E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.

Slides:



Advertisements
Similar presentations
Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection.
Advertisements

E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
Jin Huang PhD Candidate, MIT For MENU 2010 May 31, Williamsburg.
MeAsurement of F 2 n /F 2 p, d/u RAtios and A=3 EMC Effect in Deep Inelastic Electron Scattering Off the Tritium and Helium MirrOr Nuclei J. Gomez for.
E : HRS Cross Section Analyses Vincent Sulkosky Massachusetts Institute of Technology GMp Collaboration Meeting September 24 th, 2012.
Jin Huang & Vincent Sulkosky Massachusetts Institute of Technology Boson 2010 Workshop Sept 20, JLab.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Manpower and Collaboration  Tasks  Commitments  Collaboration organization.
DESY PRC May 10, Beyond the One Photon Approximation in Lepton Scattering: A Definitive Experiment at DESY for J. Arrington (Argonne) D. Hasell,
Bogdan Wojtsekhowski, Jefferson Lab Experimental search for A’ for APEX collaboration 1.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
Min Huang Duke University, TUNL On Behalf of the E g2p collaboration Hall A Analysis Workshop, 12/12/12.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Measurements of F 2 and R=σ L /σ T on Deuteron and Nuclei in the Nucleon Resonance Region Ya Li January 31, 2009 Jlab E02-109/E (Jan05)
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
High Precision Measurement of the Proton Charge Radius A. Gasparian NC A&T State University, Greensboro, NC Outline  Previous experiments and proton size.
HAPPEX-III, PVDIS, PREx targets D.S. Armstrong April 17 ‘09 1)Cryotargets – what we requested: new 25 cm racetrack cells – status 2) Solid Targets for.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting December 10 th, 2012.
Rosen07 Two-Photon Exchange Status Update James Johnson Northwestern University & Argonne National Lab For the Rosen07 Collaboration.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Cherenkov Counters for SoLID Z.-E. Meziani on behalf of Simona Malace & Haiyan Gao (Duke University) Eric Fuchey (Temple University) SoLID Dry Run Review,
BigBite Spectrometer Equipment by Douglas W. Higinbotham.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
Measurement of F 2 and R=σ L /σ T in Nuclei at Low Q 2 Phase I Ya Li Hampton University January 18, 2008.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Readiness Review for Jlab Experiment E Hall A and BigBite Collaboration experiment Approved Jan 2004 for 16 days Precision Measurement of the Electroproduction.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
A Measurement of Two-Photon Exchange in Unpolarized Elastic Electron-Proton Scattering John Arrington and James Johnson Northwestern University & Argonne.
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
Proton Charge Form Factor Measurement E. Cisbani INFN Rome – Sanità Group and Italian National Institute of Health 113/Oct/2011E. Cisbani / Proton FF.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
E Precision Measurement of the Neutron Magnetic Form Factor up to Q 2 =13.5 (GeV/c) 2 by the Ratio Method B. Quinn, J. Annand, R. Gilman, B. Wojtsekhowski.
GEp-III in Hall C Andrew Puckett, MIT On behalf of the Jefferson Lab Hall C GEp-III Collaboration April 15, 2008.
Charmonium Production in 920 GeV Proton-Nucleus Interactions Presented by Wolfgang Gradl for the HERA-B
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting June 13 th, 2013 E97-110:
JLab, October 31, 2008 WACS in 12 GeV era 1 GPDs Wide-Angle Compton Scattering pi-0 photo-production in 12 GeV era B. Wojtsekhowski Outline WACS and other.
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
JLab PAC33, January 16, 2008 Polarization transfer in WACS 1  p   p Polarization transfer in Wide-Angle Compton Scattering Proposal D. Hamilton,
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
G0 Backward Angle Request: Q 2 = 0.23, 0.48 GeV 2 Main points G0 goal is to measure G E s, G M s and G A e over range of momentum transfers with best possible.
E Research Update: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia for Jefferson Lab E Collaboration.
The GMp Experiment in 2014 Vincent Sulkosky Longwood University for the E Collaboration Hall A DVCS Collaboration Meeting December 19-20, 2013.
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
Envisioned PbWO4 detector Wide-Angle Compton Scattering at JLab-12 GeV with a neutral-particle detector With much input from B. Wojtsekhowski and P. Kroll.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Hall A Collaboration Meeting Slide 0 Measurements of Target Single-Spin Asymmetries in QE 3 He ↑ (e, e’) Update of QE A y (E05-015) experiment.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Jefferson Lab PAC 30 1 August 23, 2006 PR (Hall A) ● PR (Hall C) Measuring the Neutron g 2 and d 2 at 12 GeV PR (Hall A) ● PR
Bryan Moffit PAC32 Dry Run Precision Measurement of the Proton Elastic Cross Section at High Q 2 PAC32 12 GeV Proposal : PR Spokespersons:Bryan.
BigBite Gas Cherenkov Update July 21, 2008 Brad Sawatzky (& Doug Higinbotham) ● I apologize for being out of town for this meeting – I booked my trip before.
Precision Measurement of the Proton Elastic Cross Section at High Q2
First data from TOTEM experiment at LHC
Special Considerations for SIDIS
Overview: E (x>1) E (EMC)
Presentation transcript:

E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the E Collaboration Spokespeople: J. Arrington, E. Christy, S. Gilad, B. Moffit, V. Sulkosky, B. Wojtsekhowski Hall A Collaboration Meeting June 13 th, 2013

Goals for GMp  Accurately measure e-p elastic cross section in kinematics similar to other JLab form factor measurements  Improve accuracy of the cross section by as much as a factor of 4 (< 2%) over previous measurements  Key input to all form factors and many of other experiments, where elastic scattering is a background  Provide measurement of power scaling for GMp in the range Q 2 = 7-14 GeV 2  Approved for 24 PAC days

Control of Systematics  DAQ and Trigger:  EDTM pulser for dead time measurements  Achieved 10 kHz with 20% dead time  Tracking efficiency: Use front chambers of FPP with VDCs  Target density  Use precise optics to provide software cuts on vertex  Use race-track cell targets with vertical flow to minimize fluctuations  Solid angle: a benefit of improved optics  Scattering angle: precise determination of target location using strong arm wire target

Modifications to Instrumentation  Strong arm wire target:  Design completed  Cost: $3k to $5k, saved $8k by using old radiator mechanism  HRS detector stacks:  Design completed  Add one chamber of FPP to both stacks  Attach S0 to FPP chamber  Shorten extension box for LHRS gas Cherenkov by 10 cm  Cost: $20k (mostly from labor, trying to reduce this cost)  Target scattering chamber  Design completed, though there maybe modifications  Allows to run DVCS (LHRS) and GMp (RHRS) concurrently  Cost: ~ $50k

Wire target, reproducibility of 100 microns sufficient Design completed, waiting on order of parts HRS Optics and Angle: Wire Target Wires:  0.5” apart along the beamline  1/16” (~1.6 mm) apart transverse to beam

HRS Detector Stacks Standard detectors with one plane of FPP VDCs Pion rejector Gas Cherenkov Fpp S0

New Narrow DVCS Support Stand

 Restrictions from scattering chamber design:  LHRS: 12.5 o to 18 o with calorimeter)  RHRS: o to 45 o with calorimeter)  DVCS calorimeter: < -20 o Angle Restrictions

Target Configuration Solid targets/Endcaps measured with x-ray attenuation LH 2 : 15 cm Racetrack:  Vertical flow design  Dedicated studies of density  Luminosity monitors in datastream  Not compatible with DVCS Solid Al Foils (Dummy): Endcap subtraction Carbon Optics Targets: 1-2 cm spacing along z vertex for extended target acceptance

10 Target Density/Boiling Results from x>2, Z. Ye (UVA) Simulation by Silviu Covrig

Expected Precision

Systematic Uncertainties SourcePoint-to-point Normalization Incident energy<0.3 Scattering Angle Incident Beam Angle Radiative Corrections* Beam Charge Target Thickness/Density Fluctuations Spectrometer Acceptance Endcap Subtraction0.1 Detector efficiencies/dead time Sum in quadrature Uncertainties give in Δ  /  (%)

Tasks & Responsibilities Tasks Commitments Scattering chamber designJLAB – A. Gavalya Strong arm wire target designHall A – J. Miller Online analysis softwareJLAB – A. Camsonne, O. Hansen LH 2 TargetJLAB – D. Meekins, J.-P. Chen Beam lineHall A – D. Higinbotham, B. Michaels, E. Christy Refurbish Gas Č counter ( measure mirrors, test/replace PMTs) MIT – K. Allada, V. Sulkosky, L. Ou, Y. Wang VDC electronics, cratesYerPhi – A. Shahinyan FPPYerPhi – A. Shahinyan et al. NIM trigger electronicsHall A – B. Wojtsekhowski Analysis for absolute cross-sectionsHU – E. Christy Scattering and solid angle determinationANL – J. Arrington

Graduate Students  Longwu Ou (MIT)  Yang Wang (W&M)  Mohamed Nuh Hashir Rashad (ODU); DVCS graduate student  Potential student from HU and perhaps another from MIT (Barak Schmookler)

Commitments in Manpower  FPP work: Albert Shahinyan, Galust Sargsyan and Karen (YerPHI)  HRS detectors:  Milan Dukic (NCCU technician) for three weeks  Hamza Atac (Temple) for two weeks  NSU student for one month  Longwu Ou (MIT); (GMp student)  Kai Pan (UVa student) for two weeks  Puneet Khetarpal (FIU postdoc) for two weeks  John LeRose (JLab) part time  Mohamed Nuh Hashir Rashad (ODU); DVCS graduate student  Yang Wang (WM); graduate student (GMp student)

Additional manpower is needed and welcome, especially for testing of both spectrometers’ detector packages Summary  GMp will provide a baseline for the 21 st century level of accuracy in form factor measurements by precisely measuring the cross section at Q 2 up to 14 GeV 2.  It is the only measurement of the cross section; key input to all form factors and many of other experiments.  Some progress is being made with many of the improvements aiding other experiments that plan on using the HRS’s during 12 GeV.  GMp requires high precision at full 11 GeV beam energy!  Collaborators are welcome to participate; much work is still required before 2014.

Backup

Systematic Uncertainties Source Δ  /  (%) Parameters Incident energy<0.33×10 -4 Scattering Angle Incident Beam Angle Radiative Corrections*0.3 Beam Charge0.31×10 -3 Target Density Fluctuations0.2 Spectrometer Acceptance mrad Endcap Subtraction0.1 Detector efficiencies/dead time0.3 Sum in quadrature Point to point uncertainties

Systematic Uncertainties

Already 1 FTE year has been spent on FPP FPP (front chambers) Problems: gas consumption > 50 l/h HV trips often due to gas, many dead wires/some electronics. Done: repair of dead electronics; built parallel gas distribution. Still to do: HV distribution in one PC; gas distribution should be as wide as a straw block; HV test wires. Recent: First chamber main work is completed; second in progress and expect completion in 1 month; hardware electronics not yet started.

VDC Improvements  Upgrade electronics to use 1877S, which allows sparsification  Replace aging A/D cards and reuse BigBite cards  Provide very good stability against oscillations and rate capability of 8 MHz (in full chamber)  LHRS and RHRS completed and tested  Software still needed for Fpp chamber and for cosmics checks

Gas Cherenkov Improvements  Reflectivity measurements of HRS GCC mirrors in progress  Both HRS mirrors completed  Two spare mirrors recoated and checked  Reflectivity is within a few percent of published results  In progress of checking relative response of PMTs and will replace those as needed; ~ 70 to test  Cosmic mirror calibration

Introduction

Kinematics PAC Approved 24 days

25 DVCS-GMp Cooperation: Dual Running GMp and DVCS install together (except DVCS calorimeter) 1) GMp runs independently: a) Restrictions on HRS angles from vacuum chamber and DVCS stand b) Restrictions on HRS movement from DVCS cables and stand, HRS movement will require manual assistance 2) One week shutdown to install DVCS calorimeter 3) DVCS runs ~ 3 PAC months: GMp takes parasitic data with right HRs at large angles