PHENIX PLANNING Technical Support Plan for 2006 Don Lynch (updated 3/24/06)

Slides:



Advertisements
Similar presentations
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
PHENIX WEEKLY PLANNING 4/20/06 Don Lynch. Safety We have lost a whole week of running because of a violation of procedure and not because of the accident.
PHENIX WEEKLY PLANNING 11/30/06 Don Lynch. 11/16/06 Weekly Planning Meeting 2 PHENIX END OF SHUTDOWN PARTY Celebrating the successful installation of.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Preparations for Run 6 Don Lynch February 13, 2006.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
PHENIX WEEKLY PLANNING 8/24/06 Don Lynch. 8/24/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
Presentation transcript:

PHENIX PLANNING Technical Support Plan for 2006 Don Lynch (updated 3/24/06)

Major Projects Recover from water in dry air system/ MuTr repairs -December ’05 [DONE] MPC South - [ Detector Insdtallation DONE], Electronics to be completed by April 1 ‘06 Prepare for Run 6 – [DONE] RXNP magnet test – [DONE] Beam Loss Monitor Test – [UNDERWAY COMPLETE BY MAY 1 ’06] Run 6 – February-June ’06 HBD Run 6 Installation – Prototype April-May ’06, Engg Run June ‘06 TOF West – Receive/Prep for Install May ’06; Install July ’06 RXNP - DesignMarch-May ’06, Install July ’06 HBD -, Final Aug ‘06 MPC North – Design April- MAy ’06, Install September ’06 Subsystem maintenance, repair, upgrades: TBD Prepare for run 7 – September-October ’06 Run 7 – November ’06 – June ‘07

TOF W Installation TOF W Installation Fixture and access platform Ready to install detectors when they arrive. Expected by May Installation scheduled for shutdown 2006.

TOF W Fabrication MRPC’sMRPC’s MRPC’s Feedthru boards

½ box with detectors HV bus Gas pipe HV connectors Holes for Installation/ mounting wheels Gasket signal cables TOF W Fabrication

TOF W Assembly

HBD Gas Supply HBD electronics rack In Gas Mixing House HBD transparency monitor hutch ready to install instrumentation when it arrives TOF/HBD Gas Shared Flow Control Rack. HBD to be single pass for Run 6

R134A Gas Bottle Location Scales to monitor bottle contents HBD & TOF W Gas Systems Gas Pad Location for CF4 bottles

HBD Electronics HBD High Voltage Rack (to be located on Bridge) HBD low voltage and signal electronics rack (installed on east-central pedestal)

Gas Pad Location for CF4 bottles HBD Gas Supply Stainless Gas Lines to top of CM Piping in IR complete. Flexible lines allow CM to move for maintenance HBD Gas flow panel Installed. HBD in and out lines are short circuited and now flowing Argon to maintain cleanliness.

HBD Prototype Gas System

HBD Support X, Y, Z adjustments on this side HBD Support X, Y adjustments on this side HBD Mechanical Support

HBD Prototype Mounting Prototype can not use final design mounting due to differences in location of connectors and other basic design differences. Prototype mounting to be fabricated from fg unistrut.

MPC Installation MPC South was installed in Jan. ’06. MPC North scheduled to be installed Sept. ’06.

MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.

HBD Installation/ Access CM scissor lift table extensions completed Feb. ’06 (extends table 22” east & west; steps up 8”). Alllows maintenannce and installation access to new CM detectors.

CM Lift Table Extensions First extension received from Central Shops. Minor modification needed to mount rails. Otherwise works as planned. Was successfully used for DC repairs Plug lock for lift table. Table is to be operated by authorized techs only. To be locked out when BLM test fixture is installed. Drift Chamber Repairs

RXNP Magnet Field Tests Made from fiberglas unistrut with precision cut angles. To be supported from lower HBD I-beams PMT’s

RXNP Magnet Field Tests Test Completed February ‘06

RXNP PMT in magnetic field tests Completed

Beam Loss Monitors BLM Stand with BLM’s and Chipmunks Stripixel sensors and diodes go on this surface

Beam Loss Monitors Need to make holders for diodes. 2 size diodes 8 of each for test. Bare stripixel sensors (2)

Revised BLM support design

BLM Test

BLM Test Installation He Bags

LN 2 Storage Dewar for BBC Original Plan As Installed

LN 2 Storage Dewar for BBC

20mm thick lead converter 130mm 150mm outer painting on the converter surface or stainless steel case with lead inside Pb + 2% Sb R=50mm R=180mm R=330mm 2cm thick scintillator + 2cm thick lead converter Enhance RP resolution via adding neutral particles fiber light guide flexibility of mechanical structure. 12 segments in phi and 2 segments in 2.8) Detector stable against dead channel help removing auto-correlation effect. Hamamtsu fine mesh PMT for light readout Good dynamic range and work in high field. EMCal FEE for electronic readout. good dynamic range. RXNP DETECTOR

North and south detectors each with 4 arms to PMT’s

RXNP DETECTOR Assembled on bench Into 4 quadrants. Base Plate attaches to Brass nosecone.

RXNP DETECTOR Quadrant Assembly

CM Crane design Integration support work for Future Detectors (NCC, SVTX, FVTX, RPC) (New beampipe) CM region access stairs Discretionary improvements to existing equipment EC: Fix/replace fibers, Noisy FEM’s in DC, PC, DC water flow interlocks, TEC replace p/s and FEM’s, ARCNET on fiber to all racks? WC: Replace bucketless buckets in AGEL racks, noisy FEM’s in DC, PC MuTr & MuID: HV repair, troublesome FEM’s, blue logic repairs, MUTR cosmic ray trigger with LL1? E F & I: Verify installation of transient suppression in all racks, Bucket maintenance, Fan replacement, Communication testing to UVC HV mainframes, tighten connections on distribution panels, fiber repairs Additional Shutdown 2006 Tasks

New Beampipe for Upgrades A concept discussed between Jan Boissevain of LANL and D. Lynch of BNL. Requires suport built in to NCC and temporary isolating support to move CM.

CM Region Crane & Cable Routing Concept Cable Trays to route cables NCC Detector from Bridge CM Crane north- south & east-west motions; extended travel east to existing crane coverage Crane Supports use existing flux return notches

CM Region Stairs Something a little more substantial would be nice

Other Beneficial Work for S/D 2006 DAQ Electronics: Replace/test GL12GTM, STTP’s, blue logic trigger racks? Computing: Backups: test reliability, weed out unreliable hardware and servers, upgrade network Gas System –Maintenance and calibration for all components –Subsystem upgrades TBD –New system component installation

C-A Tasks Current Tasks General run support New storage trailer (as promised) Fix roof leaks/mold problems Tasks for Shutdown 2006 Install access platforms from EC top north and MMS Replace emergency fan louvres Rewire/add IR ceiling lights on emergency power Replace WC sliding platform hoisting cables Mixing house exhaust fan maintenance

MOLD Problems

Energy Conservation Clean/organize under the tracks Move extra I-beams & pipe to storage Electronics lab (new shelves?) Clean & organize storage areas: Assembly hall Shelves near transformers Trailers Wire Conservation & Housekeeping

SD 06 Schedule To Be Determined