Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23, 2015 1.

Slides:



Advertisements
Similar presentations
Homework of HLRF 1 Shigeki Fukuda KEK 2012/4/23 HLRF Homework1 in KILC12 (Fukuda) 1.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/2010 DRFS HLRF System KEK S. Fukuda Introduction: Basic Concept of DRFS Progress.
Christopher Nantista ILC 2 nd Baseline Assessment Workshop (BAW-2) SLAC January 18, …… …… …… … ….
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
1 Availsim DRFS and klyClus setup, assumptions, questions Tom Himel August 11, 2009.
GDE meeting September 29, Availability Task Force Progress Report Tom Himel for the Availability Task Force Putting the Linac in a single tunnel.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Aug 23, 2006 One-vs-Two Tunnel Tradeoffs (America’s Specific) Chris Adolphsen With contributions from the Civil Group, John Carwardine, Ray Larsen and.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
John Carwardine, Ewan Paterson, Marc Ross 14/15 July 2009 Availability Task Force: Subgroup #2.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Block Diagram e- source e- DR e- RTML e- ML e+ source e- BDS e+ BDS e+ ML e+ RTML e+ DR Factor availability of single-tunnel housing out of overall availability.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
June Recent Development of DRFS (Fukuda) SCRF-Meeting 1 1 Recent Development of DRFS (Based on Japanese CFS Tunnel Plan) S. Fukuda KEK.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Availability studies for SB2009 Focus: relative availability performance of proposed single tunnel schemes (with respect to RDR) – Klystron Cluster – Distributed.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Dark Current and Radiation Shielding Studies for the ILC Main Linac
Conventional Facilities and Siting Global Group (ARCFS)
Americas KlyCluster Cost Analysis Overview
Hybrid Pixel R&D and Interconnect Technologies
Integration Ideas for the Central Region Some old some new
Second SPL Collaboration Meeting, Vancouver May 2009
Availsim runs and questions
Radiation protection of Linac4 M. Silari Radiation Protection Group
CEPC RF Power Sources System
Overview of Day One – 29 Feb 2016
Central Region Working Group
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions and the Impact on Operations Ewan Paterson LCWS15 Meeting NOV 3, /24/2019.
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,

History of Shielding RDR 2007 Assumed site independent twin tunnel design, one beam tunnel and one service tunnel which can be accessed by people (Rad workers) at any time. SB 2009 Study single tunnel designs and operational “Availability” of accelerator systems in different scenarios. Began developing RF systems for a Single Tunnel Linac. DRFS with many 800kw klystrons in a variety of configurations all inside the tunnel. KCS Klystron Cluster with 20 x 10 MW tubes combined in surface buildings, delivered to and distributed in the tunnel through over-moded wave guide. By 2011 both systems were accepted as having acceptable availability but site dependent choice and more R&D still required Kamaboko tunnel with shield wall proposed for selected Japanese deep site. Development of KCS an DRFS stops and we are back to two tunnel equivalent in preparation for the TDR In the TDR the choice of RF distribution system is site dependent. KCS on the surface for shallow tunnel and some form of DRFS in a deep tunnel. Japan proposes a real (deep) site and we go with Kamaboko tunnel with a wall! 2

Shield Wall Today The baseline design is 3.5 meter but this is very conservative and we need to review the assumptions. 18 MW being lost is unrealistic but even with the best machine protection system, in some future scenario perhaps one might have to consider beam losses of close to a megawatt in a few places in the machine. The wall could be thinner but probably not much less than 2.5 m (my best guess) as long as there is the potential for high power beams on the other side. One could have a variable thickness wall tailored to local conditions but this would be very restrictive in the future as it would be very difficult to change. Let us re-open, in 2015, the question of a single tunnel. WHAT IS NEW? 3

Single Tunnel Today Today we have only one site and it is deep underground and the only option for a single tunnel for the linac RF systems is to have the klystrons etc in the tunnel with both beams and the RF off for any access for maintenance, other system commissioning or development. In the past the Availsim assumptions had 40 to 50 Khrs for the MTBF of the “new’ 10MW tubes and this meant that you needed a >10% energy overhead (installed spares) to maintain the desired availability goal. This needs to be changed based on experience. The tubes were designed (by three manufacturers) to have lifetimes of > 100 Khrs. They are multibeam tubes with low cathode loading and low voltage and they should have lifetimes comparable to the 800 kw tubes in the DRFS system design. So far, experience indicates that this is a valid assumption and could be used in a single tunnel with only a 4.to 5 % energy overhead as is required in the twin tunnel models for maintenance and availability. DO WE NEED A WALL? YES but thinner! 4

A Thin Wall Possible Design In the given site, now the only site under study, there are kilometers between exits and personnel safety depends on having more frequent ( few hundred meters) escape routes. This means we need some firewall between two parts of the tunnel, with periodic access between them. This separator wall has to be fireproof and reasonably air tight for smoke or oxygen deficiency hazards. A 30 cm thick concrete wall would satisfy this problem but there are more! 1)Shielding against long term radiation damage to electronic components in normal operation. Could be done locally or with the wall, if thick enough to satisfy the following. 2)Personnel shielding from dark currents while RF processing, and testing or maintenance with all systems ON but NO primary beam. The on-going studies of dark current behavior are important and probably determine the minimum wall thickness at (I hope) ≤ one meter! Note one is not concerned with captured dark current in this case as one can alternate klystron phases to prevent acceleration. IN THIS NEW SCENARIO, DURING A SCHEDULED MAINTENANCE DAY ( or an unscheduled access) ALL BEAM IS OFF BUT ALL POWER SUPPLIES AND RF ARE ON AND ACCESSABLE BEHIND THE WALL. ONE CAN STILL MONITOR OR LOCALLY TEST MOST OF THE HARDWARE BUT HAVE NO BEAM INFORMATION. THIS SCENARIO IS WORTH CONSIDERATION 5

Impact of No Beam During Access Impact not as bad as one initially thinks. PS’s and RF stay on and warm. In the linac to change klystrons on every two week maintenance days, the beams have to be safely turned off upstream of where you need to open the waveguide. This means no beams downstream of the linac during most maintenance days. 2 to 3 Klystrons per 2 weeks require a change and processing time. This means no E+ on most days without auxilliary e- source, one day every two weeks! Not worth tuning up for one day? Thin wall will benefit central region if one changes from twin to Kamaboko tunnel ??? 6