Mars Exploration Program Response to: Vision and Voyages for Planetary Science in the Decade 2013-2022 Michael Meyer MEPAG June 2011 Lead Scientist, Mars.

Slides:



Advertisements
Similar presentations
Vision and Voyages For Planetary Science in the Decade Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres.
Advertisements

THE NSF BUDGET Overview of Agency Funding Processes Presented by Beth Blue National Science Foundation Office of Budget, Finance, and Award Management.
U.S. Department of Energy Office of Science Advanced Scientific Computing Research Program NERSC Users Group Meeting Department of Energy Update June 12,
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
CMB Decadal Study: What We Did Activities funded by NASA proposal: PI Steve Meyer + entire CMB community Workshops: The Path to CMBPOL: Upcoming Measurement.
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
Conversation with ACCORD on GSMT 21 January 2005 Michael S. Turner, Assistant Director Directorate for Mathematical & Physics Sciences National Science.
A NASA Headquarters Perspective August 24, 2010 George J. Komar Associate Director/Program Manager Earth Science Technology Office.
Lunar Advanced Science and Exploration Research: Partnership in Science and Exploration Michael J. Wargo, Sc.D. Chief Lunar Scientist for Exploration Systems.
PCOS Program Office Mission Studies and Technology Development Jackie Townsend Advanced Concepts and Technology Office PCOS and COR Program Offices
A Synergistic Strategy for Robotic and Human NEO Exploration Tom Jones Florida Institute for Human & Machine Cognition IPEWG Aug 11 1.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
Strategic Planning Framework Programs & Projects ArchitectureRoadmaps Agency Goals & Objectives National Policy and Direction.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
Update on the NASA/NOAA/DOE Collaboration on the Utilization of ROA/UAV/UAS for Global Climate Change and Weather Research Will Bolton Sandia National.
A.Space Probes- a vehicle that carries scientific instruments to planets or other bodies in space. 1) The soviets were first to launch a probe.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
Jet Propulsion Laboratory California Institute of Technology National Aeronautics and Space Administration National Aeronautics and Space Administration.
Comprehend the Historical Benefits of Exploration Comprehend the US Strategic Plan to Explore Space Comprehend the Current Costs of Exploring Space Comprehend.
Mars Exploration Directorate National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California.
CSS Implementation CEOS Essential Questions. Response: CEOS Essential Questions Timeline: * White paper circulated and questions identified-SIT-27 * Questions.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
JAXA’s Space Exploration Scenario for the Next Twenty Years - Science Strategy - Masato Nakamura Steering Committee of Space Science Institute of Space.
The Utility of National Academy-Sponsored Decadal Surveys Daniel N. Baker Laboratory for Atmospheric and Space Physics CU-Boulder.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
SMD Suborbital Science in the Planetary Science Division Philippe Crane Planetary Atmospheres Discipline Scientist LCANS Meeting 28 April 2007.
U.S. Department of Energy Office of Science Advanced Scientific Computing Research Program NERSC Users Group Meeting Department of Energy Update September.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
Systems Studies Program Peer Review Meeting Albert L. Opdenaker III DOE Program Manager Holiday Inn Express Germantown, Maryland August 29, 2013.
1 JAXA’s Views on Space Exploration Kiyotaka Yashiro Director, International Relations Department Japan Aerospace Exploration Agency (JAXA) SYMPOSIUM Space.
IMARS History and Phase II Overview Presented to MEPAG 13 May 2014 L. May, NASA HQ NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
Presented to Kepler Pre-Launch Educator Workshop January 31, 2009 Shari Asplund Discovery and New Frontiers Programs Education and Public Outreach Manager.
Mars Exploration Program Science MEPAG March 17, 2010 Michael Meyer Lead Scientist.
MATT Report Feb. 20, Philip Christensen (Chair) Lars Borg (ND-SAG Co-Chair) Wendy Calvin (MSO SAG Chair) Mike Carr Dave Des Marais (ND-SAG Co-Chair)
National Aeronautics and Space Administration Transitioning Toward the Future of Commercial Human Spaceflight COMMERCIAL CREW PROGRAM AIAA Spring Dinner.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Constellation Space Transportation Planning Office July 30, 2009.
MEPAG September 2010 Doug McCuistion Director, Mars Exploration Program.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
The Mars Exploration Program
PROPOSED 2018 Joint Rover Mission Plans for Proposed 2018 NASA & ESA Joint Rover Mission Landing Site Selection Matt Golombek Mars Exploration Program.
MEPAG July 2009 Doug McCuistion Director, Mars Exploration Program.
1 Investing in America’s Future The National Science Foundation Strategic Plan for FY OPP Advisory Committee 10/26/06.
NASA Earth Science Perspective February 8, 2011 George J. Komar Associate Director/Program Manager Earth Science Technology Office.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
0 Space Exploration and International Cooperation Gilbert R. Kirkham Office of External Relations June 2004.
MEPAG Meeting October 4, 2012 Monrovia, CA Dave Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
MEPAG: Action Items, Forward Planning Jack Mustard, MEPAG Chair MRO HiRISE / U. Arizona / JPL / NASA NOTE ADDED BY JPL WEBMASTER: This document was prepared.
Jim Bell Cornell University The Planetary Society July 30, 2009 Mars Exploration : Rationale and Principles for a Strategic Program Preliminary.
Pre-decisional – for Planning and Discussion Purposes Only 1 Technology Planning for Future Mars Missions Samad Hayati Manager, Mars Technology Program.
Geospatial Line of Business FGDC Steering Committee Meeting October 23, 2006.
Planetary Science Decadal Survey David H. Smith Space Studies Board, National Research Council Mars Exploration Program Analysis Group Arlington,
NASA Hypersonic Research
Visions and Voyages: The Planetary Decadal Survey
Visions and Voyages: The Planetary Decadal Survey
Dr. Malcom Phelps Presentation by
Portfolio Management Process & Customer Request Management
Curious about Curiosity?
Title (do not change font or font size for any of the chart elements)
Visions and Voyages: The Planetary Decadal Survey
NASA Budget & the Political Process
Presentation transcript:

Mars Exploration Program Response to: Vision and Voyages for Planetary Science in the Decade Michael Meyer MEPAG June 2011 Lead Scientist, Mars Exploration Program

2 What Is A Decadal Survey? Once every ten years, at the request of NASA and the National Science Foundation, the National Research Council carries out a “decadal survey” for planetary science. The decadal survey involves very broad participation from the planetary science community. It is the primary scientific input that NASA and NSF use to design their future programs of planetary science and exploration. (The last decadal survey brought us the New Frontiers program.) This decadal survey applies to the decade from 2013 to 2022.

3 Process and Timeline Steering Group 3, Irvine Feb 22-24, 2010 Steering Group 3, Irvine Feb 22-24, 2010 Steering Group 4, DC Jul 13-15, 2010 Steering Group 4, DC Jul 13-15, 2010 Mars 3, Boulder Apr 14-16, 2010 Mars 3, Boulder Apr 14-16, 2010 Primitive Bodies 3, Knoxville Apr 26-28, 2010 Primitive Bodies 3, Knoxville Apr 26-28, 2010 Giant Planets 3, Boston May 4- 6,2010 Giant Planets 3, Boston May 4- 6,2010 Satellites 3, Boulder; Apr 12-14, 2010 Satellites 3, Boulder; Apr 12-14, 2010 Steering Group 1, DC Jul Steering Group 1, DC Jul Steering Group Conference Calls Inner Planets 1, DC Aug 26-28, 2009 Inner Planets 1, DC Aug 26-28, 2009 Mars 1, Tempe Sep 9-11, 2009 Mars 1, Tempe Sep 9-11, 2009 Primitive Bodies 1, DC Sep 9-11, 2009 Primitive Bodies 1, DC Sep 9-11, 2009 Giant Planets 1, DC Aug 24-26, 2009 Giant Planets 1, DC Aug 24-26, 2009 Satellites 1, DC Aug 24-26, 2009 Satellites 1, DC Aug 24-26, 2009 Inner Planets 2, Irvine Oct 26-28, 2009 Inner Planets 2, Irvine Oct 26-28, 2009 Mars 2, Pasadena Nov 4-6, 2009 Mars 2, Pasadena Nov 4-6, 2009 Primitive Bodies 2, Irvine Oct 28-30, 2009 Primitive Bodies 2, Irvine Oct 28-30, 2009 Giant Planets 2, Irvine; Oct 26-28, 2009 Giant Planets 2, Irvine; Oct 26-28, 2009 Satellites 2, Irvine; Sep 21-23, ‘09 Satellites 2, Irvine; Sep 21-23, ‘09 Mission Studies and Cost Estimation Steering Group 2, Irvine Nov 16-18, 2009 Steering Group 2, Irvine Nov 16-18, 2009 Steering Group 5, DC Aug 3-4, 2010 Community White Papers Inner Planets 3, Boulder Oct 26-28, 2009 Inner Planets 3, Boulder Oct 26-28, 2009

4 Summary Vision & Voyages This is a time of great promise in the exploration of the solar system, but also a time of serious budget constraints. The recommended program is science-driven, and will enable progress across the breadth of solar system research. A mixed portfolio of small, medium, and large missions is recommended through the decade. Effective international collaboration is required for success of the program. A serious effort has been made to evaluate the technical readiness, risk, and cost of all recommended missions. The planetary decadal survey has involved broad input from the planetary science community, hard work by the study centers and consultants, and the strong cooperation of NASA, NSF, and professional societies.

5 Increase the NASA planetary R&A budget by 5% above the total finally approved FY’11 expenditures in the first year, and then by 1.5% above inflation each successive year. Continue missions in development, and missions in flight subject to senior review. Continue the Discovery program at its current funding level, adjusted for inflation, with a cost cap per mission also adjusted for inflation (i.e., to $500 million FY’15). Assure a regular, predictable, and rapid (≤ 24-month) cadence of Discovery AOs and selections. Establish a planetary exploration technology development program, funded at 6-8% of the total NASA PSD budget. Key Recommendations

6 Mission Prioritization Criteria –Science return per dollar –Programmatic balance –Technological readiness –Availability of appropriate trajectories Process –All priorities and recommendations were guided strongly by community inputs. –Prioritization within the subject area of each panel was done by the panel. –Cross-panel prioritization was done by the steering group. –All priorities and recommendations were arrived at by achieving strong consensus.

7 Cost and Technical Evaluations After studies were completed, high- priority mission candidates were subjected to a detailed Cost and Technical Evaluation (CATE) by Aerospace Corporation. CATE estimates are based on multiple methodologies, including actual costs of analogous past missions, to avoid the optimism inherent in other cost estimation processes. The result is some sticker shock! But cost realism was demanded by the Statement of Task. The scope of each recommended mission cannot be permitted to increase significantly beyond what was assumed during the CATE process. All costs are in $FY’15.

8 Assumed Funding Wedge (Data and projections provided by PSD)

Planetary Div. Comparative Funding Profiles Decadal, FY11, and FY12 Requests President’s FY12 Budget* President’s FY11 Budget + inflation (Decadal planning budget) Mars DiscoDisco R&A NF Lunar *Notional Budget in RY$ Assumed Flat Budget Outer Planets 9

10 Recommendation The Decadal Survey recommends that the highest priority for the decade is the Mars surface science and sample caching mission that begins a NASA-ESA Mars Sample Return campaign. –The mission concept envisioned two separate rovers—a NASA sample- caching rover and the ESA ExoMars rover—landed on a pallet by the “sky crane” entry, descent, and landing (EDL) system derived MSL. –The Decadal Survey recommended that the MAX-C mission fly “only if it can be conducted for a cost to NASA of no more than approximately $2.5 billion FY2015.” –Strong ESA participation in the Mars Sample Return campaign (beginning with MAX-C) is critical; the campaign cannot proceed without it. Recommendations and Mars Responses Recommendation 1

11 Response The NASA-ESA Joint Mars Exploration Program is currently studying a re- scoped 2018 Mars mission concept to achieve the science and technology objectives of both NASA and ESA. –A significant cost reduction can be achieved with a single rover design that deletes the landed pallet and avoids a major redesign of the MSL-derived EDL system, while maintaining the NASA-ESA partnership for the Mars Sample Return campaign –The joint ESA-NASA rover currently under study is baselined to retain the ExoMars Pasteur scientific payload and subsurface drill. It is also baselined to accommodate the NASA sample handling and caching system, along with the scientific instruments needed to select an outstanding sample. –Benefits of the joint rover concept: the analytical capability provided by the Pasteur payload may be utilized in the selection of sample suites for the cache. By retaining the “mobility touchdown” approach of the MSL EDL system, the joint rover concept enables the Pasteur payload to conduct investigations across a greater range of terrain Maybe the ability to cache the ESA subsurface drill sample. Response 1

12 Recommendation The Decadal Survey recommends, “based on its high science value and its relatively low cost to NASA, […] flight of the Mars Trace Gas Orbiter in 2016 as long as this [NASA providing the launch vehicle, ESA providing the orbiter, and a joint science payload] division of responsibilities with ESA is preserved.” Response The joint NASA /ESA 2016 Mars mission, the ExoMars/Trace Gas Orbiter (TGO), has advanced on both sides. –The NASA portion of the 2016 mission is now in Phase-A. –The original division of responsibility between ESA and NASA for the 2016 mission has remained stable since the July 2009 Bi-Lateral meeting between ESA and NASA Recommendation & Response 2

13 Recommendation NASA should “make significant technology investments in the Mars Sample Return Lander, Mars Sample Return Orbiter” during this decade, and that NASA should “establish an aggressive, focused technology development and validation initiative…during ”, and recommends investing in: –A Mars Ascent Vehicle (MAV); precision entry, descent and landing; and rover mobility for the MSR-Lander –Rendezvous and capture and the Earth entry vehicle (EEV) for the MSR-Orbiter; and –Planetary protection technologies for all elements, including investment in the Sample Receiving Facility. Recommendation 3

14 Response The Mars Exploration Program is continuing the current early investment in MAV technologies and, beginning in FY13, initiating a technology wedge to support the timely development of the other technologies required to complete the MSR campaign. –Because the MSR campaign will be conducted as part of the Joint Mars Exploration Program with the European Space Agency, the MSR Joint Engineering Working Group is determining which agency will lead specific technology developments. –The JEWG is also identifying areas in which both agencies need to invest to ensure a viable solution. Response 3

15 Recommend The Decadal Survey recommends that well before sample return mission, NASA should establish a well-coordinated and integrated program for development of the next generation of laboratory instruments to be used in sample characterization and analysis of returned samples. Response The Mars Program has developed a proposal for an NRC study to include an analysis of technology needed for sample characterization and analysis within a Sample Return Facility. –The committee will consider whether all measurements can be done within the SRF and what investments should be done now to enable that instrumentation –Planetary Sciences has a program for development of laboratory instrumentation and advanced analytical techniques required for the complete analyses of the returned samples (Laboratory Analysis of Returned Samples). Recommendation & Response 4

Questions?