Presentation is loading. Please wait.

Presentation is loading. Please wait.

Policy SIG APNIC 17 Kuala Lumpur, Malaysia

Similar presentations


Presentation on theme: "Policy SIG APNIC 17 Kuala Lumpur, Malaysia"— Presentation transcript:

1 Policy SIG APNIC 17 Kuala Lumpur, Malaysia
Open action items Policy SIG APNIC 17 Kuala Lumpur, Malaysia

2 Action add Secretariat to refer discussion of signing the DNS root to the DNS Operations SIG.

3 Action add The Chair will circulate the draft charter to the mailing list for further discussion.

4 Action add Secretariat to prepare implementation of policy development process proposal (prop-001-v001) as agreed, subject to final endorsement according to the policy development process.

5 Action add Secretariat to prepare implementation of document editorial proposal (prop-002-v001) as agreed, subject to final endorsement according to the policy development process.

6 Action add Secretariat to call for the formation of a working group to draft IPv6 guidelines.

7 Action add Chair to circulate IANA to RIR IPv4 allocation principles document (prop-008-v001) to mailing list according to policy development process.

8 Action add Chairs to initiate discussion on mailing list relating to preferred IANA to RIR IPv6 allocation size.

9 Action add Secretariat to prepare implementation of the agreed parts of the IXP proposal (prop-011-v001), namely definitions and routing restriction amendments, subject to final endorsement according to the policy development process.

10 Action add Proposer to resubmit revised version of IXP proposal (prop-011-v001) dealing with remaining proposal elements, such as fee waiver (which had been withdrawn during discussion), characteristics (which became ambiguous with withdrawal of fee portions), and combined IPv4 and IPv6 assignments (which were not fully discussed).

11 Action add Secretariat to prepare implementation of the historical resource transfer proposal (prop-006-v001) as agreed, subject to final endorsement according to the policy development process. There is a recommendation that the policy document should clarify that existing resource holders will be able to still update their resources as previously.


Download ppt "Policy SIG APNIC 17 Kuala Lumpur, Malaysia"

Similar presentations


Ads by Google