April 14, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #8 Hector Silva Gustavo Diaz Ernest Tolliver Matt Ford.

Slides:



Advertisements
Similar presentations
TEAM #1 RYAN AGUDELO WILLIAM DAVIS DAVID KENNICK Microcontrolled Multi-Video Gaming Console Status Report #7 March 23, 2011 Objective: To create a gaming.
Advertisements

Step-by-Step: Set Margins Before you begin these steps, be sure to launch Word. 1.OPEN the proposal file for this lesson. 2.Delete the extra blank lines.
3D Graphical Display Ararat Adamian Brian McDonald Tyler Blair Adrian Williams.
Status Report #4 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.
Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
Natasha Benko, Kevin Jacobsen, Marcus LaRose, Scott Timme October 14, 2009 Our design will automatically calibrate your speedometer according to tire size.
Status Report #06 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Status Report #8 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 04/06/2011.
Description: Construction of a device and application to detect the failure of the lighting system. Delfino Amador Melissa Martinez Miguel Ramirez Sergio.
Status Report #3 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/6/2012 Design of an electronic system to track.
RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS Automatic Monitoring.
STATUS REPORT # 3 RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS.
THE AUTO-REMIND USB FLASH DRIVE March 31, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #6 Hector Silva Gustavo.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #3 February 6 th, 2012 Objective: To create an automated.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
MB race T ech mB 1 Antonio DeMendonca Albert Lopez Lourdes Alvarez Antony Acha November 14, 2011 mB 1 is a bracelet connected to a cellular phone via Bluetooth.
Status Report #1 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect September 17,
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Status Report #2 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Status Report #07 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
THE AUTO-REMIND USB FLASH DRIVE January 25, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #2 Hector Silva Gustavo.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 4/2/2012 Design an electronic system to track the distance of an object using Bluetooth.
STATUS REPORT #3 DIGITAL UNDERWATER COMMUNICATION (DUC) GROUP 5 Jeff Prevost, Alexandra Camacho, Jennifer Moyer, Robert Mills February 16, 2009.
Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.
Status Report #08 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 3/26/2012 Design an electronic system to track the distance of an object using Bluetooth.
{ Lost Object Locator Status Report #6, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application. Team.
THE AUTO-REMIND USB FLASH DRIVE January 25, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #2 Hector Silva Gustavo.
THE AUTO-REMIND USB FLASH DRIVE April 7, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #7 Hector Silva Gustavo.
Status Report #2 Autonomous Lawnmower Team 5 April Fowler Jose Manzanares Ranjith Raghunath Christopher Gerhardt 5 Feb 07 To design and implement an autonomous.
Bonitron HVAC Final Semester Report Alex Brown Cory Haugh Ajmer Dwivedi.
RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS Automatic Monitoring.
THE AUTO-REMIND USB FLASH DRIVE February 15, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #4 Hector Silva Gustavo.
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #4 February 13 th, 2012 Objective: To create an automated.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report 3 February 1 st, 2010.
1 Wireless LED Display ECE4007-L03 Mekre Mesganaw Mark Reed Paul Simmons Chris White March 12, 2009.
Status Report #2 Walking Charger By: Carlos Benitez, Meryem Fennich, Srinath Kota, Jacksario Rosario September 15 st 2010 Description: Battery charger.
Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 3/19/2012 Design an electronic system to track the distance of an object using Bluetooth.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
Status Report #6 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
STATUS REPORT #2 DIGITAL UNDERWATER COMMUNICATION (DUC) GROUP 5 Jeff Prevost, Alexandra Camacho, Jennifer Moyer, Robert Mills February 2nd, 2009.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
Status Report #4 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/13/2012 Design an electronic system to track the.
Emergency Calling System Status Report #7 Group #9 Cem Sahin Jassim Alemadi Eloy Esquivel Vikas Tailor Objective To build an automated emergency call system.
10/24/2010 Distributed Software Development. 10/24/2010 Content Recommendation and Reuse Current state – Alpha Prototype Hamid Riaz, Loredana Baračić.
{ Lost Object Locator Status Report #3, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application.
Status Report #8 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Status Report #6 March 19 th, 2012 Objective: To create an automated system that will monitor and enforce personal.
Emergency Calling System Status Report #8 Group #9 Cem Sahin Jassim Alemadi Eloy Esquivel Vikas Tailor Objective To build an automated emergency call system.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Proximity-Triggered Dog Training Collar Status Report #2 Distance detecting behavior correction dog collar 1/25/2012 Team 10: Hamad Aldossary Yagoob Alsarouj.
Proximity-Triggered Dog Training Collar Status Report 8 Distance detecting behavior correction dog collar 4/11/2012 Team 10: Hamad Aldossary Yagoob Alsarouj.
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
The Auto-Remind USB Flash Drive
Status Report 7 CAPS Cynthia Reyna David Rodriguez Cynthia Salas
Devon Johnson Fabio gomez Joelle Lawson
MicroMegas Mechanical Meeting --- Cern April 2014
The U.S.S.E Status Report #3 February 16th, 2009
USB flash drive TREVOR P BELINDA R IS201.
Devon Johnson Fabio gomez Joelle Lawson
The U.S.S.E Status Report #1 February 2nd, 2009
Presentation transcript:

April 14, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #8 Hector Silva Gustavo Diaz Ernest Tolliver Matt Ford

T HE A UTO -R EMIND USB F LASH D RIVE Solve the problem of so many Flash Drives being left behind in USB Ports. Overall Need 4/17/10 – Demo Posterboard 4/24/10 - $100k Competition Design Milestones

T HE A UTO -R EMIND USB F LASH D RIVE Tasks Completed -Cancelled USB Casing -PCB Layout Completed(Gerber files generated)

T HE A UTO -R EMIND USB F LASH D RIVE Tasks Completed -Expected total cost to manufacture $12 -Prototype ready to be demo’d

T HE A UTO -R EMIND USB F LASH D RIVE Ongoing/Pending Tasks -Working on Final Presentation Content -Working on Final Report -Working on Demo Poster Board

T HE A UTO -R EMIND USB F LASH D RIVE Upcoming Tasks -$100k Competition -Demo Day Presentation

T HE A UTO -R EMIND USB F LASH D RIVE Functional Block Diagram 90% 80%95% 80%

T HE A UTO -R EMIND USB F LASH D RIVE Schedule

T HE A UTO -R EMIND USB F LASH D RIVE Questions?