALO HV system initialization panel. Now for experts only ! MV power Status with possibility set a monitoring range. Mean HV Settings and Readings CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Sub-detector HV Status Open panel for channel masking

12 ECAL/HCAL HV channel masking Panel For improving the calorimeter hot channels masking on the level of HV system the dedicated panel has been developed. There are five different addresses describing an individual detector cell: 1. Official detector naming area=O,M,I; X=0 – 64; Y=0 – 64; 2. Cell X, Y coordinate in mm; 3. Cell DAQ encoding detID<<14+area<<12+Y<<6+X; 4. FE channel address 10000*crate+100*slot+ ch; 5. HV board address 1000* board+channel; ECAL one side HV top level panel. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ 1.Find bad Channel address from Presenter 2. Find Cell 3. Mask Channel

13 ECS CALO HV Control Screen- short of the ECAL region (outer region) HV system control panel. FSM options: Go_READY Go_STANDBY1 Go_OFF CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Select & press LEFT There is a possibility to exclude a board from the FSM control

14 ECS CALO HV Control Screen- short of the ECAL HV board panel. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Device Unit Select & press LEFT Low level expert panels

15 ECS CALO HV Control Screen- short of the ECAL HV CW group control panel. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Select & press LEFT Low level expert panels

16 ECS CALO HV Control Screen- short of the ECAL one HV channel control panel. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Select & press LEFT Low level expert panels

17 New procedure of the CALO HV system recovery after power cut: Check FSM DCS tree is functional. Open the “CALO HV Status” panel for monitoring the HV initialization status. From FSM top level switch on all DCS power supplies for sub-detectors. Restart all CALO HV projects (PRSHVC1, PRSHVA1, ECHVC1, ECHVA1, HCHVC1,HCHVA1). There are three ways to do this. One is from Service+ of the dedicated online PCs and other one from shortcuts of the DetHVC1_Console and last one, not implemented yet, to use a script. Switch on the HV with needed recipe. Screen-short of the ECAL side C HV project console Last time the HV recovering after power cuts was rather painful ! CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Needed timing of the HV ramping up is defined in document prepared by Marie – Noelle !!!

18 ECS CALO HV Control Screen- short of the top level ECS-FSM hierarchy for PS/SPD HV system. There is suggestion to separate PS and SPD HV control from FSM tree ! PS/SPD HV system CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Options for recipes creation first time CALO HV system initialization

19 ECS CALO HV Control Screen- short of the PS/SPD HV crate panel. PS/SPD HV system CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ HV crate Info

20 ECS CALO HV Control Screen- short of the PS/SPD HV board panel. PS/SPD HV system CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

21 ECS CALO HV Control Screen- short of the PS/SPD one HV channel control panel. PS/SPD HV system CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/