A Review of Policy Development Processes in the Asia Pacific Region Address Policy SIG APNIC 15, Taipei, Taiwan 27 February 2003.

Slides:



Advertisements
Similar presentations
Axel Pawlik. 4 th ASO GA Meeting, 24 April 2003, Santiago. Open Policy Process in the RIPE Region Axel Pawlik RIPE NCC.
Advertisements

Internet Resource Policy Evaluation Process. facilitates the advancement of the Internet through information and educational outreach allocates Internet.
Address Council Operations Santiago, Chile – April 2003.
The Regional Internet Registry System RIR 101 Ciudad de México November 2002 LACNIC III Overview Evolution Structure Activities and Functions IP Address.
RIRs, the NRO and ICANN Update - August So far The RIR boards have drafted an agreement to be undertaken between themselves to establish a Number.
1 IP Policy update - comparative status in all RIR regions Policy SIG 7 Sep 2006 APNIC 22, Kaohsiung, Taiwan Save Vocea.
1 [prop-054] Revision of APNIC-103-v001 NIR SIG 27 February 2008 APNIC 25, Taipei George Michaelson.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Members Meeting 27 October 2000 Brisbane, Australia.
Major Activities in JPNIC Since APNIC17 Izumi Okutani Japan Network Information Center NIR 18, Fiji 31 August – 3 September, 2004.
1 RIR Policy Development Update Policy SIG 8 Sep 2005 APNIC20, Hanoi, Vietnam Save Vocea.
A Proposal for a Revised Policy Development Process (prop-001-v001) APNIC16 – Address Policy SIG Seoul, Korea 20 August 2003.
R I P E N e t w o r k C o o r d i n a t i o n C e n t r e. h t t p : / / w w w. r i p e. n e t. n c r i p e. n e t 1 The Internet Registry System IPv4.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Open Address Policy Meeting Address Policy SIG October 26th, Brisbane.
NRO Number Council Report Jason Schiller Louie Lee Martin Hannigan Jason Schiller Louie Lee Martin Hannigan.
IPv6 Address Allocation Policies & Procedures Champika Wijayatunga, APNIC 1 st ASEAN IPv6 Summit Oct 20-22, 2003 – Kuala Lumpur, Malaysia.
IP Address Management The RIR System & IP policy
APNIC Policy SIG report: Open Policy Meeting Policy SIG Report Masato Yamanishi, Chair.
APNIC Executive Council Report APNIC 38 Meeting 19 September 2014.
APNIC Last /8 Policy Implementation Report Sanjaya Services Area Director.
Mirjam Kühne 1 ETO, Oct The Internet Registry System presented by Mirjam Kühne.
IANA Governance Changes – NANOG 62 Lightning Talk John Curran, ARIN.
APNIC Status Report LACNIC V November 2003 Havana.
ICANN ASO AC Report to ARIN Public Policy Mtg Cathy Wittbrodt Thanks to Hans Petter Holen and Sabine Jaume.
Policy implementation and document status report Address Policy SIG APNIC 15, Taipei, Taiwan 27 February 2003.
Internet Addressing and the RIR system (part 2) 12 February 2004 Phnom Penh, Cambodia Paul Wilson, APNIC.
APNIC Depletion of the IPv4 free address pool – IPv6 deployment The day after!! 8 August 2008 Queenstown, New Zealand In conjunction with APAN Cecil Goldstein,
Regional Internet Registries Statistics & Activities IETF 55 Atlanta Prepared By APNIC, ARIN, LACNIC, RIPE NCC.
1 San Diego, California 25 February ARIN’s Policy Development Process Current Number Resource Policy Discussions and How to Participate Owen DeLong.
1 Madison, Wisconsin 9 September14. 2 ARIN’s Policy Development Process Current Number Resource Policy Discussions and How to Participate John Springer.
A proposal to lower the IPv4 minimum allocation size and initial criteria in the AP region prop-014-v001 Policy SIG APNIC17/APRICOT 2004 Feb
IP Policy in APNIC and What about TWNIC ? Kuo-Wei Wu.
EC proposal: Formation of a Cooperation SIG Akinori Maemura APNIC 38 Brisbane, Australia Tuesday, 16th September 2014.
Developing IPv6 Address Guidelines Izumi Okutani Japan Network Information Center Address Policy SIG Aug 2003, Seoul.
A proposal for an APNIC document editorial policy (prop-002-v001) Address Policy SIG APNIC 16, Seoul, Korea 21 August 2003.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Executive Council Report Tommi Chen Chair, APNIC EC.
First Timers’ Breakfast Richard Jimmerson Chief Information Officer.
The ASO is a supporting organization of ICANN Number Resource Policy Development Process Alan Barrett ICANN ASO Address Council ICANN 46 Beijing April.
Management of Internet Resources ITU Workshop on Developing a Policy and Regulatory Framework for Developing Economies of the Pacific 1 December 2003 Suva,
Criteria for the Recognition of NIRs in the APNIC Region NIR Meeting APNIC14, Kitakyushu, Japan 4 Sept 2002.
Address Supporting Organization Seoul, Korea – August 2003.
Policies for ASN Management in the Asia Pacific Region – Revised Draft Address Policy SIG APNIC14, Kitakyushu, Japan 4 Sept 2002.
Keith Mitchell 1 RIPE 33, May 1999 RIPE NCC Executive Board Report Keith Mitchell ICANN Address Supporting Organisation.
30 April 2003 ITU SG2, Geneva, Switzerland Axel Pawlik, RIPE NCC Information Document 21-E ITU-T Study Group 2 May 2003 Question:1/2 Source:TSB Title:The.
Internet Protocol Addresses What are they like and how are the managed? Paul Wilson APNIC.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Emerging Registry Criteria ASO General Assembly Budapest, 19 May 2000.
Policy Development Processes in the APNIC Region 4 th ASO General Assembly Santiago, Chile 24 April 2003.
Policy Development Process
IPv4 IXP Address Policy APNIC Policy SIG Meeting Taipei, August 2001 Philip Smith.
1 IANA global IPv6 allocation policy [prop-005-v002] Policy SIG 1 Sept 2004 APNIC18, Nadi, Fiji.
1 Welcome to the Policy SIG Policy SIG 1 March 2007 APNIC 23, Bali, Indonesia Kenny Huang.
1 Welcome to the Policy SIG APNIC 21 Thursday 2 March 2006.
1 Welcome to the Policy SIG 6 Sep 2006 APNIC 22, Kaohsiung, Taiwan.
8 th Address Policy SIG Report Takashi Arano Yong Wan Ju Kenny Huang Chair/co-Chairs of APNIC Address Policy SIG.
Regional Internet Registries An Overview
APNIC Open Address Policy Meeting
APNIC Member Meeting NRO, ASO and WSIS.
Regional Internet Registries
A Coordinated Proposal Regional Internet Registries
Introduction to PTI Elise Gerich| RIPE Meeting | October 2016.
A Proposal for IPv4 Essential Infrastructure
Joint IPv6 Forum/IPv6 SIG APNIC 15, Taipei, Taiwan 26 February 2003
Policy Development Processes in the APNIC Region
RIPE 48, May 2004 NRO / ICANN MoU.
Policy Development Process
IPv6 distribution and policy update
Policy SIG APNIC 17 Kuala Lumpur, Malaysia
Thursday 28 February 2008 APNIC 25, Taipei Toshiyuki Hosaka
prop-081-v001: Eligibility for assignments from the final /8
Policy Development Process
Presentation transcript:

A Review of Policy Development Processes in the Asia Pacific Region Address Policy SIG APNIC 15, Taipei, Taiwan 27 February 2003

Overview Motivation & Problem Policy Development Principles Process Elements Process Flowchart Other RIRs Current Needs Met?

Motivation Last review of policy process –October 2000, Brisbane OPM Early infancy of SIG programme –Today more structured due to work by SIG chairs, Community & Secretariat Dynamic nature of industry –Periodic review necessary

Problem What is the best process to create ‘good policy’ in this forum? –Balance the needs of industry and community consultative processes –Representing all interests How do you ensure sound technical outcomes?

Principles of Policy Development ‘Bottom up’, consensus based decision making –Community proposes and approves policy –No policies implemented without consensus of community Open and transparent –Anyone can attend –All decisions archived

What is Consensus? OED definition –“General agreement in opinion” Show of hands to judge ‘general agreement’ –Often a count is taken to assist but is not essential Those in favour, those against Non-voters do not block proposal If difficult to judge, unlikely to be consensus –Final call by SIG chair Consensus judged at face to face meetings –Not on mailing lists

Elements of the Process APNIC Open Policy Meetings –Special interest groups (SIGs) and Open NIR meeting Working groups (WGs) –Member meetings (MMs) Mailing lists –Each SIG has a dedicated mailing list for discussions

Policy Development Documentation Policy making process description – Supporting docs & recommendations –Guides for SIG chairs and for presenters Timelines for circulating proposals – –SIG administrative procedures (draft) Electing new chairs, creating new SIGs –SIG charters (draft)

How Does it Work? New Policy or amendment proposed on SIG mailing list (ML) Endorsement by MM? Report of consensus in SIG to MM Consensus? Implementation 3 months Posted to SIG ML for discussion Face to face discussions in public open forum (SIGs) YES NO

Role of the APNIC EC By-laws state EC is empowered to –Consider broad Internet policy issues in order to ensure that APNIC's policies and strategies fully respond to the constantly changing Internet environment –Act on behalf of the Members in the interval between AGMs EC act in ‘emergency’ or as point of ‘appeal’ –May be asked to consider emergency proposals or action on policy outcomes

Advantages and Disadvantages Advantages –Review of SIG outcomes Attendees at MM have final sign off of all consensus proposals before implementation –Flexible process, well documented Disadvantages –Discussions at MM may be repeated or reach different conclusions to the SIG Difficult for chair to balance needs of each –Limited use of mailing lists for discussions May be inappropriate for region?

Other RIRs - ARIN

Other RIRs - LACNIC Working groups (WGs) –Volunteers (7 or less) work on new policy or modifications Mailing lists – Feedback/discussion on WG proposals Discussion in Open Policy Forum –OPF is empowered to make consensus decisions –If proposal accepted LACNIC board defines implementation schedule WG dissolves –If proposal does not reach consensus WG discussion continues

Other RIRs – RIPE NCC Proposal/idea usually sent to WG ML –Not a formal requirement Discussion on WG ML Presentation at RIPE WG meeting –WG empowered to make policy decisions Informational reports to the plenary meeting Reports of decision to the mailing list –Informal ‘ratification’ Comment period Implementation details Draft published

How Does it Work? Discussion New Policy or amendment proposed on SIG mailing list Endorsement by MM? Report of consensus SIG to MM Face to face discussions in public open forum (SIGs) Consensus? Posted to SIG ML for discussion Implementation 3 months YES NO