ESTAT 2012 ESSnet Workshop Session 2 Shared services Christine WIRTZ Eurostat Head of Unit "IT for statistical production" Rome, 3 December 2012.

Slides:



Advertisements
Similar presentations
ESS VIP Administrative Data Sources
Advertisements

Eurostat State of play of the ESSnet programme …and the new ESSnet strategy ESSnet Workshop 2012 Rome State of play of the ESSnet programme Martin Karlberg,
ESS VIP PROGRAMME An overview ESSNet workshopWG LUXEMBOURG 22/11/2012.
23-25/5/2011 Modernisation of ESS infrastructure: The ESS instruments - a review E. di Meglio – P. Jacques – J.M. Museux.
ESS VIP project on Validation
International Seminar on Modernizing Official Statistics:
The European Statistical System Vision Infrastructure Programme Daniel Defays, Director Directorate B, Eurostat Eurostat Workshop on the Modernisation.
Eurostat J OINT UNECE/OECD/E UROSTAT MEETING OF THE GROUP OF EXPERTS ON BUSINESS REGISTERS 3-4 September 2013, Geneva Session 1: Economic globalisation.
Eurostat Coverage of Security Issues Pascal Jacques ESTAT B0 Local Informatics Security Officer.
ESS.VIP programme architecture
Eurostat Round table CSPA & Big data
1 ESSnet Workshop 2012 Cavour Conference Centre, Rome 3-4 December 2012 Final conclusions from the workshop Donatella Fazio, Istat.
ESS-VIP ICT Project ESSnet Workshop, Rome, 3-4 December 2012.
TOWARDS INTEROPERABLE STATISTICAL BUSINESS REGISTERS Harrie van der Ven Project manager ESSnet EGR January 2014 Valencia.
Sponsorship on Standardisation Main results Barteld Braaksma, Cecilia Colasanti, Piero Demetrio Falorsi, Wim Kloek, Miguel Angel Martínez Vidal, Jean-Marc.
Modernisation of ESS infrastructure: The ESS instruments - a review E. di Meglio – P. Jacques – J.M. Museux.
Slide 1 Eurostat ESSnet Workshop – session 5 The ESS VIP "Data Warehouses" August Götzfried Head of Unit B5 November 2012.
The ESS.VIP Programme: a response to the challenges facing the ESS Mariana Kotzeva, ESS VIP Programme Coordinator Advisor Hors Classe ESTAT.
Eurostat The impact of the Memobust project results.
STAND-PREP January 2011 Paris 1 Standardisation opportunities Wim Kloek Eurostat.
1 Sponsorship on Standardisation Gosse van der Veen (Statistics Netherlands) Daniel Defays (Eurostat)
Slide 1WG Public Health Statistics December 2014 Eurostat Modernisation of social statistics - state of play Agenda point 4 WG Public Health Statistics.
07-08/6/2011 Methodological and IT innovation mechanisms in the ESS- a review E. di Meglio – P. Jacques – J.M. Museux Unit B2 : Methodology & Research.
Eurostat achievements and challenges Emanuele Baldacci, Director European Commission - Eurostat Director Methodology; Corporate statistical.
27-28/10/2011 Overall framework : The ESS instruments - a review J.M. Museux – Eurostat Methodology and Research Unit
Sponsorship on Standardisation Background and overview Daniel Defays Forwardlooking Feedback Workshop, The Hague, 30/31 May 2013.
ESDEN - modernisation of data exchange in the ESS
1 Item 2.1.b of the agenda IT Governance in the ESS and related issues Renewal of mandates STNE Adam WROŃSKI Eurostat, Unit B5.
IT Directors’ Group Meeting October 2010 Item 2.2 of the agenda Co-ordination with the DIME Rainer MUTHMANN, Head of Unit B2.
ESS EA and ESS VIP PROGRAMME LUXEMBOURG 28/11/2012 ITDG Item 3.1 – 3.2 – 3.3 – 3.4.
Eurostat Report on SDMX Reference Infrastructure User Group 1 st meeting in Luxembourg Sept 2012 Item 5.2 of the agenda November 2012IT Director's.
Eurostat Standardisation DIME-ITDG 2015 Item 6 DIME-ITDG February
From Intrastat to SIMSTAT and ESS.VIP Programme ESTAT Walter Radermacher.
The ESS vision, ESSnets and SDMX
Modernisation of European social statistics
ESS Vision 2020: information on the VIG, overview of current projects and process for the selection of new projects Roberto Barcellan, ESTAT B1 ESS RDG.
Implementing the ESS Vision 2020
Annual Statistical Programme 2016
"IT principles" Context, roadmap
ESS VIP-ESBRs European System of interoperable statistical Business Registers 2012 ESSnet Workshop, Rome  3-4 December 2012 Eurostat.
Methodology and Corporate Architecture
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
Towards an ESS architecture ITDG Item 3.4
ESSnet Training General Introduction P. Jacques
ESS Vision 2020 Recent developments
22 February, ITDG/DIME Item 2 – Progress and deployment
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
The ESS.VIP Programme: an update
The ESS VIP programme: a response to the challenges facing the ESS
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
ESS Vision 2020: ESS.VIP Validation
ESSnet Projects P. Jacques
Draft EP/Council Regulation for processes, standards and
ESS Standardisation State of play
EGR and BR ESS work and plans
Draft Methodology for impact analysis of ESS.VIP Projects
ESS VIP programme: Cross-cutting project on ESS data warehouses for production and dissemination John Allen Agenda point 5 Dissemination Working Group.
ESS Validation Project State of Play and next steps
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
ESS.VIP Validation Item 5.1
Legislative strategy for cross-cutting ESS legislation
CORE outcomes and follow up
Streamlining statistical production
Implementing the “Vision” within the ESS
EUROSTAT – Coordination Issues
ESS.VIP.SERV Shared Services
Presentation of Project Joint meeting of the ESS.VIP.BUS ICT Project
ESS Vision and VALIDATION
Implementing the “Vision” within ESS
Presentation transcript:

ESTAT 2012 ESSnet Workshop Session 2 Shared services Christine WIRTZ Eurostat Head of Unit "IT for statistical production" Rome, 3 December 2012

ESTAT Scope and objectives The ESS-VIP cross cutting project "SHARED SERVICES" aims at putting in place an architecture and related governance allowing for sharing of services across processes and among partners (the ESS). 2

ESTAT R ELATION WITH ESS VIP PROJECTS Business (domain oriented) ESS VIPs foresee development of one or several service(s) to be shared in the ESS 3 ADMINShared IT solutions for some of the methodological building blocks NAPS-SESS NA services, e.g. content validation and seasonal adjustment ESBRs Development of e-ServicesSIMSTAT Other corporate-software functionalityICTShared services ValidationValidation solutions and other related IT services

ESTAT Links with other cross-cutting projects 4 NetworksInformation ModelsData warehousesValidation architecture GovernanceHuman resourcesFinancial resources and cost sharing Communication Technical General R ELATION WITH ESS VIP PROJECTS

ESTAT Common reference environment (CORE) Methodology for modern Business Statistics (Memobust) Harmonisation of statistical disclosure control (SDC) Multimode data collection (DCSS) SDMX... ESSnets Census HUB, EGR, … VIP SICON, VIP Validation, VIP NAPS2, VIP EDC, … Ongoing flagship projects and VIPs: Harmonisation of seasonal adjustment Sharing Advisory board Modernisation of production of statistics … Other initiatives Link with previous projects / other initiatives 5

ESTAT Common approach (technology, methodology) required  ensuring economy of scales,  integration,  reusability and reuse of services. The way to develop an ESS framework for building such services, and a platform for sharing services should be elaborated. The potential for centres of excellence for sharing statistical services should be evaluated. This will include the full scale of governance aspects (ownership, training, maintenance, support, …). Proposed approach 6

ESTAT Requirements established by ESS VIP business projects Initiatives in several Member States have already started and some are well advanced Some Member States ask for sharing / reuse International initiatives: HLG on Modernising Production of Statistics; Sharing Advisory Board Maturity 7

ESTAT Next steps As requested by the ESSC meeting in 11/2012, the business case for the ESS cross-cutting project "Shared services" needs to be further elaborated. This more elaborated business case will then be forwarded to the appropriate decision making body.