ADC Meeting # 2, Seattle, 20-21 July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.

Slides:



Advertisements
Similar presentations
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 WGISS – GEO Discussion.
Advertisements

© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Interoperability Principles in the Global Earth Observations System of Systems (GEOSS) Presented 13 March 2006 at eGY in Boulder, CO by: Eliot Christian,
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
Second Independent Evaluation Roles / Responsibilities & Relationships.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
How GEO works  Coordinating activities of Members and Participating Organisations  Supporting the development of capabilities for Observations, Processing.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
Recommendations: ADC coordination across GEO committees.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 Virtual Constellations (DA-07-03) I.Petiteville, CEOS GEO ADC Co-Chairs Meeting, USGS,
Report of the Special Committee on the Logical Framework, Governance and Funding Shaida Badiee, Development Data Group, World Bank Paris, June 2, 2010.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Status of tasks AG-06-04, AR-06-09, CL-06-02, DA , DA Ivan Petiteville, CEOS Meeting #
© GEO Secretariat Task Point of Contact: a volunteer from among the Leads, who will provide a single point of communication for all those involved in the.
Status Report GEO Task AR Interoperability among Digital Elevation Model (DEM) Ryosuke Shibasaki.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
© GEO Secretariat Global Datasets (GEOSS task DA-09-03) 3rd GEO European Project Workshop 8-9 October 2009 Istanbul Douglas Cripe, GEO Secretariat.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
SUSTAINABLE DEVELOPMENT, GLOBAL CHANGE AND ECOSYSTEMS A Edwards – ADC, Seattle, 2006 Slide 1 European Community RTD Framework Programmes ADC.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
GEO Work Plan Symposium 2012 ID-01 Advancing the GEOSS Data Sharing Principles.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
GEO ADC Co-Chair meeting, Tokyo, Japan, 13 May 2007 Slide # 1 Cross-GEO Coordination Report of C4 Meeting and follow-up discussion Ivan Petiteville, CEOS.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
WGISS - GEO Way Forward Issue 1.0 Ivan Petiteville WGISS-24, DLR Oberpfaffenhofen Thursday Sep. 18, 2007.
GEO Standards and Interoperability Forum SIF First Organizational Meeting 27 July 2007 Barcelona, Spain.
ADC Portal & Clearinghouse GEO Architecture and Data Committee 2-3 March 2006 George Percivall OGC Chief Architect
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
Architecture Task AR Status Presented to the July Meeting of the GEO and Architecture and Data Committee Dr. Thomas C. Adang AR Point.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
State of Georgia Release Management Training
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
GEO ADC meeting, Tokyo, Japan, May 2007 Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Tokyo, Japan,
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
Helen M. Wood Co-chair / U.S.A. On behalf of the Data Sharing Task Force 22nd Meeting of the GEO Executive Committee Geneva, Switzerland July 2011.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
The Standards and Interoperability Forum
GEOSS Data Sharing Principles
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Status Report on SIF to GEO ADC
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
SIT Chair Introduction
Report on CEOS Executive Officer functions
CEOS Work Plan Progress Report
Presentation transcript:

ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006

ADC Meeting # 2, Seattle, July 2006 Slide # 2 Role of ADC ADC Structure ADC Communication Documents from the ADC Relationship between ADC and GEO Secretariat Issues & Way Forward

ADC Meeting # 2, Seattle, July 2006 Slide # 3 Role of the ADC - Purpose Defined as per Terms of Reference approved at GEO-II ( see doc. ref. GEO , dated 15 Dec ) Purpose: The ADC supports GEO in all architecture and data management aspects of the design, coordination, and implementation of the Global Earth Observation System of Systems (GEOSS) for comprehensive, coordinated, and sustained Earth observations.

ADC Meeting # 2, Seattle, July 2006 Slide # 4 Role of the ADC - Objectives Enable GEO … –to define the components of GEOSS, –to converge or harmonize observation methods, –to promote the use of standards and references, intercalibration, and data assimilation. based upon user requirements and building on existing systems and initiatives –to define and update interoperability arrangements e.g. for collecting, processing, storing, and disseminating shared data, metadata and products. –to facilitate data management, information management, and common services, –to help to promote data sharing principles for the full and open sharing and exchange of data and information, recognizing relevant international instruments and national policies and legislation.

ADC Meeting # 2, Seattle, July 2006 Slide # 5 Role of the ADC – Approach & Functions Providing advice and recommendation to GEO e.g.: –forum for dialogue and resolution of issues at varying levels; –advocacy within and across existing systems; –coordination with participating international organizations or national agencies; –establishment of subordinate teams to accomplish specific tasks Close liaison and work with existing operating authorities of GEOSS components Monitor and report to Plenary on the achievement of milestones and deliverables in the implementation of the GEO annual work plans. –Liaison between GEO Secretariat and Individual POCs - SHERPA

ADC Meeting # 2, Seattle, July 2006 Slide # 6 ADC Structure 5 Co-chairs representing CEOS, IEEE, Japan, USA and WMO 33 tasks (GEO 2006 WP) to be supervised by ADC –29 POCs ( 24 persons from the 96 Members, Participating Organizations and GEO Secretariat ) –More than 300 “moral” and “physical” persons ( GEO 2006 Roster ) involved

ADC Meeting # 2, Seattle, July 2006 Slide # 7 ADC Communication Meetings –Paris March 2-3, 2006 and Seattle July 20-21, 2006 Teleconferences –7 teleconferences since January s –More than 430 s exchanged in last 6 months between GEO Secretariat and ADC members ( Co-chairs, POCs, Lead and Contributing Agencies )

ADC Meeting # 2, Seattle, July 2006 Slide # 8 Documents from the ADC Minutes –For all meetings ( ftp://ftp.wmo.int/Projects/GEO/ADC ) and teleconferences Presentations –From meeting # 1: ftp://ftp.wmo.int/Projects/GEO/ADC/meeting01-presentations Documents –“Guidance for ADC POC's (Points of Contact) on GEOSS Implementation Tasks”

ADC Meeting # 2, Seattle, July 2006 Slide # 9 Relationship between ADC and GEO Secretariat The GEO Secretariat Expert Staff supporting the ADC are: –Osamu Ochiai –Michael Rast Frequent contacts with Co-chairs Participation to all ADC telecons and meeting

ADC Meeting # 2, Seattle, July 2006 Slide # 10 Issues & Way Forward

ADC Meeting # 2, Seattle, July 2006 Slide # 11 Task Management Issues Task reporting exercise (June 2006) –Sometimes no report from POC –Sometimes ADC sherpa bypassed – direct report from POC to GEO SEC Lack of coordination noticed for some tasks –Little coordination between POC and Sherpa –Insufficient task internal coordination between Lead and Contributing organizations under POC responsibility No progress on some tasks for which no POCs is nominated Observations

ADC Meeting # 2, Seattle, July 2006 Slide # 12 Task Management Issues Is the role of the Sherpa as interface between the POCs and the GEO Secretariat needed ? –Expected Added Value of the ADC Co-Chairs: coordination between tasks liaison and work with operating authorities of GEOSS components Advice & recommendation to GEO SEC –Experience from other GEO Committees? How to improve the task management & coordination by the POC ? Questions

ADC Meeting # 2, Seattle, July 2006 Slide # 13 Tasks Management Issues Questions (cont’) What to do for tasks with no POC ? How to strengthen the Coordination with other GEO Committees? –Direct coordination between Committees Co- Chairs or via GEO Secretariat ?

ADC Meeting # 2, Seattle, July 2006 Slide # 14 Way-Forward Tasks Management - Way Forward Official statement ( e.g. in GEO plan, new document,.. ) to describe: – the duties of the POCs – the relationship between Tasks POCs, Sherpas and the GEO SEC Pressure on the non-responsive POCs ? –Limit the number of tasks coordinated by the same POC –Replace the non-efficient POCs

ADC Meeting # 2, Seattle, July 2006 Slide # 15 Way-Forward Tasks Management - Way Forward Tasks with no POCs –Postpone or remove the task if not critical –Regroup with another related task Coordination with other GEO Committees –Possible GEO Co-Chairs meetings + teleconferences –Other Co-Chairs to attend ADC meetings

ADC Meeting # 2, Seattle, July 2006 Slide # 16 Observations Tasks Execution Issues (1/4) Tasks executed at different paces. Some critical tasks are progressing too slowly (euphemism !) even when considered as high priority tasks –Potential impacts on other tasks if linked ( see next slide ) –No means to force the highest priority tasks to be executed first Difficulty to impose a Priority list for “ADC” Tasks

ADC Meeting # 2, Seattle, July 2006 Slide # 17 Observations Tasks Execution Issues (2/4) Each task is executed independently w.r.t. other tasks –apparent total decorrelation between all tasks while some tasks outputs are required as inputs to other tasks

ADC Meeting # 2, Seattle, July 2006 Slide # 18 Observations Tasks Execution Issues (3/4) Each task is executed independently w.r.t. other tasks (cont’) –Potential mismatch between interfaces (protocol, data type, recommended standards,..) managed within more than one task

ADC Meeting # 2, Seattle, July 2006 Slide # 19 Questions Task Execution Issues Not progressing tasks: –What are the critical and non-critical tasks ? –What to do in each case ? Priority list of tasks –Should we establish a Priority list ? –How to force those tasks to be executed first ? Overall Coordination between tasks –How to improve it taken into account the relationship between them ?

ADC Meeting # 2, Seattle, July 2006 Slide # 20 Tasks Execution - Way Forward Need to establish a GEO overall task coordination process – Identification of tasks interdependencies and tasks criticalities (establishment of a priority list) –Description of the logic for the tasks execution (priority,inputs/outputs, schedule,..) –Generation and maintenance of a Project plan (MS-Project type) –Generation and maintenance of a GEO Overall Interface Control Document (BIBLE !). Identification of: The major GEOSS elements with high-level information The data types exchanged between those elements The protocols used for the data flow management The detailed Interface Control Documents (e.g. one per task) Way-Forward

ADC Meeting # 2, Seattle, July 2006 Slide # 21

ADC Meeting # 2, Seattle, July 2006 Slide # 22 Earth Simulator NASA Archives NASA Archives ESA Archives CERN Grid Reproc. Center CERN Grid Reproc. Center GEOWeb Portal GEOWeb Portal Ecosystem database Ecosystem database Internet SAR L1 & L2 GeoTiff MODIS L1 HDFEOS GEONetCast Any format Fire Location GML

ADC Meeting # 2, Seattle, July 2006 Slide # 23 Tasks Execution - Way Forward Not progressing tasks –if not critical task: Assess whether a change in the task organization (e.g. change of POC) might help Postpone or remove the task Regroup with another related task –if critical task: Assess the reasons for the stagnation and implement mitigations actions Way-Forward

ADC Meeting # 2, Seattle, July 2006 Slide # 24