Real Time Data From the Plate Boundary Observatory Continuous GPS Network Mike JacksonUNAVCO PBO Directorand the PBO Staff AGU Joint Assembly May 26, 2009.

Slides:



Advertisements
Similar presentations
John A. Orcutt Deputy Director, SIO Ocean Observations Initiative NSF MREFC Chair, NSF/CORE DEOS Comm.
Advertisements

March 11 M9.0 Tohoku Earthquake +60s: Mw 8.47 GPS can rapidly constrain momentGPS can rapidly constrain moment +90s: Mw s: Mw 9.04.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Role of Space Geodesy In GEOSS Timothy H. Dixon University of Miami/RSMAS and Center for Southeastern Advanced Remote Sensing (CSTARS)
M. Gende 1,2, C. Brunini 1,2, F. Azpilicueta 1,2 Universidad Nacional de La Plata, Argentina 1 CONICET, Argentina 2 La Plata Ionospheric Model as a tool.
March 25, 2002EarthScope CSIT Workshop Data Archiving and IT Issues for PBO Douglas Neuhauser UC Berkeley Seismological Lab Northern California Earthquake.
Overview 1. (L1) Cascadia real-time GPS Station Network (PANGA + PBO) 2.(L2) GPS processing (phase+psuedorange data -> position estimates) 3.(L3) EEW.
1 U.S. Department of the Interior U.S. Geological Survey Earthquake Monitoring and Reporting through the Advanced National Seismic System Briefing for.
Subduction Zone Observatory An international multi-disciplinary observatory along a subduction zone plate boundary (ies?) “subduction collaboratory” 2014.
Electricity Meter Installation QC and Audit Total Geo-spatial Information Solutions Johann Engelbrecht Director.
Instituto de Meteorologia, I.P. Department of Seismic and Geophysical Monitoring NEAREST 1 st Meeting, Bologna, October 2006.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
Yellowstone Volcano Observatory (YVO) Jake Lowenstern USGS Bob Smith UU.
Marilyn T. Smith, Head, MIT Information Services & Technology DataSpace IS&T Data CenterMIT Optical Network 1.
An Earth science program to explore the 4D structure of the North American continent.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Integrated Analyses for Monitoring and Rapid Source Modeling of Earthquakes and Tsunamis Brendan Crowell Subduction Zone Observatory Seminar May 13, 2015.
Oracle Database Administration. Rana Almurshed 2 course objective After completing this course you should be able to: install, create and administrate.
Project Management and Scheduling
Business Continuation Plan / Program Overview State CIO Council Meeting June 24, 2008.
November 2009 Network Disaster Recovery October 2014.
DORIS - DAYS Toulouse May 2-3, 2000 DORIS Doppler Orbitography and Radiopositioning Integrated by Satellite  Basic system concept  Main missions  Schedules.
U.S. Department of the Interior U.S. Geological Survey Volcano Monitoring Plans for the Northern Mariana Islands USGS & CNMI Emergency Management Office.
GPS Technology Tech Talk April, 2008 Chad Halvarson.
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.
Meeting the ANSS Performance Standards & Future CISN Infrastructure CISN-PMG Egill Hauksson, Caltech Presented to CISN Steering and Advisory Committees.
1 GNSS Reference Station Network Applications – Status and Vision Herbert Landau Trimble Munich, Germany January 2011.
Shelley Olds, UNAVCO Getting to know EarthScope Plate Boundary Observatory & UNAVCO.
Leveraging research and future funding opportunities Hajo Eicken Geophysical Institute & International Arctic Research Center University of Alaska Fairbanks.
Renato U. Solidum, Jr. DOST-PHIVOLCS My EARTHly Experience as a Leader.
A U.S. Sponsored Observing System of the Global Earth Observing System of Systems  Focus on the Network –Data Management –Products Global Seismographic.
Cuban Seismic Network National Centre for Seismological Research (2010) Ing. Eduardo R. Diez Zaldívar. Centro Nacional de Investigaciones Sismológicas.
1 EarthScope: Plate Boundary Observatory William Prescott UNAVCO, Inc AAPG Meeting Salt Lake City, Utah 12 May 2003.
SCSC 311 Information Systems: hardware and software.
Space Geodesy (1/3) Geodesy provides a foundation for all Earth observations Space geodesy is the use of precise measurements between space objects (e.g.,
How Does GPS Work ?. Objectives To Describe: The 3 components of the Global Positioning System How position is obtaining from a radio timing signal Obtaining.
Module 4: Fundamentals of Communication Technologies.
Department of Information Engineering The Chinese University of Hong Kong A Framework for Monitoring and Measuring a Large-Scale Distributed System in.
Overview of EarthScope 2010 May, 2010 Slides that may be used and modified for presentations involving instrumentation, data, science results, and education.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Brief history, Current Activities & ARRA Improvements David Oppenheimer – USGS Menlo Park.
DEV234 Project Management For.NET Developers Marc Gusmano Director of Emerging Technologies The Information Management Group.
Applications for Precision GPS: Seismology, Volcanic Eruptions, Ice Sheet Dynamics, and Soil Moisture Kristine M. Larson Dept. of Aerospace Engineering.
Oregon Real-Time GPS Network Oregon GPS Users Group Civil GPS Service Interface Committee Bend, OR Ken Bays, PLS ODOT Geometronics Unit 15 June 2007.
Virtual Emergency Management Information Systems Peter Anderson Steve Braham Simon Fraser University Vancouver, Canada.
Some Thoughts on IMW And Opportunity We represent a big area of the ANSS national program Bob Smith Univ. of Utah.
First SNARF Workshop: Introduction Stable North America Working Group UNAVCO Inc., 27 Jan 2004 Geoff Blewitt University of Nevada, Reno.
Foundations of Geospatial System Development II Todd S. Bacastow Professor of Practice for Geospatial Intelligence John A. Dutton e-Education Institute.
Borehole Strainmeters: Instruments for Measuring Aseismic Deformation in Subduction Zones Evelyn Roeloffs U.S. Geological Survey, Vancouver, WA.
GSN Budget CoCom meeting Chicago April 9-10, 2012.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
Module 1 Introduction to Designing a Microsoft® Exchange Server 2010 Deployment.
Processing and Analysis of GeoEarthscope and Other Community LiDAR Topography Datasets April 30 - May 1, 2008 Arizona State University, Tempe, AZ Christopher.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
ICALEPCS 2005 Geneva, Oct. 12 The ALMA Telescope Control SystemA. Farris The ALMA Telescope Control System Allen Farris Ralph Marson Jeff Kern National.
11 i Upgrade: Is an Assessment Useful for Your Company? By: Bernard Doyle, Applications Software Technology Corp. Marie Klein, Information Resources Inc.
Module 9 Planning and Implementing Monitoring and Maintenance.
Information Technology Services Strategic Directions Approach and Proposal “Charting Our Course”
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
Considerations for Regional Data Collection, Sharing and Exchange Bruce Schmidt StreamNet Program Manager Pacific States Marine Fisheries Commission Presentation.
USGS Tsunami Activities 5 Year Review
Lessons from EarthScope
United States Coast Guard
CAC Spectrum Monitoring Program Status 6 April, 2016
REF TEK Technology Overview
Sustaining HPWREN – Consider CRTN Model
Real Time GPS in Los Angeles
Leveraging AI for Disaster Preparedness and Response
Presentation transcript:

Real Time Data From the Plate Boundary Observatory Continuous GPS Network Mike JacksonUNAVCO PBO Directorand the PBO Staff AGU Joint Assembly May 26, 2009

PBO GPS Network

GPS Station Layout MET Station

Cascadia Real Time Why are real-time geodetic data products important? Why are real-time geodetic data products important? For science-based hazard monitoring, real-time geodetic data are critical for determining static and dynamic displacements, slow slip and early post-seismic transients, and critical measurements between the seismic frequency band and static displacements. For science-based hazard monitoring, real-time geodetic data are critical for determining static and dynamic displacements, slow slip and early post-seismic transients, and critical measurements between the seismic frequency band and static displacements. Decisions and response can only be made as fast as the data are provide. Decisions and response can only be made as fast as the data are provide. UNAVCO will provide realtime data delivery UNAVCO will provide realtime data delivery Essential data products such as position estimates, tropospheric water content, ionospheric electron column density are not included in this proposal. Essential data products such as position estimates, tropospheric water content, ionospheric electron column density are not included in this proposal.

UNAVCO Real-time Geodetic data What real-time GPS data are available from PBO?What real-time GPS data are available from PBO? What are the critical constraints on delivering real- time GPS data?What are the critical constraints on delivering real- time GPS data? Who are the primary customers of these data sets?Who are the primary customers of these data sets? What are the future plans with respect to real-time data for the PBO?What are the future plans with respect to real-time data for the PBO?

UNAVCO PBO RT Data What are the availability of real-time geodetic products?What are the availability of real-time geodetic products? Currently UNAVCO in a beta-test phase streaming GPS data from ~84 PBO stations with an average receiver to PBO server latency of 1.11 s and an average of 93.2% data completeness. Data completeness is low because we are testing the “good, the bad, and the ugly” data communications scenarios.Currently UNAVCO in a beta-test phase streaming GPS data from ~84 PBO stations with an average receiver to PBO server latency of 1.11 s and an average of 93.2% data completeness. Data completeness is low because we are testing the “good, the bad, and the ugly” data communications scenarios. For UNAVCO RT beta-test we are using a broad range data communications types including direct internet, VSAT, CDMA modem, and IP radio.For UNAVCO RT beta-test we are using a broad range data communications types including direct internet, VSAT, CDMA modem, and IP radio. Note these are raw data only. Providing epoch-epoch solutions is a critical component of a science and hazards system.Note these are raw data only. Providing epoch-epoch solutions is a critical component of a science and hazards system.

What are real-time geodetic data and how do you assess the quality?What are real-time geodetic data and how do you assess the quality? The definition of real-time data depends on the on the science target, sampling, rate, and latency of data from instrument to user.The definition of real-time data depends on the on the science target, sampling, rate, and latency of data from instrument to user. For earthquake and volcano science and hazards applications we use a a 1 Hz sampling interval and latency requirement of < 5 seconds for data between station to processing center.For earthquake and volcano science and hazards applications we use a a 1 Hz sampling interval and latency requirement of < 5 seconds for data between station to processing center. Also need to define a “completeness” metric. For earthquake and volcano hazards applications we use a 95% data completeness requirement.Also need to define a “completeness” metric. For earthquake and volcano hazards applications we use a 95% data completeness requirement. Other considerations include station up-time and the ability to respond to maintenance issues.Other considerations include station up-time and the ability to respond to maintenance issues. Real-time Geodetic Data Definitions

Latency and Completeness Average latency 1.11 s Average completeness 93.2%

Cascadia Real-time NSF proposed real-time upgrade of 232 stations in Cascadia.NSF proposed real-time upgrade of 232 stations in Cascadia. Funded as part of the American Recovery and Reinvestment Act (ARRA)Funded as part of the American Recovery and Reinvestment Act (ARRA) Three year implementation planThree year implementation plan Initial upgrades focused on ETS critical stationsInitial upgrades focused on ETS critical stations Priority based on science target, time line, location of personnelPriority based on science target, time line, location of personnel Before

Cascadia Real-time Station upgrades include power augmentation and upgraded data communicationsStation upgrades include power augmentation and upgraded data communications 3-G CDMA modems3-G CDMA modems removing VSATSremoving VSATS high speed radio networkshigh speed radio networks Purchase data distribution and QC software including latency, completeness, position estimationPurchase data distribution and QC software including latency, completeness, position estimation After

Year 1 Start work Fall 2009Start work Fall 2009 Upgrade Mount St. Helens stationsUpgrade Mount St. Helens stations Upgrade 86 stations in fore- arcUpgrade 86 stations in fore- arc Work driven by science targets and location of personnelWork driven by science targets and location of personnel Year 1

Year 2 Year 1 Upgrade 37 fore- arc stations in OregonUpgrade 37 fore- arc stations in Oregon Upgrade high altitude sites including Mt. Shasta/LassenUpgrade high altitude sites including Mt. Shasta/Lassen

Year 3 Year 2 Year 1 Upgrade remainder of back-arc stationsUpgrade remainder of back-arc stations

Project Milestones

Budget

Personnel PersonnelFTE Time (yrs.) Field Tech Field Engineer I 23 RT Network Admin 0.55 Database0.255 Archive0.255 Education and Outreach 0.55

Data Distribution