AN- NAJAH NATIONAL UNIVERSITY OPTIMUM DESIGN AND PERFORMANCE FOR NABLUS NETWORK Submitted To : Dr. Maher Khammash Prepared By : Haitham Sharaf Ahmad Odeh.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

Sistan & Balouchestan Electric Power Distribution Company
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Power Flow Problem Formulation
Today’s Topics 1- The per unit system 2-Transformer Voltage Regulation
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Per Unit Representation Load Flow Analysis Power System Stability Power Factor Improvement Ashfaq Hussain.
Lecture 27Electro Mechanical System1  The fact that power is always positive reveals that it always flows from the generator to the resistor.  This is.
Power Factor: What Is It and Estimating Its Cost Presented by:Marc Tye, P.E APPA Business & Financial Conference September 21, 2004.
Chapter 7 Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
1 Training Session on Energy Equipment Electricity Presentation from the “Energy Efficiency Guide for Industry in Asia” ©
Plant Utility System (TKK-2210)
Circuits II EE221 Unit 4 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
Technical Presentation on the new Power Saving Unit (PSU) Introduced By View Power.
Chapter 11 AC Power Analysis
POWER FACTOR CORRECTION
Power System 2002 Conference: Impact of Distributed Generation CLEMSON UNIVERSITY ELECTRIC POWER RESEARCH ASSOCIATION 1 Distribution Capacitor Placement.
Power in AC Circuits ELEC 308 Elements of Electrical Engineering
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Chapter 7 AC Power Analysis
Circuits II EE221 Unit 11 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
Power System Fundamentals EE-317 Lecture 3 06 October 2010.
My Time in CURENT Graham Treasure. Quick Recap First semester – Electrical theory – Introduction to programming – I already gave this talk Second Semester.
Announcements Homework #4 is due now Homework 5 is due on Oct 4
بسم الله الرحمن الرحيم An-najah national university WELLS CONNECTING AND IMPROVING QALQILIA NETWORK Prepared by: Ameer qassas Ahmad wasef Shareef abu zubideh.
SOBIERAJSKI_PL_author_ALPHA4_BLOCK4.4_Question9 Barcelona May The probabilistic study of voltage problems in lightly loaded medium voltage.
1 Distribution Networks For Large Cities: EPRI Research on Modelling and Analysis Roger DUGAN Sr. Technical Executive Electric Power Research Inst. US.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
KEM_Cespedes_A1 Colombia Session 3 – Block 1 Barcelona May ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN.
ANALYSIS OF THE OPERATING CONDITION OF Qalqilia ELECTRICAL NETWORK
Lecture 11 Power Flow Professor Tom Overbye Special Guest Appearance by Professor Sauer! Department of Electrical and Computer Engineering ECE 476 POWER.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Optimal Power Flow- Basic Requirements For Real Life.
Instructor :Kashif Mehmood
REACTIVE POWER COMPENSATION
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE498HZ: Power Distribution System Analysis
FUNDAMENTAL OF ELECTRICAL POWER SYSTEMS (EE 270)
Established in Started by visionary Engineers & Entrepreneurs with Proven Power Electronics background. Committed to energy conservation. Made a.
Impact of Distributed Generation on Fault Induced Transients: A Case Study Sukumar Brahma Adly Girgis Clemson University Electric Power Research Association.
(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,
By Fluke India.
An- Najah National University Rehabilitation of Nablus Electrical Network by adding a new connection point Submitted To : Dr. Maher Khammash Prepared By.
Lesson 12: Parallel Transformers and Autotransformers ET 332b Ac Motors, Generators and Power Systems 1 Lesson 12_et332b.pptx.
Power Factor Correction The Definitive power solution
Announcements Please read Chapter 6
بسم الله الرحمن الرحيم Design and analysis of an electric power system, with the design of a load flow program using MATLAB.
Power Factor Correction The Definitive power solution
Automated power Factor Correction and Energy Monitoring System
POWER FACTOR CORRECTION
Chapter 11 AC Power Analysis
BEAT OMMAR NETWORK STUDY
Management Of Tulkarm Electrical Network
Analysis of the Amplitude and Frequencies of the Voltage Magnification Transients in Distribution Networks due to Capacitor Switching Mohamed Saied Electrical.
Improvement the electrical distribution network
ECEN 460 Power System Operation and Control
Strategic planning for Nablus power system
Distribution Feeder Voltage Regulation and Control
POWER SYSTEM ANALYSIS INTRODUCTION.
Why does power factor matter Make-up of distribution capacitor banks
Tubas ELECTRICAL NETWORK STUDY
Sami Repo Tampere University of Technology FINLAND
ECEN 460 Power System Operation and Control
An-Najah National University Faculty of Engineering
Energy Management PPKSE 06/07 SAA.
Prepared by: Ismael K. Saeed
Name : Ahmad Sobhi Abu Sadah Hemzeh Ahmad Qados.
Presentation transcript:

AN- NAJAH NATIONAL UNIVERSITY OPTIMUM DESIGN AND PERFORMANCE FOR NABLUS NETWORK Submitted To : Dr. Maher Khammash Prepared By : Haitham Sharaf Ahmad Odeh

ABSTRACT Project One was to gather initial data for "Mojair Addin" network and subject it to a load flow study under its normal condition (6.6 kV).

ONE LINE DIAGRAM OF NABLUS NETWORK

THE FOLLOWING RESULTS WERE OBTAINED: NORMAL CONDITION ( 6.6 KV) : Bus Initial Voltage (KV) Operating Voltage (KV) V% Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus T he following table shows the under voltages on some buses

SOME OF UNDER VOLTAGE BUSES :

SUMMARY OF TOTAL GENERATION, LOADING & DEMAND : * Under voltage buses and low power factor are observed

PROJECT GOAL For project II, the voltage level is increased from 6.6kV to 11kV and is analyzed under 3 conditions: 1. Max. case. 2. Min. case. 3. Post-fault case.

CHANGING THE VOLTAGE LEVEL ( ) KV : after raising the voltage to 11kV, the voltage drop was notably decreased and a slight improvement to the power factor was observed.

THE FOLLOWING TABLE SHOWS THE UNDER VOLTAGES ON SOME BUSES: Bus Initial Voltage (KV) Operating Voltage (KV) V% Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus

SUMMARY OF TOTAL GENERATION, LOADING & DEMAND :

MAXIMUM CASE : The tap changer of the main transformer was increased by 10% and six capacitors were added on the lowest voltage buses of (600, 4x800, 400 kVAr) in order to improve the voltages and the power factor.

THE FOLLOWING TABLE SHOWS THE OVER VOLTAGES ON SOME BUSES: Bus Initial Voltage (KV) Operating Voltage (KV) V% Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus

SUMMARY OF TOTAL GENERATION, LOADING & DEMAND :

MINIMUM CASE : First, the tap changer was increased by 5% and the loads were halved (decreased by 50%). then, 5 capacitors were added of (200, 800, 2x400, 100 kVAr).

THE FOLLOWING TABLE SHOWS THE OVER VOLTAGES ON SOME BUSES: Bus Initial Voltage (KV) Operating Voltage (KV) V% Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus

SUMMARY OF TOTAL GENERATION, LOADING & DEMAND :

POST-FAULT CASE: In this case, the maximum case was used and the branch with the highest apparent power will have its impedance (R & X) multiplied by 2.

THE FOLLOWING TABLE SHOWS THE OVER VOLTAGES ON SOME BUSES: Bus Initial Voltage (KV) Operating Voltage (KV) V% Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus

SUMMARY OF TOTAL GENERATION, LOADING & DEMAND :

COMPARING BETWEEN THE CASES: Normal case ( 6.6 KV) Changing swing bus (6.6-11) KV Maximum Case Bus Initial Voltage (KV) Operating Voltage (KV) V%Bus Initial Voltage (KV) Operating Voltage (KV)V%Bus Initial Voltage (KV) Operating Voltage (KV) V% Medium voltage Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Low Voltage (0.4 KV) Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus

Minimum CasePost- fault Case Bus Initial Voltage (KV) Operating Voltage (KV) V%Bus Initial Voltage (KV) Operating Voltage (KV) V% Medium voltage Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Low Voltage (0.4 KV) Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus Bus

The following table shows the apparent losses for these five cases:: Post –fault case Minimum Case Maximum Case Changing swing bus (6.6-11)kV Normal Case (6.6)kV Real Losses ( MW) Reactive Losses ( MAvr)

Comparison between the cases considering the power factor: Post –fault case Minimum Case Maximum Case Changing swing bus (6.6-11)kV Normal Case (6.6)kV Lag90.84 Lag90.75 Lag80.76 Lag Lag Power Factor Swing Bus

Economical Study *Saving in penalties of PF= NIS/year *Saving in losses= NIS/year *Total cost of capacitor banks = (4200 * 15 ) = NIS *Simple Payback Period= 0.18 year= 2.16 month

Industrial Region of Bait- Foureek: The industrial region suggested in bait- Foureek which will be connected to the connection point of Howara at a high voltage of 33 kV, which has an estimated load of 10 MW depending on the information given by Northern Electricity Distribution Company (NEDCO), where a transformer will be used of 33/0.4 kV. No transformer will be used to convert from 33/11 kV and that's due to economical reasons.

* SINCE THE INDUSTRIAL REGION IS DIRECTLY CONNECTED TO THE CONNECTION POINT OF HOWARA, THERE'S NO NEED FOR A LOAD FLOW STUDY FOR THE WHOLE NETWORK WHICH IS CONNECTED TO IT.

Calculation: Real Power = 10 MW Power Factor = 0.85 Using Transformer of (33-0.4) KV Apparent Power S = ( Real Power / Power Factor) S = ( 10 / 0.85 ) = MVA S Rated Transformer = ( S Load / Load Factor) S = ( / 0.7 ) = 16.8 MVA

CONCLUSION: After subjecting "Mojair Addin" network to a load flow study and improving it, drop voltage was clearly decreased, apparent losses was reduced, and the power factor was improved which will lead to a more efficient and stable system and to economical benefits on both NEDCO company and consumers as well.