Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.

Slides:



Advertisements
Similar presentations
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Advertisements

Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Heat load study of cryomodule in STF
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Dimensions, pressures and temperatures of cryogenic circuits for the SPL U. Wagner TE-CRG.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
Cryogenics and cryolines – Crab Cavities for HiLumi LHC Crab Cavity review November 2015 CERN – Geneva, Switzerland K. Brodzinski, L. Delprat and.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
R. van Weelderen and U. Wagner CERN
Final Design Cryogenic and mechanical configurations
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Magnet cryogenic system update.
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Process Simulation for the LCLS-II Cryogenic Systems
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Crab cavities Cryogenics progress for the SPS
N. Hasan1, P. Knudsen2 and V. Ganni2
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
LARP Vertical Test Facility
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
CERN Cryomodule Requirements for Crab Cavities
Cryostat design Mechanical design: Thermal screens: Specifications:
2K Cold Box Process Design
Cryogenic cavern in Asian site
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
CTF Users’ Perspective
Burst Disc Experiences at CEA Test Stand
Presentation transcript:

Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1 1

Contents Main refrigerator – update after cost and schedule review Heat load evolution and limitations Helium tank review and remarks Flow diagrams and interfaces for SM18 and SPS Work progress and conclusions 2K. Brodzinski - CC coordination

Infrastructure – SPS simplified layout 3K. Brodzinski - CC coordination After cost and schedule review, taking into account present possibilities of helium liquefaction for SPS test, it was preliminarily approved to orient the solution of cold box selection to a new refrigerator. The refrigerator will be configured as mobile plug and play mobile cold box with capacity of ~800 – 1000 K i.e. ~10 g/s of liquefaction rate.

Heat load summary table The summarized heat load overview concerns the evolution of heat inleak analysis into the Crab Cavity SPS test module over design period between 2012 and K. Brodzinski - CC coordination Additional information: -Column B – calculation done for BA4 with ~10m long transfer line -Column C – represents required liquefaction at 2 K to cover heat load from column A -Column D – represents required liquefaction at 4.5 K to cover heat load from columns B -Column E – represents converted from 2 K to 4.5 K required liquefaction to cover heat load from column A -Column F – represents total required liquefaction rate at 4.5 K, sum of values from columns D and E -Column G – represents total required liquefaction rate from column F multiplied with factor 1.5

Heat load evolution curve The summarized heat load overview concerns the evolution of the analysis of the heat inleak into the Crab Cavity SPS test module over design period between 2012 and K. Brodzinski - CC coordination

Required liquefaction rate and cold boxes capacity The new proposed mobile cold box is not included in the above curve. It will have liquefaction capacity of about 8-10 g/s and will allow for using of full capacity of 2 K pumping units (~3.5 mbar) as well as to cover requirements for 80 K screen cooling with helium gas. K. Brodzinski - CC coordination

2 K helium pumps 7 The check shows that assuming inlet pressure of 20 mbar two pumping units are capable to pump ~2.3 g/s of helium, what gives ~3.5 g/s at 30 mbar (2 K saturation) Capacity >2.9 g/s -> OK for CC SPS test K. Brodzinski - CC coordination KEK 2014

Helium tank review 8K. Brodzinski - CC coordination General remark: very interesting, with nice progress of work Specific remarks: Superfluid helium layer above the cavity should be maximized between the cavity and the tank wall, Magnetic shield should be with min. distance from cavity wall of 5 mm, Cool down line to be connected in the middle of enlarged bypass between the helium tanks, Helium head above the cavity is to be reviewed and redesigned – requirements from Fermilab 2012 meeting are not respected because of integration geometrical problems. Probably additional helium tank of ~8 L will be necessary to be integrated between the cavities – tbd. see next slides. The goal is to design the He head in the way to allow linear lowering of the level over the head height (necessary for reliable regulation reasons).

Helium volume K. Brodzinski - CC coordination Estimation of needed helium volume in the cryostat – for one cavity. 9 Volume A – layer of L mm of helium, Volume B – additional helium volume Volume C – additional head of helium for transients (for C=7dm3 -> ~30 min for head evaporation, loading at 20 W) Assumptions: Cavity in shape of a cylinder (D=175 mm, Lcav=700 mm) Helium layer of L mm of thickness analyzed (see data below) Head of additional Lc=50 mm layer of He taken above the cavity (see figure below) Volume A Volume B Volume C LABLcCtotal He volume mmdm3 mmdm Operation with one buffer tank of 8 m3 is limited … “The CC x 2 cryostat should not be bigger than 40 dm3 (if reasonably possible)” L Lc Lcav D L Fermilab 2012

GHe return collector K. Brodzinski - CC coordination Recommendations coming from LHC cryogenics operation. 10 ~ 30 mm ~100 mm LHC RF GHe return line (too low for reliable level regulation ) GHe return collector should be placed on side as presented in above sketch, with reasonable distance above LHe level (~ 100 mm)  for reliable level regulation (avoiding LHe presence in return line). The supply tapping is recommended to be placed in gas volume “far” from outlet pumping ports for efficient separation during the filling. Volume of ~10 – 15 liters is to be respected (without collector) Fermilab 2012

R.Leuxe - CERN 1. Main Views of DQW & RFD Designs DQWRFD

Helium head – options 12K. Brodzinski - CC coordination Level decrease profile - sketch

SPS PFD for crabs K cold box > 150 L dewar Valve box CC module Heater for returning gas Helium storage To recovery system K. Brodzinski - CC coordination VLP 2 K, 30 mbar Supply 2 K, 30 mbar C-D supply 4.5 K, 1.3 mbar 4.5 K transfer line Return 80 K, 4 bar flex Supply screen 50 K, 4 bar 50/80 K transfer line Compressor and pressure management panel Shuffling module TT PT LT TT EH TT EH TT PT LT 1.3 bar

SM18 interface for crabs 14 > 150 L dewar Valve box CC module K. Brodzinski - CC coordination VLP 2 K, 30 mbar Supply 2 K, 30 mbar C-D supply 4.5 K, 1.3 mbar Liquid supply 4.5 K, 1.35 bar Return 80 K, 1.1 bar flex Supply screen 5 K, 1.2 bar Screen supply 5 K, 1.2 bar TT PT LT EH TT EH TT PT LT Vapor return 4.5 K, 1.1 bar 1.35 bar Screen return 80 K, 1.1 bar VLP 3 K, 30 mbar flex Double channel coaxial bayonet Internally sealed flange, externally sealed mobile sleeve Internally welded, externally sealed mobile sleeve

Work progress and conclusions 15K. Brodzinski - CC coordination Work is progressing well, specification for cold part of the infrastructure advanced in ~50 %, order to be done in Autumn 2015, produced by end of 2016 for SM18 test on the beginning of 2017, New cold box to be ordered in Autumn 2015 to be delivered at CERN by mid 2017, Regular progress meeting between CRG and MME necessary from mid May 2015 (every week or 2 weeks), Close collaboration between CRG and MME concerning the CC cryomodule in place and to be continued, Definition of location for SPS test strongly needed!