MERLIN RIXS Endstation Design Review

Slides:



Advertisements
Similar presentations
Pneumatic Cylinders Chapter 3.
Advertisements

ENGR 214 Chapter 16 Plane Motion of Rigid Bodies:
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date:
Mechanical Engineering Design Review BL ARPES Endstation Derek Yegian, Jonathan Denlinger, Keith Franck 4/18/2008.
Fluid Power Hydraulic Cylinders
Hydraulic Cylinders and Cushioning Devices
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Vacuum Vessel Production Readiness Review
1 Grating Mount Requirements Weight:< 75 Lbs including grating (43.1 Lbs) Size:Fit within structural envelope. 1.5” for cell behind grating. Alignment:Adjust.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
CM 197 Mechanics of Materials Chap 14: Stresses in Beams
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
PEEM III Endstation Design Review
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
LINEAR MEASUREMENT.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
High-Accuracy, Repeatable Wrist Interface
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
Support and alignment of PXL box with MSC, operation steps
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Update of anchoring procedures for the ALS floor 09/19/2007.
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
College of Optical Sciences The University of Arizona 1 APOMA Fall 2008 Workshop 11/17-11/18/08 Stages and rotary tables.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
MERLIN BEAMLINE RIXS refocusing mirror system D. Yegian
Understanding typical users for this instrument Graduate studentGraduate student –not an X-ray expert but wants to make a spatially resolved measurement;
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
SAXS/WAXS Conversion for Beamline Engineering Review.
Engineering Division 1 M321/M331 Mirror Switchyard Design Review Tom Miller
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Mount structure concept FM1 & FM2 Mount structure design 1) Aluminum structure. 2) Structure design for holding Newport mirror mount because of its compact.
Shear Test Assembly update
HF Source Drivers Performance Observations and Recommendations Paul Debbins University of Iowa Nov. 10, 2004.
Exit slit toroid, with horizontal steering servo-loop to slits monochromator, with mirror and grating scanning Beamline Mono residual steering effects.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Fluid Power Control.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Linear actuator Cylinders Single acting Double acting
Chapter 6: Hydraulic Cylinders and Cylinder Cushioning
Design of Joints, Levers, & offset Links (12 marks)
UNIT-I SLOTTING MACHINES
EBTF Design Review Technical Meeting Group
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
iSHELL Design Review Cryostat & Optics Bench
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
BULK DEFORMATION PROCESSES IN METALWORKING
BFC Structural Steel and Timber Design
Chapter 11 Lesson 3 Engine Top End.
LARP Phase II Secondary Collimator RC-1
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Beam Finder Wire (BFW) Status
Presentation transcript:

MERLIN RIXS Endstation Design Review Forward Scatter (proposed) 90 Deg Scatter Back Scatter (proposed) Sample prep Benefits of the WJO Beam Direction Main chamber Assy Tom Miller 6-30-08

Basic layout of MERLIN RIXS Endstation ARPES Endstation RIXS KB Mirrors 4.0.1 Experiments

RIXS Endstation Chamber includes 3 ports for spectrometers at 45, 90 and 150 degrees. The sample transfer port is at 195 degrees. A John Pepper designed cryostat sits on top of a 150mm travel XYZ stage mounted on an 8” rotary axis. The rotary axis is limited to 270 degrees of total travel.

RIXS Support and Pumping Details Stand is designed for maximum rigidity with allowable footprint. The shear plate is not shown. The pumping tree will initially have a 150 l/s pump installed, but the support is designed for a double-flanged 300 l/s model.

Basic sample garage design Sample Prep Sample prep with a loadlock chamber. View ports give views of transfers between chambers. Basic sample garage design

Spectrograph and Slit Assembly Overview Camera shown at minimum and maximum working distance

Spectrograph Fundamentals The slitless emission spectrograph will be used at the MERLIN branch line to perform the resonant inelastic X-ray scattering spectroscopy (RIXS) at the transition metal M edge (30-150eV). The schematic plot of the spectrograph is shown in figure 1. Figure 1: Schematic plot of the slitless VLS spectrograph that will be used at MERLIN beamline. This spectrograph has two optical components: a spherical focusing mirror and two VLS plane gratings (central line density 2000 and 3000 l/mm). The optical design is shown in figure 2. 977-1282mm This Page courtesy of Yi-De Chuang 5-20-08 Figure 2: Optical layout of the spectrograph.

Alignment, resolution and stability requirements for the spectrograph See figure 1 for coordinate system Dimension Alignment tolerance Mechanical steps Design Resolution Stability tolerance x 100mm N/A 100mm* 10mm y z 12.5mm 2.5mm (?) 0.1mm 0.5mm Qx 1o (irrelevant) <0.1o 0.1o Qy 6mrad <1mrad 0.6mrad Qz 1o <1mrad** *Survey tolerance **This is a consequence of the Z-axis resolution This Page courtesy of Yi-De Chuang 5-20-08

Spectrometer Stand Kinematic base plate allows spectrometer to be removed and replaced with high accuracy. Spectrometer mounts with one shoulder bolt and compression spring for safety and repeatability Slide on Y-strut allows high-precision translation of grating or slit

Y axis translation Mechanism Travel stops on slide prevent damage to slit assembly.

Spectrometer translation mechanism Custom low-profile high rigidity crossed-roller slide. Slide shown fully extended Slide shown fully retracted. Note only one pinch point - at full extension.

Spectrometer Optics Chamber mounting Drilled and tapped mounting bars will be welded to .38” thick tank bottom. Tank was originally held by clamps on input and output tubes. Note bosses for 3-point mounting.

Spectrometer and slit assembly The white spectrometer base plate allows complete off-line alignment of the mirror tank, slits and camera assembly.

Slit Fundamentals If slits are used, the requirements are as follows: Minimum gap < 5 microns, maximum 400 microns Mechanism must fit inside the radiation shielding of the cryostat Be insertible to within 5mm of the sample Be retractable to allow the Main chamber to be valved out prior to removal of the spectrograph. Total motion required is 9.75”. Fit inside a 1.87 ID port with clearance to move +/-0.1” in Y Have step resolution for gap of <=1 micron using manual micrometer heads

Slit Assembly Isolation bellows Translationbellows The 2 unused ports in the cross will be used for roughing out the slit and potentially for LVDT connector(s).

Slit Details Stop plate on actuation end of slit assembly has 4-40 stop holes top and bottom to prevent over closing. Plate itself functions as a stop in the open direction. Slit will open >500 microns if the levers are driven to the stops, but no damage will result. Round holes in stop plate are for LVDT wires. Levers are inserted into the assembly from the actuation end with the stop plate removed.

Slit Lever Details Levers are made from 6061-T6 and are identical top and bottom. Note ball seat and extension spring hole on actuation end. Also note ledge at blade end to prevent blade damage by over-closing. Slit is fully closed in the relaxed state. The stress on the 17-4 strip flexures when open to 500 microns is about 75 ksi. Levers will include provisions for LVDT’s, but none will be installed initially. The LVDT mounting location will yield true slit opening if one LVDT is used or relative blade locations (yielding gap and position of gap) if 2 are used.

Slit Feedthrough Detail Tension spring keeps the lever loaded against the micrometer and the compression spring nearly cancels the vacuum loading from the bellows. This allows the micrometer to see a 3 lb thrust when under vacuum. At air, the required thrust is 6 lb. Gold cylinder is a linear bearing. Orange disk is a shim that allows large adjustments of the micrometer zero. Small changes are made by moving the micrometer in the clamp. Green-gray spring mount slips into cross.

Slit Mechanism Mounting The slit mechanism is independently alignable to the spectrometer. The opposing bellows make this alignment independent of vacuum forces. The 4 tooling balls on the mirror tank will be fiducialized to the grating. The position of the slit can then be related to the tooling balls.

Spectrograph Camera Camera is mounted to a standard 12” travel slide. Slide includes a linear encoder, index mark and limit switches. White shim plates allow alignment of the camera spool to the exit flange of the mirror tank.

Camera Bellows Support Low cost linear bushings ride on stainless guide rods.

Slit to Cryostat Relationship Note the intrusion of the slit into the cryostat assembly during use. Hard stops on the manipulator Y-axis will be required.

Seismic Calculations RIXS Endstation Seismic Calculations for Concrete Floor Anchors Description Total Weight W, (lbs.) Horizontal Acceleration, Wx0.7 (lbs.) Height H, (in.) Distance D, (in.) Leverage Ratio, (D/H) Number of Anchors Tension Load (lbs.) Tension Load per Anchor (lbs.) Shear Load per Anchor (lbs.) Anchor Size (Dia, in.) Anchor Type (HDI) Allowable Tension Load per Anchor (lbs.) Allowable Shear Load per Anchor (lbs.) Combined Shear &Tension Load Factor (<1) Safety Factor ( > 1) Notes RIXS Spectrometer assy (5 anchors actual) 1300 910 37 28.00 1.32 2 1203 455 1/2 HDI 2374 1798 0.76 Non-symmetrical pattern. Assumes one anchor restricting rotation about a line formed by 2 other anchors. Very conservative case. Actual shear loads would be 40% of calculated value. 21.00 1.76 4 1603 802 228 0.46 2.15 Non-symmetrical pattern. Assumes two anchors restricting rotation about a line formed by 2 other anchors. Conservative case. RIXS Sample Prep (2 anchors and 4 1/2" bolts) 700 490 33 14.00 2.36 1155 245 0.62 1.61 Non-symmetrical pattern. Assumes one anchor restricting rotation about a line formed by one anchor and one bolt. Actual shear loading is 33% of calculated value. 1.57 770 385 123 0.23 4.34 Non-symmetrical pattern. Assumes two anchors restricting rotation about a line formed by two bolts. Actual shear loading is 66% of calculated value. RIXS Main Chamber assy + Prep (7 anchors total) 2400 1680 29.5 1.05 1770 885 420 0.61 1.65 Includes moment induced by prep system. Non-symmetrical pattern. Assumes two anchors restricting rotation about a line formed by two anchors. Conservative case. 33.00 0.89 1502 751 0.55 1.82   Acceleration Lever. Ratio Tension Ten. / Anchor Shear Shear,Ten. Safety Factor Hilti Drop in Anchors, Type HDI Max Depth (in.) Tension Load Allowable (lbs.) Shear Load Allowable (lbs.) Minimum Spacing (in.) 1 9/16 3/8 1483 1210 5.5 7.0 2 9/16 5/8 3884 3447 9.0 3 3/16 3/4 5406 4862 11.0 <==

Questions and Observations