Model 2537A Training Course Detailed Instrument Description Rev: Nov. 2003.

Slides:



Advertisements
Similar presentations
Dual Fuel Engine Conversion
Advertisements

Engineer Training XL1200 Pneumatics. Engineer Training XL1200 Pneumatics Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
737 PNEUMATICS MENU PRINCIPAL.
Photometers Sat 6 Nov /11/1431.  Light emissions of alkali and alkaline earth metal elements are measured with flame photometry.  To this purpose,
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
Mechanical System. Agenda Mechanical Systems – Contest Outcomes Basic Pneumatics The Kit of Parts.
Experiment (4) Flow Measurement
Normal Operating Parameters Maintenance Schedule Common Problems Normal Operating Parameters Maintenance Schedule Common Problems ClearWater Tech, LLC.
PTC® Creo® Parametric ™
January 22, Advanced Modular Sample System Richard E. Hughes.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
Sand media filtration is one of the oldest filter processes in the world. Water Tool Modular Filters have made extensive improvements to what is presently.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Instrumentation Developments in Stream Switch Valve Technology Steve Doe, Parker Hannifin Corporation.
National Air Monitoring Conference EPA Precursor Gas Training Workshop Dennis K. Mikel EPA - Office of Air Quality, Planning and Standards Technical.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
SEMINAR ON “GASOLINE DIRECT INJECTION”
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
Engine Compartment Left Side. Oil-to-Fuel Heat Exchanger.
Left side compressor behind Left control box Right side compressor behind Right control box.
2537A Tekran Mercury Analyzer
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
Basic Treatment Train Diagrams Keep in mind…variations are ALWAYS possible.
WELCOME TO THE TECHNICAL PRESENTATION OF SC100 1.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
900-LC P. van Poppel – Field Support Specialist October 2009.
Engineer Training Pneumatic System Overview. Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons.
Ultra-trace Mercury Monitoring in Air. Company History Founded in 1989 to develop custom instrumentation for environmental analysis Founded in 1989 to.
Lesson Using Pneumatic Systems. Interest Approach Can you explain how air makes a pneumatic hand tool work?
Lesson 8 Using Pneumatic Systems. Next Generation Science/Common Core Standards Addressed?  CCSS.ELA Literacy RST Cite specific textual evidence.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
Presented by: Rick Kuemin, MSA Training Director
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
AIR INJECTION n Chapter 8 n Page 272 Classroom Manual n Page 353 Lab Manual CBCAUTOMOTIVERK.
XAS 375 JD6 Compressors Scott Malm
Ships Service Air System
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
Multiple Module Vacuum Oven Productivity Enhancement System.
FLIGHT CONTROLS AND HYDRAULICS. FLIGHT CONTROLS The flight control systems are mechanical linkages, actuated by conventional controls, and are used to.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Solar Sausage Project Water Purification Device 2/17/16.
UH-60A/L Fuel System.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
Normal Maintenance ID Flushing Technical stop end of 2010 Maintenance dryers –Done by the company Donaldson Recalibration H2O meter Recalibration Safety.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
BioTector COD TOC TN analyzer
GC Startup.
Brooks Expert Support Tool (BEST) Software
Fuel-Injection Systems
WHY? HOW? Test Valve Measure Vibrations Contain Valves
Introduction to Electronic Fuel Systems
ATM 322 – Pneumatics Module 4
Proximity Cryogenics P&IDs meeting
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
© Copyright, HQT-SV Control System
Status of Hydrogen System Development
Two Common Types of EFI Chapter 22 Lesson 3.
AQT90 FLEX Service Training
Pushing the Envelope in Analyzer Sampling Technology
SNS PPU Cryomodule Instrumentation
Series 5300 Lithium Cell Formation System
SNS PPU Cryomodule Instrumentation
Fuel-Injection Systems
Presentation transcript:

Model 2537A Training Course Detailed Instrument Description Rev: Nov. 2003

Installation Power Power 115 VAC or 230 VAC, 200 VA 115 VAC or 230 VAC, 200 VA Should be regulated ±5% Should be regulated ±5% Argon Argon % or better % or better One tank lasts for 2-3 months of continuous use One tank lasts for 2-3 months of continuous use Zero Air Zero Air Final Hg filter and pressure regulator provided Final Hg filter and pressure regulator provided Requires 3 to 60 PSI, 1.5 l/m instrument air Requires 3 to 60 PSI, 1.5 l/m instrument air Used only during startup and recalibrations Used only during startup and recalibrations

Sample Line Vital part of overall system Vital part of overall system Heated Teflon ® line Heated Teflon ® line Glass high volume manifold Glass high volume manifold No metal components! No metal components! Periodic QA/QC tests on sample line advisable Periodic QA/QC tests on sample line advisable

Rear Panel Connections

Top Components Top panel provides access to: Top panel provides access to: Valve assembly & cartridges Valve assembly & cartridges Microprocessor Microprocessor Main PCB Main PCB Detector module & lamp Detector module & lamp

Bottom Components Bottom panel provides access to: Bottom panel provides access to: Zero/Sample switching solenoid Zero/Sample switching solenoid Permeation source Permeation source Power supplies & internal fuses Power supplies & internal fuses Pump, MFM, buffer tank & MFC Pump, MFM, buffer tank & MFC Argon supply valve, filter & pressure regulator Argon supply valve, filter & pressure regulator

Detailed Flow Diagram

Valve Assembly

Pure Gold Cartridge (Pat’d)

Atomic Fluorescence Detector

Lamp Stabilizer Board

Perm Source Flow Diagram

Permeation Source

Menu Tree

End – Detailed Section